Salvador Da Bahia Landfill Gas Project: Baseline Methodology

Slides:



Advertisements
Similar presentations
Head of Policies & Planning Division Ministry of Environment
Advertisements

Technology Transfer in the CDM DUAN Maosheng Tsinghua University Linking Climate Mitigation Policy and Modeling in China Workshop February 18, 2006 Beijing.
CDM METHODOLOGIES IMPROVEMENT 7 th CDM Joint Coordination Workshop th March 2011, Bonn, Germany Anne-Sophie Zirah - March 2011.
Fundamentals of PDD Analysis Recap of Theory and presentation of an illustrative PDD by Steve Thorne Maputo second SSA regional workshop 17 August 2004.
Capacity Development for CDM - National Workshop on PDD, Cairo June Capacity Development for CDM Fourth National Workshop Cairo, June.
PDD Preparation Cairo, June 14-15, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXVega Bahia Landfill Project Design Document.
Yuji MIZUNO Institute for Global Environmental Strategies Baseline for Waste Management Project Regional Workshop in Asia on Capacity Development for the.
ww.neprisoe.org CDM Methodologies Carbon Markets – CDM project development 8. August 2011 Jørgen Fenhann.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth COP 9 5 th December 2003.
World Bank Workshop on CDM Methodologies and Technical Issues Associated with Power Generation and Power Saving Project Activities December 3, 2005 Montreal.
Joint Implementation & Gas Flaring Reduction Projects Alexandrina Platonova-Oquab Carbon Finance Unit, World Bank.
CDM PoA Development Case Study: Morocco Municipal Solid Waste.
Capacity Development for Clean Development Mechanism Project Idea Note (PIN) Preparation by Kofi Asante.
Case Study: Gemina rice husk project, Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
Djerba Carbon Exhibition Djerba, September 22-24, 2004 Onyx Gas Capture and Flaring ProjectOnyx Gas Capture and Flaring Project Alexandria, Egypt Amr Abdel-Aziz,
The First Carbon Exhibition
Introduction to Climate Change: - global warming - basis steps in a clean development project - connection of CDM with European Trading Scheme Wim Maaskant.
Examples on how the additionality is addressed in the three Projects approved by the National CDM Council in Morocco (DNA) Important Issues to address.
Creating the Carbon Asset: PCF Approaches to Baselines and Additionality Sao Paulo, Brazil November 20-22, 2002.
Simplified Financial Analysis for Landfill Gas Capture Projects Presented By: Dr. M. K. Elewa TIMS - Egypt Approved Baseline and Monitoring Methodology.
Carboncredits.nl Baseline Methodologies Dispatch Analysis Gerhard Mulder Project Officer.
CDM Project Developers Workshop.  Boundaries & Leakage  Calculating emissions reductions  Any other issues Session II.
CDM implementation in Korea Gyungae Ha Center for Climate Change Mitigation Projects Korea Energy Management Corporation October , AIT, Thailand.
Module 6: PINs M6. M6. PINs Contents: Project Identification Notes – how to structure them (including eligibility, baselines and additionality) Two projects.
CDM Project Developers Workshop.  Baselines – what, types of baselines, baseline scenarios, baseline emissions.  Additionality – what, why, how  Establishing.
Additionality and Project Cycle Tunis, August 27-29, 2004 TIMS/EEAA CD4CDM- Fourth Regional Workshop (Phase II) UNEP RISOE / APEXAdditionality in NovaGerar.
Baseline Cairo, March 31 & April 1, 2004 TIMS/EEAA CD4CDM- Second National Workshop (Phase II) UNEP RISO / APEXPotential CDM Project for a Landfill in.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
MUNICIPAL SOLID WASTE MANAGEMENT AND CARBON FINANCE Carbon Finance Unit Training Session Charles Peterson and Ahmed Mostafa March 29, 2007.
1 Second Regional Workshop Capacity Development for the Clean Development Mechanism (CD4CDM) 23 March 2004 Siem Reap, Cambodia A.T. Biopower Rice Husk.
Methodologies for Moldova Soil Conservation project ARNM0007 Rama Chandra Reddy July 12, 2005.
AIT Baselines and Additionality Sudhir Sharma Asian Institute of Technology Bangkok, Thailand 24 th March 2004.
Adaptation to Climate Change Actions in Mongolia Adaptation Workshop IFAD, Rome May 2007.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
THE WORLD BANK World Bank Experience in Landfill Gas and Prospects for Indonesia Dr. John Morton Environmental Specialist The World Bank East Asia and.
Greenhouse Gas (GHG) Permit Training PSD Applicability Example Landfill Applicability Examples John Calcagni, EPA Region 4.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth Accra, Ghana 7 th and 8 th November 2005.
1 Basics of CDM Development Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
CDM Project Cycle LGED Bhaban, Dhaka 8 – 9 April 2008 Presented by Khandaker Mainuddin Fellow, BCAS.
UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, January 2004.
El Gallo Hydroelectricity Project PDD Analysis
Salvador Da Bahia Landfill Gas Project: Baseline Methodology 1 of the 1 st 2 methodologies recommended for approval by the Meth Panel, July 2003.
CD4CDM Philippines Salvador da Bahia Landfillgas Project (PDD Presentation)
Accessing Carbon Finance Workshop on Landfill Gas Development and the CDM Denpasar, Indonesia. September 5-7, Sn. Environmental Specialist. Lasse.
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, Capacity Development for CDM Cairo, March 31 & April 1,
Quantification of the CDM effect: PT.NOEI Integrated Solid Waste Management Project in Bali Mitsubishi Securities Clean Energy Finance Committee Workshop.
Case Study: Gemina Rice Husk Project Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
FY 2015/16 Financial Overview Revenues: Operating revenues for FY 2015/16 are projected to be approximately $116,550 or 1.6% higher than operating revenues.
UNEP Collaborating Centre on Energy and Environment Use and Conceptualization of Power Sector Baselines: Methodology and Case Study from El Salvador Lasse.
Ecuador frente al mercado global de carbono CD4CDM in Ecuador CD4CDM side event at CoP-10 Buenos Aires, 11/XII/2004 Marcos Castro Ecuadorian CDM Promotion.
Case study 1 Review comments on Baseline Methodology Waste heat use project Prepared by Nguyen Van Hanh Vietnam.
NAMA potential of Vietnam Vuong Xuan Hoa Institute of Meteorology, Hydrology and Environment Ministry of Natural Resources and Environment Climate Change.
CDM Project Design Document CDM Project Design Document Training Course May 22, 2003 CCIC Conference Room Manila Observatory Ateneo de Manila University.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
Baseline approaches and methodologies: interpretation of Para 48(a)-(c) M&P Buenos Aires, – December 5 th, 2004 Johannes Heister – World Bank, Carbon Finance.
How to Develop Landfill Gas CDM Projects with Local Municipal Authorities? Kok Kee Chow, Managing Director, Sustainable Technology Resource Centre STREC.
1 Climate and Deforestation Positive incentives to reduce deforestation emissions in developing countries: views from Brazil.
Pennsylvania Climate Change Act
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide
German Emissions Trading Authority (DEHSt)
The role of the Passport Indicators in Monitoring PFM Strategy
CDM Methods and project design: Baselines
Methodological issues/challenges
Tajiguas Resource Recovery Project Doing More with Our Waste
Energy performance and Carbon emissions Assessment and Monitoring tool
Carbon Footprint.
Small-Scale Projects Under JI
Possibilities for promoting environmental protection projects
Enhanced transparency framework and examples of flexibilities
Introduction to HPMP.
Presentation transcript:

Salvador Da Bahia Landfill Gas Project: Baseline Methodology 1 of the 1st 2 methodologies approved by the CDM Executive Board, August 2003

Description of the project activity: The landfill has a total capacity of 18,000,000 m3 and receives approximately 850,000 tonnes/year of domestic waste. The Project involves installing equipment for methane destruction with capacity of 6,250 m3/hr in 2000 (expanding to 46,250 m3/hr in 2020). The equipment will consist of enclosed flaring with controlled burning condition.

. Brief explanation of how the anthropogenic emissions of anthropogenic GHGs by sources are to be reduced by the proposed CDM project activity... Anthropogenic emission of GHG at Salvador Landfill occurs when methane produced at the landfill is not destroyed; The proposed project activity pretends to better the landfill gas capture and destruction efficiency by increasing the total amount of gas to be destroyed over the amount determined by the landfill concession contract.

Why the emission reductions will not occur in the absence of the proposed activity? Landfill contract barriers to investment: The Salvador municipality established the maximum price to be paid for the landfill activity in 1999 at 16.69 R$/ton (5.6 US$/ton). The winning price Vega has proposed was 15.86R$/ton (5.3 US$/ton). The price includes landfill design, licensing, construction, operation and aftercare for a period of 20 years.

Why the emission reductions will not occur in the absence of the proposed activity? (Cont.) There was no specific requirement on gas management. Any investment or operation to destroy more than the contractual amount is additional and will not have other form of remuneration other than the CERs. In baseline study the total cost was estimated to be 45 Millions of BRL for the period 2003 to 2019 shared between investment cost (flares and gas capture works) and operation cost (electricity for pumping gas, gas network maintenance, handiwork..).

Why the emission reductions will not occur in the absence of the proposed activity? (Cont.) National and sectoral policies Typical recovery of methane or biogas is minimal and there is no regulatory requirement governing its recovery. A conservative estimate of 20% recovery of methane gas for passive system has been considered as the best practice based on a waste management study.

Why the emission reductions will not occur in the absence of the proposed activity? (Cont.) National and sectoral policies There is no national framework governing landfill practice and only technical norms issued by the Brazilian Association of Technical Norms without any technical requirement on LFG management. A Study on basic sanitation for State of Bahia shows that in 2000, 60% of MSW was treated in inappropriate site or with simple control, and 39.4% in sanitary landfills.

