Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
MICE-SciFi team, 14 October 2003 SciFi: progress report Progress: All stations shipped to FNAL … … assembly in progress Measurements: Effect of radiated.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
Uli Schäfer 1 Production modules Status Plans JEM: Status and plans.
HCAL-J Update (G.B. Franklin, CMU, Mar. 2015) 40 Ton Detector 288 modules Arranged in 4 sub-assemblies 24 Modules (360 cm) 12 Modules (180 cm) 1 Absorbers.
November 24, 2004 Rolf Nahnhauer1 PROJECT : IceCube Digital Optical Module Production at DESY Zeuthen.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
Status of the PSD (Jan. 2009) F.Guber, INR, Moscow.
ECAL Monitoring System Ivan Korolko (ITEP Moscow) PRR, September 2004.
Ondřej Svoboda for the ECAL group HADES collaboration meeting XXV, 19 – 23 November 2012 GSI.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 18, 2004.
1 US Pixel Mechanics Role Global support structureIntermediate support structureLocal support structure Stave SectorDisk Barrel x (9-11) x5 x (22,40,56)
DVCS-2 Assembly & Installation Charles Hyde DVCS Collaboration Meeting 18 December 2009 Clermont-Ferrand.
Electromagnetic Calorimeter for HADES at SIS100: MAMI and CERN test results Lead-glass modules Tests -  beam at MAMI energy resolution -  - /e - beam.
CERN Workshop upgrade Rui De Oliveira KOBE WG6 WG6 9/1/20111Rui De Oliveira.
Tracker Summary Alan Bross MICE CM October 10, 2007.
ECAL LED monitoring system upgrade Pavel Shatalov ITEP, Moscow, Russia Yuri Guz IHEP Protvino, Russia.
M. Gilchriese Sectors, Rings, Frame Assembly and Installation July 18.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 1 EE Design Status D Cockerill CERN 19 July 2006.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)
1 HCAL production, QC and preparation for installation Overview of the status report Rustem DZHELYADIN (IHEP, Protvino)  The general status.
EDR of the TOTEM Roman Pots - CERN - 24 November 2005 Beniamino Di Girolamo - CERN PH/ATT ATLAS Roman Pots at IR1 Beniamino Di Girolamo CERN.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
CMS 1.Goal of the experiment CMS is a general purpose apparatus for LHC designed to study the physics of p-p collisions at the center-of- mass energy of.
Reported by G.Feofilov at the NA61 meeting , CERN, EVO.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
Electromagnetic Calorimeter for HADES at SIS100 Pavel Tlustý, NPI Řež Motivation Plans Current status Tests Outlook HADES Collaboration Meeting, Sesimbra,
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
CDMS II Shielding To Installation To Construction From Design.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
FORWARD ATLAS {major contributions from Per Grafstrom (CERN), Michael Rijssenbeek (Stonybrook), Brian Cox (Manchester} Andrew Brandt Luminosity measurement.
PANDA Forward Spectrometer Calorimeter (Shashlyk) Status Dmitry Morozov, IHEP (Protvino) PANDA LV Collaboration Meeting Nov 30 – Dec Vienna, Austria.
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
ECAL LED monitoring system upgrade status 04/09/20131.
An update on ECAL simulations
Detector building Notes of our discussion
TOTEM Electronics Status
Upgrade activities at Clermont-Ferrand
News about the WA104 Programme
Status of works on the Collaboration Contract between IHEP and FAIR
BINP, Sergey Pivovarov, Panda magnet meeting at GSl, June 07, 2016
Projekt FAIR-CZ-OP In-kind dodávky pro detektor ECAL (HADES)
The SABRE Crystals Frank Calaprice.
[Project Name] [Presenter Name]
Far Detector Activities Late 2017 – Early 2018
F.Guber, A.Ivashkin INR, Moscow
[Project Name] [Presenter Name]
[Project Name] [Presenter Name]
Project planning and status (February 2018)
[Project Name] [Presenter Name]
UK CMS Oversight Committee Mtg
T2Kロシアグループに向けたMPPC(SiPM)の性能評価
Project planning and status (May 2018)
PANDA Forward Spectrometer Calorimeter (Shashlyk) status and plans
Presentation transcript:

HADES collaboration meeting XXX, Lisbon, 7-10 October, 2015, ECAL modules assembly and monitoring system ...update since last meeting Ondřej Svoboda HADES collaboration meeting XXX, Lisbon, 7-10 October, 2015,

ECAL plan Objective: Having a running (part of) ECAL in HADES cave in the end of 2017 for SIS18 experiments R&D: Technical issues solved, TDR approved, development (almost) closed To be solved: - final PMT type : ~ 270 PMTs missing (from total 978+30) usage of 1.5” and 3”, or only 3”?? - funding: from FAIR in progress, FAIR-CZ in progress, other sources?? Work schedule: - adaption of module mechanics on the way (see further slides), but partially depend on the PMT type - support frame – see separate talk of Edward Lisowski - assembly and installation of modules – from 2016, depending on available space and delivery of the support frame

Dismantling of ECAL modules at GSI - done in GSI by technicians from INR Moscow (disassembling and cutting long cans) - 700 modules ready (plus ~200 with shorter length) - 260 modules shipped from CERN in spring 2015, will be processed in Nov. - Dez. 2015   End of 2015 – preparation finished, 100% of needed lead glass crystals and brass cans available.

Adaption of ECAL modules at Tuř (CZ) 550 modules moved from GSI to CPM company (Tuř, CZ) in 5/2015 (small company focused on precise mechanics and optics) 300+ modules ready, 100% by the end of October, than shipment back to GSI! Task on modules: cleaning, polishing lead glass where needed wrapping in Tyvek adapting mechanics to correct length preparation for optical fiber manufacture of new mechanics for 3“ PMT

Purchase of components in 2015 (by Řež) Optical Fibers 25 cm long to be build in modules 330+180 pieces (~6000€) Tyvek DuPont TYVEK 1060B 225 m2 (enough for all modules) HV boxes 10+25 pieces (enough for ECAL) adapted at Řež PE spacer 200+400 pieces adapted at Řež and Optical monitoring system, see next slide..

Optical monitoring system First prototype Second prototype 12/2012, 10 fibers old TOF fibers (rigid) blue LED 2012, 10 fibers fibers dedicated for blue light blue LED/laser LED One sector full system designed and manufactured at SQS vláknová optika, a.s., Nová Paka (CZ) blue laser LED, 80mW output power microlens array and optics 196 fibers for blue light ready in November 2015

Plans for near future November – December 2015 dismantling of the remaining 260 pieces from CERN by Russian technician at GSI December 2015 stay of technicians from Optical laboratories of Charles University in GSI, preparation of room for assembly, test of assembly during 2016 - tests of new optical monitoring system - adaption of HV boxes, PE spacers,... - mechanics for all modules - final assembly of modules for 1-2 sectors - installing modules in HADES cave (when support structure is ready)

Open questions – missing funding Funding of some components is not clear (= has to be clarified now or in near future)!! 270 PMT – mixture of 1.5“ and 3“, or 3“ only? HV system for 4 sectors monitoring system for 5 sectors Continuing in module assembly now might lead to spoil of money and work when changing the plans in future...