Agenda Reorganisation MARS Offices Staff, fellows and students

Slides:



Advertisements
Similar presentations
February 2009 Summary of Chamonix 09 Steve Myers.
Advertisements

Dr. José Miguel JIMENEZ LS2 Coordinator LHC Performance Workshop (Chamonix 2014) Session 8 - Long Shutdown 2 Strategy and Preparation Chair: José Miguel.
CERN Ivan Romera MPE-Technical meeting Status on CERN-ITER collaboration for Machine Protection Acknowledgments: J.Burdalo, R.Schmidt, S.Wagner, M.Zaera.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Michał Bochenek Work Package 3: On-Detector Power.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 Copper Stabilizer Continuity Measurement Project Copper Stabilizer Continuity Measurement Status & Plans – May 2011 MPE-TM – 12 May 2011 M. Koratzinos,
Frequency Transfer Function Measurements during LS1 Emmanuele Ravaioli Thanks to Arjan Verweij, Zinur Charifoulline, Andrea Musso MPE-TM
R.Schmidt TE-MPE-PE: members of the section Michael Jonker Mike Koratzinos Rüdiger Schmidt Daniel Wollmann – from 1 st November 2011 Arjan Verweij Carlos.
TE- MPE PE members 1.Bernhard Auchmann; 2.Zinur Charifoulline; 3.Michael Jonker; 4.Arjan Verweij; 5.Daniel Wollmann; 6.Rüdiger Schmidt; 7.Vera Chetvertkova.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Upgrade, IST and Powering tests of the Upgrade, IST and Powering tests of the 600A Energy Extraction Systems.
Fabio Formenti - Feb. 25th, LHC enhanced Quench Protection System project Review committee meeting February 24 th –26 th 2009.
CSCM Project Status and Prospects Andrzej Siemko on behalf of the CSCM project core team: Mike Koratzinos, Jens Steckert, Hugues Thiessen and Arjan Verweij.
LHC Enhanced Quench Protection System Review 24 – 26 February 2009.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
TE-MPE Group Meeting 11 December /12/15 TE-MPE Annual Meeting1.
TE-MPE-EP New DQLPU type A Production of 1300 new protection units TE-MPE-EP, VF, 23-Nov-2012.
TE/MPE activities currently planed for YETS Reiner Denz, Knud Dalherup-Petersen, Markus Zerlauth & Bruno Puccio YETS coordination meeting.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
TE-MPE-CP, RD, LHC Performance Workshop - Chamonix Feb R. Denz TE-MPE-CP on behalf of the QPS team QPS Upgrade and Re-commissioning.
Work Organisation for Splice Consolidation Francesco Bertinelli 20 minutes presentation, 10 minutes discussion: 12 slides First LHC Splice Review, CERN,
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
Education Thesis: Layout and design of a high accuracy magnetic field measurement system for superconducting undulators. Thesis: Phase error reduction.
New projects, priorities and main objectives for /12/15 TE-MPE Annual Meeting1.
LHC Machine Status Report Mike Lamont for the LHC team Acknowledgements: Mirko Pojer, Matteo Solfaroli, Katy Foraz et al.
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Long.
MPE Workshop for LS1 Summary of Global Activities Thanks to Speakers Arjan Verweij Hugues Thiesen Zinur Charifoulline Kajetan Fuchsberger.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
An invitation to an open discussion We are team reviewing its performance globally We want to help each other to reach the objectives We know the other.
Dr. José Miguel JIMENEZ LS2 Project Leader, CERN 1 LS2 Days 30 th September2015.
Summary Session 5 Chamonix 2011, 24. – Session 5: “High Intensity: Present and Future” R. Assmann & S. Redaelli Thanks to Frank Z. for his notes…
LEADE Meeting, February 6 th 2006 Highlights from the Chamonix Workshop Divonne, January 2006 D. Macina TS/LEA.
1 st of April st LS2C LS2 Committee Mandate and Organization 2 Chairman:Jose Miguel JIMENEZ Deputy:Jean-Philippe.
 Automation Strategies for LHC System Tests and Re-Commissioning after LS1 Kajetan Fuchsberger TE-MPE LS1 Workshop On behalf of the TE-MPE-MS Software.
 TE-MPE-PE Clean code workshop – R.Heil, M.Koza, K.Krol Introduction to the MPE software process Raphaela Heil TE-MPE-PE Clean code workshop - 9 th July.
MPE LS1 workshop Summary Session 4 – Quench Detection R. Denz, D. E. Rasmussen.
Main MPE Activities during YETS/EYETS/LS2 and the Provision of Resources Andrzej Siemko Andrzej Siemko TE-MPE1.
Registered participants participants from outside Cern.
Modelling and testing of circuit protection of new superconducting magnets for the HL-LHC project
Introduction, Andrzej Siemko
The Steering Board for MPE projects and its activities
PH-DT Seasonal Group Meeting 21/1/14
LHC Enhanced Quench Protection System Review
LHC schedule.
June 22, 2017 Burkhard Schmidt for the DT coordination team
Document Plan & Milestones WP7
Looking back on 2014 and Perspectives for the MPE Group in 2015
19th Hadron Synchrotron Incoherent effects section meeting
10th Hadron Synchrotron Incoherent effects section meeting
M.Jonker CTC MPO-WG status
J. Uythoven for the MPE-MI & MS Teams
MPE main activities planned for LS2
Machine Availability and Reliability Panel (MARP)
and Electrical Integrity Group First Plenary Group Meeting 22/01/2009
10/month is the present production rate 2 FTE + sporadic contributions
Re-Commissioning (IST) of Electrical Systems: QPS, EE & PIC
Remote setting of LHC BLM thresholds?
Andrzej Siemko (CERN) and Marco Zanetti (MIT)
List of IPAC19 papers with reference to HL-LHC
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
Review of hardware commissioning
Other arguments to train two sectors to 7 TeV
Radiation Working Group RADWG
Presentation transcript:

