Status of the SWAP instrument

Slides:



Advertisements
Similar presentations
Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
Advertisements

1 GAIA System Level Technical Reassessment Study Final Presentation ESTEC, April 23rd 2002 Part 1b Development & AIV.
PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 1 IHDR ASTEQ-GmbH Germany Peter Dinges, Michael Harr, Heribert Krüger, Hilmar Richter, Bernd Zimmermann.
Test Cryostat, OGSE and MGSE PACS IHDR: MPE 12/13 Nov 2003 AIV1 PACS Test Cryostat, OGSE and MGSE Gerd Jakob MPE.
Flight Readiness Review New Mexico Space Grant Consortium University/Institution Team Members Date.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
J.P. Halain – Centre Spatial de Liège
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
Integration and Test 14 October 2008 Martin Nordby.
Integration and Alignment of Optical Subsystem Roy W. Esplin Dave McLain.
A Finmeccanica Company 04/2000/1 EUSO Development Philosophy EUSO General Meeting Max Planck Institute for Physics Munich, November the 20th 2003.
1 Mirror subsystem: telescope structure Functions: Functions: Support mirrors subsystem to S/C Support mirrors subsystem to S/C Accommodate cryostat Accommodate.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
ASPERA-3 Sep. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 9_25/ Page 1 Monthly Status Report Report due 9/25/00 Schedule statused.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
PACS IBDR 27/28 Feb 2002 PACS Photometer1 PACS PHOTOMETER J.L Auguères L.Rodriguez CEA/DSM/DAPNIA Service d’Astrophysique.
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
PACS IHDR 12/13 Nov 2003 PACS FPU FPU Structure, Baffle and Straylight R. Graue, D. Kampf Kayser-Threde.
PACS IBDR 27/28 Feb 2002 IIDR Close-out1 Close-out of IIDR Recommendations A. Poglitsch.
PACS IBDR, Garching 27/28 Feb 2002 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause J. Katzer (ZEISS) Max-Planck-Institut für Astronomie, Heidelberg.
Herschel Space ObservatoryPACS Science Verification ReviewMPE 22/23 June 2006 GJ / MPE 1 PACS Test Facility Capabilities – Cryogenics and OGSE Gerd Jakob.
PACS IHDR 12/13 Nov 2003 IBDR Close-out1 Close-out of IBDR Recommendations A. Poglitsch.
Science - Coronal heating - Coronal structure / dynamics - Elementary processes in Magnetic Reconnection Mission instruments - Optical Telescope / Vector.
PACS SVR 22/23 June 2006 PACS FPU Subunits1 FM FPU Subunits A. Poglitsch.
PACS IQR ESTEC 13 January 2005 Mech Qual Status 1 PACS IQR Mechanical Qualification Status and Plans for PFM Reinhard Katterloher R. Graue, D. Kampf, R.
Plato meeting MSSL Wed+Thur 15+16/Oct/08 UK interests/activities Alan Smith and Dave Walton UCL/MSSL.
ASTEROSEISMOLOGY and SEARCH for EXOPLANETS Vienna - September 18 th 2001 Optical performance characterization Point Spread Function (PSF) : Telescope +
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Jerry Kim, SSL Mechanical.
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
GERB 4 Instrument Status GIST 25 23rd October 2006 Presenter: N Morris.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
AMS-RICH Detector. J. Berdugo – CIEMAT (Madrid, Spain) 1 AMS-02 Phase II Flight Safety Review AMS Ring Imaging CHerenkov PURPOSE: 1.Precise measurement.
PACS IHDR MPE 12/13 November 2003 System Engineering 1 PACS IHDR Model Philosophy, Budgets, Interfaces and IID-B Reinhard Katterloher.
041103_SECCHI Status.1 SECCHI Status R.A. Howard STEREO SWG 2-5 May 2005 Hamburg Planetarium.
GIST 24 Meeting GERB Hardware Status 14 th December 2005 Eric Sawyer.
Dept. Physics & Astronomy Space Research Group Nick Nelms Space Research Group Dept. Physics & Astronomy University of Leicester UK GERB International.
NIRSpec IFU Eric Prieto Final Presentation Definition Phase May, 11th – ESTEC.
1 System Architecture Mark Herring (Stephen Merkowitz Presenting)
Solar Probe Plus Fluxgate Magnetometer QSR – Oct SPF MAG Quarterly Report – Oct 2014 The MAG EM1 (EQM) (board and frame at right) was successfully.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
Page 1HMI/AIA Science Meeting – February 13, 2006 HMI Instrument Status HM/AIA Science Meeting February 13, 2006 Barbara Fischer HMI Deputy Program Manager.
IFS prototype – PM3 LAM, 13/06/2003 Prototype testing at CRAL Tests at room temperature in the visible.
1DSM/DAPNIA/SAp – J. MartignacPACS - IHDR - MPE – Nov. 12 – 13, 2003 PACS – IHDR PhFPU Design J. Martignac CEA/DSM/DAPNIA Service d’Astrophysique.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
PACS SVR22/23 June 2006 Warm Electronics1 Warm Electronics: Components/Subsystems Test Results B. Voss PACS SVR.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
IFU Management Meeting LAM – 15/10/04. Introduction (olf)
BSMIan Pain, UK ATC SPIRE Instrument Intermediate Design Review April 23, RAL 1 Beam Steering Mirror Sub-System IIDR Overview Ian Pain UK ATC Colin.
Rose Navarro HMI Lead Thermal Engineer
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Wide-Field Imager for Solar PRobe Plus (WISPR)
SPF MAG Quarterly Report – Feb 2015
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
30-Nov-2006 Jean-Marc Defise - CSL
THEMIS INSTRUMENT SUITE
The European Contribution to eXTP
ISAS Solar Physics Yohkoh (1991- ) Hionotori ( )
GLAST Large Area Telescope:
GLAST Large Area Telescope
Solar Orbiter EUI Extreme UV Imager
CRaTER Pre-Environmental Review (I-PER) Spacecraft Interfaces Bob Goeke September 10-11, 2007.
Integration, Test, and Verification
GLAST Large Area Telescope
Introduction and Overview
SPICA / FPI Mechanical /Optical Issues
Instrument Overview Larry Springer HMI Program Manager
Command and Data Handling
Presentation transcript:

