CERN – ENGINEERING DEPARTMENT: A. Dallocchio on behalf of EN-MME

Slides:



Advertisements
Similar presentations
Thierry RENAGLIA / Ramon FOLCH FP420 Manchester Workshop December 2006 FP420 Connection Cryostat Mechanical Design & Construction Key capabilities of CERN.
Advertisements

RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
CERN-GREECE INDUSTRY DAY 31/03/2014 – NCSR “Demokritos” Athens A. Dallocchio – Engineering Department.
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
X Meeting of the Future Linear Colliders Spanish Network10-Feb-2014 Enrique Calvo Alamillo.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
Dr. Michael Peiniger Superconducting RF activities at RI Research Instruments with a focus on EXFEL cavity production.
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
FNAL Target Related Capabilities PASI 2013 Working Group 1 P. Hurh (FNAL)
CIEMAT CONTRIBUTION TO TBL PETS (January 2009) David Carrillo on behalf of the Accelerators Team.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
HIE-ISOLDE contribution packages M. Pasini BE/RF.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
Engineering Department ENEN Status of TCSP manufacturing Collimation Working Group (CWG) 24 June 2013 A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini,
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
1.3GHz Input Coupler for ILC
NEW FAST WIRE SCANNER Manufacturing review Emilien Rigutto
20 years of high average Fundamental Power Coupler designs at CERN CWRF workshop 2014, Trieste Eric Montesinos, CERN-RF, on behalf of many colleagues CWRF.
Collimator revue A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME 1 OUTLINE of the presentation Technical Support Department Collimator.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
S. Atieh EN-MME Manufacturing R&D for SPL β =1 cavities at CERN on behalf of the SPL cavities mechanical design and manufacturing team.
TD26CC PLANS FROM CIEMAT Laura Sánchez on behalf Electrical Engineering Group of CIEMAT.
Technology Department CERN-GREECE INDUSTRY DAY Monday, 31 March 2014 TECHNOLOGY DEPARTENT 2 In the frame of the Accelerators & Technology Sector at CERN,
Magnets Attilio Milanese Doing Business with CERN
MQXFB Prototype structure and plans at CERN J.C Perez On behalf on MQXF collaboration team Joint HiLumi-LARP Meeting & 24 th LARP Collaboration Meeting.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
O. Kester, NuSTAR annual meeting, 27/02/2013
Status and Perspectives of the SPL R&D R. Garoby – 6/12/2012 SPL Seminar 2012 December 6-7, 2012 CERN.
1 SLAC RC Status Report 19 July 2010 LHC Collimation Working Group Meeting Jeff Smith/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
Adjustable tuner HENRY PRZYBILSKI / PIERRE-ALAIN LEROY.
TE-MSC-MDT. FTEC Follow-Up Meeting Juan Carlos Perez TE-MSC-MDT Jose Ferradas TE-MSC-MDT 28/04/2016.
RF SC CAVITIES –a story AMICI Industry days – Padova April 2017.
Crab Cavity Technical Coordination meeting:
I. Bergevoet - Training preparation
CERN – ENGINEERING DEPARTMENT: A. Dallocchio on behalf of EN-MME
Study and Development of Large Cryogenic Systems in China
CERN – Zanon discussions
WP5 Elliptical cavities
(4 areas/website front)
11 T Dipole Integration & Plans M. Karppinen
T5.2: Harmonization - Material and Component Reference
LEP cryostat Procurement strategy and plans
Status of design and production of LEP connection cryostat
Complementary ISTC Projects #3888, 3889p
Wideband kickers Mechanical design and Fabrication
AD consolidation activities in LS2
Challenges of vacuum chambers with adjustable gap for SC undulators
Superconducting Cavities: Development/Production
HL-LHC Collimators: Components for absorbers 3rd HiLumi Industry Day - May 2017 Warrington - United Kingdom Oliver Aberle – CERN (EN-STI) On behalf of.
MECHANICAL ENGINEERING OF ACCELERATOR COMPONENTS
Parts exchange for HL-LHC AUP Q1&Q3
Superconducting RF Crab Cavities
UK RFD Pre-Series cryomodule
SRF Section Cuvée 2014.
XFEL Collimation and Beam Switchyard Vacuum Issues
LARP Rotatable Collimators for LHC Phase II Collimation
HIE-ISOLDE contribution packages
Ch. Boccard, M. Krupa, G. Schneider, R. Veness, M. Wendt
Crab – RFD prototype: Fabrication Status Update
Challenges and Deadlines for Production
Production Cryo HL-LHC BPMs
Presentation transcript:

CERN – ENGINEERING DEPARTMENT: A. Dallocchio on behalf of EN-MME Mechanical & Materials Engineering Group A. Dallocchio on behalf of EN-MME 04/04/2017 A. Dallocchio

Engineering Dept. Structure Infrastructures Engineering Coordination Production 04/04/2017 A. Dallocchio

EN-MME: Mechanical & Materials Engineering Group Engineering & Design Production Materials & Metrology Design Office: 40 designers and engineers CATIA / SmarTeam, ANSYS, LS-Dyna... Experimental Mechanics Lab. Mechanical workshop (4000 m2): 50 technicians and engineers CNC machining Assembly & metal forming Welding (TIG, MIG, electron beam, laser, vacuum brazing) Technical Subcontracting Service Material science consultancy: metallurgical analyses, microscopy, mechanical tests NDT: US, radiography, tomography Metrology: 350 m2 lab. equipped with CMM. 04/04/2017 A. Dallocchio

EN-MME Mandate: The mandate of the MME group is to provide to the CERN community specific engineering solutions combining mechanical design, production facilities and material sciences. This group owns, maintains and develops the 30 years old know-how on the mechanical construction of beam accelerators and physics detectors. Particle Beam Impact : comparison between simulation and experiment Live Acquisition system by Mech. Lab Beam F.E. Calcs Design Manufacturing 04/04/2017 A. Dallocchio

EN-MME: Mechanical & Materials Engineering Group Engineering & Design Production Materials & Metrology Design Office: 40 designers and engineers CATIA / SmarTeam, ANSYS, LS-Dyna... Experimental Mechanics Lab. Mechanical workshop (4000 m2): 50 technicians and engineers CNC machining Assembly & metal forming Welding (TIG, MIG, electron beam, laser, vacuum brazing) Technical Subcontracting Service (MME-FS) Material science consultancy: metallurgical analyses, microscopy, mechanical tests NDT: US, radiography, tomography Metrology: 350 m2 lab. equipped with CMM. 04/04/2017 A. Dallocchio

Subcontracting Service: Invoiced Jobs 2011 2012 2013 2014 2015 2016 Subcontracting MME-FS (MCHF) 5.9 7.0 7.9 9.0 8.2 ~10 ~2000 contracts/year in close collaboration with IPT Dept. Quota represents ~ 40% of overall production for mechanical components @ CERN Subcontracting: ~ 35% of semi-finished parts ~ 65% of finished / turnkey components 04/04/2017 A. Dallocchio

MME Subcontracting Service: Core & recent activities Europe wide 04/04/2017 A. Dallocchio

Magnets L = 7m MQXF Magnet Superconducting ELENA – Series production of electrostatic quadrupoles (x60). Synergy between EN-MME Workshop and NO-RS suppliers. Prototypes & small series of different magnets High precision CNC of small to large equipment Stamping, wire cut of laminations Cryostats 04/04/2017 A. Dallocchio

SC Magnets: Tools MQXF Large Precise Tools for Magnet assembly Rotating Table or SC magnets assembly FRESCA: Magnet impregnation tool. (BE Supplier) 04/04/2017 A. Dallocchio