Project Additionality Assessment Baseline: Concession agreement between VEGA and the Municipal Government of Salvador da Bahia Capture and destruction rate of 19-24% of the methane that will be generated from the entire landfill CDM Project: Collection system and destruction capacity will be expanded and improved so that an estimated 75-80% of the methane will be destroyed

Project Additionality Assessment Procedure: Investment analysis Baseline has a higher NPV Baseline has NPV > 0 Concessionaire is paid fixed fee per ton of waste entering the landfill covering all construction and operating cost Without CERs, CDM Project has NPV < 0 If there are no CER revenues, concessionaire will not receive additional revenue (from the present contract) to improve significantly landfill capture and destruction efficiency which will be costly

Project Additionality Assessment Baseline NPV CERs No CERs Present Contract CDM Project

B. Baseline methodology Title and reference of the methodology applied to the project activity: Contractual amount of landfill gas capture and flaring defined through public concession contract.

Justification of the choice of the methodology and why it is applicable to the project activity The selection of baseline is straightforward because of the existing contractual document between VEGA and the municipality governing the volume of methane gas to be captured; The legal document covers the contractual lifetime and therefore represents an actual crediting period; There is no regulatory requirement governing the recovery of methane or biogas in Brazil;

Description of how the methodology is applied in the context of the project activity: The calculation of baseline and project emissions is estimated from the volume of landfill methane destroyed as measured in the project minus the volume indicated in the original technical proposal submitted to the Municipal Government of Salvador; The emissions from existing electricity generation and the avoided emissions from displaced electricity generation have not been used to calculate CERs to ensure a straightforward and conservative baseline;

EmLandfillbaseline = baseline emissions from landfilled waste Description of how the methodology is applied in the context of the project activity (cont): The emissions reductions from proposed landfill gas management project are calculated by: Project Life-time Emissions Reductions = yr (Annual Emissions Reductions) = yr [(EmLandfillbaseline - EmLandfillProj.) Where: EmLandfillbaseline = baseline emissions from landfilled waste EmLandfillproj. = project emissions from landfilled waste Yr = project years

Discussion on the conservatism of the baseline methodology when applied to Salvador project. Previous studies including World Bank studies, and a recent Brazilian Environment Ministry study show that gas capture and flaring is not conducted in more than 90% of Brazilian landfills. The Salvador de Bahia Landfill as designed by VEGA in its technical proposal is probably the only municipal landfill in Brazil that respect European technical standard in relation to bottom lining system, complete drainage layer and water management. The project is The Best Practice on the matter.

Description of how the definition of the project boundary related to the baseline methodology is applied to the project activity: All of the generation of waste occurs locally, within the confines of the country. The Baseline Study has not found leakage since the project is a closed system. Two potential sources of emissions were identified and were assessed immaterial: X CO2 emissions generated from CH4 produced by plastic decomposition; Emissions resulting from electricity used to pump methane gas. X

Recommendations of the Meth Panel on the baseline methodology: The methodology is applicable to landfill gas capture and flaring project activities where there exists a contractual agreement to capture a certain volume of methane from a landfill; Some of the required changes are: 1. The presentation of the methodology lacks clarity and conciseness. Consolidate Annex 3 and 4. 2. The contractual volume may vary with the quantity of waste disposal. Explicitly state the relationship.

Recommendations of Meth Panel on the baseline methodology cont…: 3. It is not clear if electricity generated is part of the baseline. In case methane used to generate electricity in the baseline is greater than the contracted amount, it is necessary to include this methane burnt as part of the baseline. The schematic equation should be : ER calculation = CH4 captured less (CH4 contracted amount or CH4 baseline power generation which ever is greater) Compared to proposed: ERCH4 = CH4 captured in project scenario - CH4 captured in baseline scenario

Recommendations of Meth Panel on baseline methodology cont…: 4. The financial analysis referred to in the “Baseline Study” needs to be detailed and included in Annex 3 to strengthen the additionality statement. 5. Specify the COP-accepted value for the GWP of methane (21, IPCC 1995 Guidelines) and, where necessary, perform all calculations accordingly using the correct (21 instead of 23) GWP.

Evaluation of Meth Panel on the proposed new methodology 1. General approach: The project participant choose a mix of approaches of paragraphs 48 (b) and 48 (c) of the CDM M & P although the focus is on approach 48 (c) : “The average emissions of similar project activities undertaken in the previous five years, in similar social, economic, environmental and technological circumstances, and whose performance is among the top 20 per cent of their category”. The methodology is based on the level of emissions that this top 20% would create, which was very conservatively determined.

Evaluation of Meth Panel on the proposed new methodology (cont.) Applicability of methodology across project types and regions. This methodology is applicable to landfill gas capture and flaring project activities where: There exists a contractual agreement to capture a certain volume of biogas from a landfill; The concession obligation stipulate the amounts of landfill gas to be collected by the concessionaire; Given the possibility of generating electricity from captured landfill gas, there should be no electricity generation planned.

Thank you! Marina T. Mallare Climate Change Information Center Manila Observatory Tel. No : 426-08-37 Email : marina@observatory.ph