Status of the SWAP instrument 29-Nov-2006 Jean-Marc Defise - CSL jmdefise@ulg.ac.be SCSL Meeting – ISSI, 29-30 Nov 2006

SCSL Meeting – ISSI, 29-30 Nov 2006 SWAP Status STM tests are completed Tests with BB electronics are completed All FM components are delivered to CSL MCPM FM not ready SWAP FM is currently under assembly, alignment & verifications SCSL Meeting – ISSI, 29-30 Nov 2006

SCSL Meeting – ISSI, 29-30 Nov 2006 SWAP Status FM Structure Invar optical bench + black coating, “isostatic” mounts SCSL Meeting – ISSI, 29-30 Nov 2006

SCSL Meeting – ISSI, 29-30 Nov 2006 SWAP Status FM Structure Invar baffles & housing – internal parts are black (to visible light) SCSL Meeting – ISSI, 29-30 Nov 2006

SCSL Meeting – ISSI, 29-30 Nov 2006 SWAP FM Integration Optics Flight mirrors (FM1 + SM2) have been mounted on the SWAP optical bench Alignment (on-axis) with SFE < l/30 rms (633 nm) on a dummy camera (representative of the flight camera) Offset optical axis ./. mechanical axis is currently under verification  need to assess coalignment with LYRA Alignment (interferometry) is currently under verification SCSL Meeting – ISSI, 29-30 Nov 2006

SCSL Meeting – ISSI, 29-30 Nov 2006 SWAP FM Integration dummy camera used to reflect back the focussing beam from the telescope and the interferometer Optical alignment SCSL Meeting – ISSI, 29-30 Nov 2006

SCSL Meeting – ISSI, 29-30 Nov 2006 SWAP FM Integration Interferometer Alignment tool for M2 SWAP FM optical bench Dummy camera M1 Optical alignment SCSL Meeting – ISSI, 29-30 Nov 2006

SCSL Meeting – ISSI, 29-30 Nov 2006 SWAP FM Integration Optical alignment SCSL Meeting – ISSI, 29-30 Nov 2006

SCSL Meeting – ISSI, 29-30 Nov 2006 SWAP FM Integration Optical alignment SCSL Meeting – ISSI, 29-30 Nov 2006

SCSL Meeting – ISSI, 29-30 Nov 2006 SWAP FM Status Cover mechanism White paint of cover mechanism had to be reprocessed in sept 06 (peeling after TV, process was changed wrt prelim. samples). FM cover mech. was TV cycled with funct. testing. FM cover mech. was vibrated on the FM structure, with SM mirrors + filters, combined tests for mech. acceptance + filter selection. Final coating (white paint) is now OK. FM cover mech is ready for integration. SCSL Meeting – ISSI, 29-30 Nov 2006