Superconducting RF Cavities Forming of Niobium Sheets Precision and surface quality of utmost importance for cavity performance 500mm SPL Cavity ..Spinning.. CRAB Cavity ..Punching, extrusion, deep drawing by MME.. Precise Tools 04/04/2017 A. Dallocchio

Warm RF Cavities Precise Machining of Large Equipment First DTL girder First full scale DTL tank segment (~2 m) 04/04/2017 A. Dallocchio

Heterogeneous RF Equipment CRAB Cavity RF Feedthrough: Critical EB welding and Ceramic brazing in reduced volume RF Antennas: Niobium machining and EB welding Ambient to Cryogenic RF Power Lines 04/04/2017 A. Dallocchio

Ultra precise machining The design involves coupled RF cavities to transfer energy from a high-current, low-energy drive beam to a low-current, high-energy beam to be used in collisions. RF out RF in Ultra Precise machining of RF cells for R&D on future Medical Accelerators 04/04/2017 A. Dallocchio

Vacuum Chambers Precise Shaping of Inconel & SS alloys into chambers of different sizes UHV Compliant Manufacturing ~ 2 mt. PSB Ring ~ 0.5 mt. PSB Injection Hippodrome Edge welded bellows 04/04/2017 A. Dallocchio

Crab Cavity Cryo Vessel Vacuum Chambers Shaping / Extrusion / Welding of UHV Stainless steel Chambers & Vessels Crab Cavity Cryo Vessel L = 04/04/2017 A. Dallocchio

New HiRadMat Experiment for future HL-LHC Collimators 04/04/2017 A. Dallocchio

Beam Lines & Positioning Systems Alignment for small particle detector 04/04/2017 A. Dallocchio

Transport & Support Systems Linac 4 jacks RFQ detailed assembly including ridge-line support and cooling distribution Lifting tool for magnets 04/04/2017 A. Dallocchio

MME Subcontracting Service: recent activities Europe wide Linac4 H- Source Insulator Brazing by EN-MME HIE-ISOLDE Thermal Shield. Produced by EN-MME (Design TE-MSC). Ni-Plating in collaboration with FR firm 04/04/2017 A. Dallocchio

MME Subcontracting Service: recent activities Europe wide Large trolley for HIE-ISOLDE RF cavities installation into the clean room Large structure for clean room (HIE-ISOLDE project) High precision copper machining 04/04/2017 A. Dallocchio

MME Subcontracting Service: recent activities Europe wide RF Pulse Compressor on Cu OFE 3D forged 04/04/2017 A. Dallocchio

MME Subcontracting Service: recent activities Europe wide HIE- Isolde Cavities: ..Machining from Monoblock Copper D320 x L900 Tolerances in the tenth of mm.. 04/04/2017 A. Dallocchio

MME Subcontracting Service: recent activities Europe wide Beam Instrument High-precision machining of 316LN LINAC4 Beam Instrumentation tank 04/04/2017 A. Dallocchio

MME Subcontracting Service: recent activities Europe wide Cryo Magnetic Shield Cryophy, precise shaping and thermal treatment Warm Magnetic Shield MuMetal, 2m wide 04/04/2017 A. Dallocchio

MQXFB MAGNETS Components of coils End spacers Poles ..5 axes CNC machining, EDM.. Poles ..Titanium.. 04/04/2017 A. Dallocchio

SPS TIDVG4 Assembly Copper blocks ..Large CNC milling machining.. Assembling ..welding and tests in house.. Short time to produce this dump… 04/04/2017 A. Dallocchio

Current leads 30kA Cluster D Multi technologies, in house and outsourcing manufacturing ..Assembling phases.. Current leads 30kA Cluster D 04/04/2017 A. Dallocchio

Vacuum brazing, EB welding, Titanium coating, ceramics FINEMET … explanation…blablabla Cavity Vacuum brazing, EB welding, Titanium coating, ceramics Structure Cooling copper discs Manifolds 04/04/2017 A. Dallocchio

Thank you for your attention