Av-Tech Industries- Quality, Service and Precision Kitting

Slides:



Advertisements
Similar presentations
HIV Drug Resistance Training
Advertisements

Littlefield Technologies: Overview
WAREHOUSING MANAGEMENT
WAREHOUSING MANAGEMENT
8D Corrective Action. 2 8D Problem Solving & Corrective Action: Initiate 8D Corrective Action D1 - Create Problem Solving Team D2 - Define the Problem.
On-Site Services Spectrum BioScience … –Saves you time by Doing routine tasks non-core related –Saves you money… Connects you to researched sources of.
Global Supplier Quality Manual PPAP Requirements
Electronic Components Distributor Electronic Components Distributor Delivering Service, Quality, and Value Delivering Service, Quality, and Value.
Feedstock xSi Advantages Considerations Origin European produced phosphorus oxychloride with proven track record ensuring consistent in-coming quality.
Gilbarco Printer Assembly Process Flow Overview Next Generation Contract Manufacturing.
Fergal Carton / AFIS MBA 642 / BIS Foundation. Fergal Carton / AFIS MBA 642 / BIS Foundation DELL Direct model Price for Performance –No resellers, retailers.
Nomad Aviation Employee Training on ISO 9001 – the globally recognized quality management system 1ISO 9001 Training for Employees-Rev. B.
QLF Contract Quality Clauses Working Group QUALITY LEADERSHIP FORUM CONTRACT QUALITY CLAUSES WORKING GROUP Ken Crane MSFC September 24, 2002.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Strategy, Balanced Scorecard, and Strategic Profitability Analysis.
Quality Management System
Material Management. Materials should be ordered early –Minimize risk of price inflation, lack of materials –Just in time delivery minimizes space required.
Global Manufacturing and Materials Management
Strategy, Balanced Scorecard, and Strategic Profitability Analysis
OPERATIONS MANAGEMENT for MBAs Fourth Edition
Supply Chain Logistics Management
PACKAGING & MATERIALS HANDLING
WAREHOUSE MANAGEMENT Industrial Logistics (BPT 3123)
Objectives 4 Understand the ISO standards. Why are standards required? 4 Need standards to ensure that a term means the same for all 4 Need company standards.
ILearningCampus.com Understanding by doing and learning by talking.
IntelliTrack ® WMS An Overview and Approach Powerful, Full Featured, Affordable.
Source One Network Solutions with Corporate Headquarters based in Fitchburg, Wisconsin specializes in providing multi- location clients, with nationwide.
PRODUCTION PROCESS SchedulingInventory Incoming QC BinningPre-assemblyCalibration Final Assembly Final QA Packaging & Shipping.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
CLEANROOM SOFTWARE ENGINEERING.
Operations Management Class 20 Tuesday 11/8/11. Operations Management (OM) The development and administration of the activities involved in transforming.
From Research Prototype to Production
Cullen College of Engineering RFID-Based Solutions for Piping Technology Piping Tech & UH July, 2007.
SAP ERP Sales and Distribution Solutions
ALCOM Confidential 1 Supplier Controlled - Safe Launch Plan Sep 2013.
Animal Feed Safety System P Timothy E. Costigan Manager of Quality and Analytical Services Prince Agri Products, Inc.
Agenda Why Not? Discussion/Open Forum Why? Discussion/Open Forum Service Model Value Added Services Lifecycle Management Products Now Why Not?
Agenda PartStock Company Overview Service Model Value Added Services Lifecycle Management Products Why Choose PartStock?
Price Considerations for TB Drugs. Goals of Effective Procurement Selecting appropriate medicines Meeting required quality standards In right quantities.
Principles of Business, Marketing, and Finance Lesson Eleven Wholesalers in a Private Enterprise System UNT in partnership with TEA, Copyright ©. All rights.
Flow Planner Presentation Selected Case Studies. Internet / Intranet based Process Engineering Flow Planner Features Analyze an unlimited number of flow.
Chapter 14 Copyright ©2012 by Cengage Learning Inc. All rights reserved 1 Lamb, Hair, McDaniel CHAPTER 14 Supply Chain Management © iStockphoto.com/Robert.
Course of MT- 362 Material Handling Lecture # 3.
NASA Quality Leadership Forum: Supply Chain Management Case Study Ken Ortiz/Alphaport, Inc. net-inspect ™
Chapter 24 Stock Handling and Inventory Control Section 24.1 The Stock Handling Process Section 24.2 Inventory Control Section 24.1 The Stock Handling.
DENSO Supplier Labeling Policy
5 © The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin 5 5 Slide 5-1 Target Costing,Theory of Constraints, and Life-Cycle Cost.
Customer Base Expectations  Collaborative Supply Chain Models  Proactive Solutions  Aggressive Pricing  Ease of Doing Biz  Favorable/Fair Terms and.
Insulating Glass Manufacturing Quality Procedure Manual TM (07)
Production Part Approval Process
ERP/QMS by PMI Aerospace ERP/QMS by PMI Aerospace
It’s…….
The Compelling Solution . .
Av-Tech Industries – DIVISION OF FASTENAL The MAAG Kit System
SCM Customer Service Operations LB 3
Common Learning Blocks
External Validation of Quality Programs
Ship To Module – Supporting Documentation Guide
Procurement’s Impact on Logistics.
WAREHOUSE MANAGEMENT SYSTEM SOFTWARE
Innovia Consulting Customer Conference 2018
Lowering Costs Through Unique Solutions
KAMAN AEROSPACE GROUP L. Chodasiewicz - Supplier Quality Assurance.
ISO 9000 Dr. S. Thomas Foster, Jr..
Production Part Approval Process
CUSTOMER (Requirements) CUSTOMER (Satisfaction)
BULK COMPONENT FEEDING Key drivers User benefits Issues & Barriers
External Validation of Quality Programs
3PL Logistic Software. What is a 3PL? You take the orders. Your third-party logistics provider (3PL) fulfils them. It’s that simple and if it’s seamless,
Presentation transcript:

Av-Tech Industries- Quality, Service and Precision Kitting Av-Tech is a proven quality supplier of Kits to ULA, Lockheed Martin, Macro Industries and Northrop Grumman. Quality starts with inspection and verification of all components to customer requirements. Our quality services include controlled secure storage and electronic tracking of all components throughout the inspection, validation, kitting and shipping processes. Av-Tech now provides the highest level of precision kitting in the industry utilizing the MAAG Kit system. We also specialize in Bag & Tag Kitting and smaller tackle box style kits.

Av-Tech Industries Final Inspection and Shipment of Kits Assembly and verification of Kit Configuration to BOM Final inspection to include FOD control Processing of test reports and certifications Source Inspection of completed Kits if required Security to prevent tampering until point of use if required Uploading of all required documentation to customer site Packaging and shipping of Kits per customer requirements

Benefits and Features of Kitting Kitting increase overall productivity Kitting reduces lost assembly time Delivery direct to Point of Use Kitting contains all parts required for specific assemblies Defect free hardware MAAG Kits reduced FOD due to: Less handling by technician Greatly reduced packaging (bags and labels)

Benefits to Customer Lower procurement costs due to purchasing total kit quantities for better pricing Lower production costs through time savings Reduced installation costs Reduce total inventory investment Turn around time is greatly reduced MAAG Kits and tackle box style kits are reusable for many ship sets Flexibility in revisions of kits (simple cell changes with MAAG Kits) Greatly reduced potential for packaging errors Reduced escapes due to FOD, Quantities and hardware damage

Sample Kits – MAAG Kits

Sample Kits – Bag & Tag Kits

Sample Kits – Tackle Box Kits