SCSL Meeting – ISSI, 29-30 Nov 2006 SWAP FM Status Filters – Current status Air flow study, design of labyrinths & venting outlets  Delta pressure test on real filters  Thermal balance test with Sun simulator (ESTEC)  Theoretical studies (optical artifacts) of grid supports  Vibration tests with STM  Tests with  reinforced grid filters enlarged labyrinths addition of “acoustic baffles” negotiated “notched” vibration spec New tests with polyimide front filter + reinf. grid focal filter  Negotiate safety conditions for S/C AIV to be done SCSL Meeting – ISSI, 29-30 Nov 2006

SCSL Meeting – ISSI, 29-30 Nov 2006 SWAP FM Status Filters – Selected baseline Front filter = polyimid + Al Focal filter = reinforced grid + Al No “flare” diffraction Only grid shadow on the focal plane but with low modulation (filter is not very close to sensor) SCSL Meeting – ISSI, 29-30 Nov 2006

SCSL Meeting – ISSI, 29-30 Nov 2006 SWAP FM Status Proximity Electronics (PE) FM PE (with FM sensor) was received and tested in last June-July. Latch up detection at startup due to a bad resistor Correction implemented at CSL SCSL Meeting – ISSI, 29-30 Nov 2006

SCSL Meeting – ISSI, 29-30 Nov 2006 SWAP FM Status Proximity Electronics (PE) FM PE integrated in focal plane assembly (FPA) in July. FPA = PE with CMOS sensor + housing + cooling/heating system + diodes FM FPA delivered to CSL in Aug 06 SCSL Meeting – ISSI, 29-30 Nov 2006

SCSL Meeting – ISSI, 29-30 Nov 2006 SWAP FM Status Proximity Electronics (PE) Tests of the PE in FPA outlined a problem in the SRAM memory Investigations showed that the board had an intenal short with ground through a mounting hole 1 FPGA + 1 SRAM components had to be replaced + new external wiring to replace the erroneous track First tests indicate that the repaired hardware works SCSL Meeting – ISSI, 29-30 Nov 2006

SCSL Meeting – ISSI, 29-30 Nov 2006 SWAP FM Status Proximity Electronics (PE) Final agreement with ESA to use FM repaired board is pending on a diagnostic on the memory failure (which is not clearly explained now, but also used in several other ESA programs). Analysis is currently performed by the component manufacturer. If needed, the Spare FM PE can still be assembled. But major impact on schedule. SCSL Meeting – ISSI, 29-30 Nov 2006

SCSL Meeting – ISSI, 29-30 Nov 2006 SWAP FM Status Thermal Blanket (MLI) Fit check was performed at CSL in Aug 2006 MLI is used to keep SWAP isolated from platform thermal environment SCSL Meeting – ISSI, 29-30 Nov 2006

SCSL Meeting – ISSI, 29-30 Nov 2006 MCPM Status MCPM provides on-board data processing, storage and packetization cPCI interface with cPCI bus to S/C ADPMS MCPM BB is currently used for tests MCPM FM - cPCI connectors procurement was problematic (type imposed by S/C !) Press-fit cPCI connectors assembled first (unusual process) 2 boards currently under assembly at CRISA SCSL Meeting – ISSI, 29-30 Nov 2006

SCSL Meeting – ISSI, 29-30 Nov 2006 SWAP FM Status Mass & Power Status Spec Measured Mass SWAP FM 10.0 kg 9.755 Kg Power SWAP FM 2.0 W aver 1.4 W idle 2.5 W acqu Mass IIU 1.2 kg 0.715 Kg SCSL Meeting – ISSI, 29-30 Nov 2006

SCSL Meeting – ISSI, 29-30 Nov 2006 SWAP FM – Open Work PE final characterization (on-going) Final assembly of full FM unit with repaired PE after ESA green light Vibrations Thermal tests EMC/EMI with LYRA & IIU (@ ESTEC) EUV Calibration @ PTB SCSL Meeting – ISSI, 29-30 Nov 2006

SWAP Instrument Consortium J. M. Defise J.P. Halain F. Denis T. Thibert L. Rossi E. Mazy P. Rochus U. Schule D. Berghmans J.F. Hochedez B. Nicula G. Lawrence A. Zhukov R. Van der Linden F. Clette V. Slemzin L. Wauters L. Podladchikova SCSL Meeting – ISSI, 29-30 Nov 2006