Agenda Reorganisation MARS Offices Staff, fellows and students Section meeting 13/01/2012 1

TE- MPE group new organisation A. SIEMKO (Group Leader) R. SCHMIDT (Deputy Group Leader) B. PUCCIO (Tech. Coordinator & GL support) R. DENZ M. ZERLAUTH K. DAHLERUP-PETERSEN R. SCHMIDT F. FORMENTI Electronics for Protection TE-MPE-EP   QD Electronics WorldFIP/NanoFIP & R2E BIS SMP DAQ systems HW reliability studies ITER prototype support CSCM support HW testers SM18 QD upgrade & support Magnet Powering Interlocks & Software TE-MPE-MS   PIC / WIC ITER prototype (support by EP & PE) FMCM Post-Mortem ELQA support during HWC MPE SW coordination Automated analysis tools Machine SW test tools SM18 interlocks upgrade & support Electrical Engineering TE-MPE-EE   EE 600A EE 13kA ELQA Protection diodes Circuit drawings QH PS systems Diagn. & Measurements Circuits' auxiliary equipment SM18 EE upgrade & support Performance Evaluation  TE-MPE-PE Performance evaluation Circuit simulations MP3 rMPP HiRad Mat tests CLIC MPS CSCM ITER support HWC Electronic Modules  TE-MPE-EM Design office PCB assembly PCB development RD51   Components ordering centre for MPE

TE- MPE PE members Michael Jonker; Arjan Verweij; Daniel Wollmann; Zinur Charifoulline - joined PE from QPS section; Rüdiger Schmidt; Carlos Omar Maidana – Fellow in 2nd year on CLIC; Sigrid Wagner – Fellow in the 2nd year; Emmanuele Ravaioli - Fellow in the 3rd year; Juan Blanco Sancho – PhD student in the 3rd year; Daniel Molnar – technical student; Evangelia Antonopoulou - technical student joined PE from ELQA section; Maria Hempel - technical student arrived this month January; Andrea Appolonio - technical Student in BE-OP to join our team as PhD student; M Koratzinos; Scott Rowan left; Kajetan Fuchsberger and Michael Galetzka moved to Markus section;

Diverse MARS Need to find dates for Arjan, Michael and Zinur Need to find a date for the induction interview for Daniel Offices: the section will move to the third floor… all of us Staff, fellows and students Section meeting 13/01/2012 4

Some info on LHC LHC operation will start with powering tests in February LHC beam operation is schedule to start 7 March (possibly a few days later) LHC operation until end of November Then the powering system to be tested for operation at 6.5 – 7 TeV Long shutdown I (LS1) for LHC will start then CSCM (thermal amplifier) tests: very likely to be done for one sector at the start of LS1 Beam operation will resume after summer in 2014 Chamonix LHC workshop 6-10 February 2011 Energy likely to be 4 TeV in 2012 Expected integrated luminosity in 2012: 16 fb-1 Section meeting 13/01/2012 5

Main activities and challenges Restart of LHC magnet powering system for operation at 4 TeV Ensure safe LHC beam operation during 2012 Prepare LHC powering tests at end of 2012 – in view of later operation at 6.5 – 7 TeV, including CSCM (thermal amplifier) Modelling and documentation of the LHC magnet powering circuits Prepare shutdown activities Preparing LHC for operation at higher energy Understanding beam losses, in particular UFOs Understanding quench limits (workshop to be organised in June or September) CLIC: achieve common understanding of strategy for machine protection Workshop to be organised in June HiRadMat: perform beam tunnelling experiment RAMS studies for LHC, ITER and other accelerators (Med Austron) Failure catalogue for LHC, possibly extension to other accelerators Section meeting 13/01/2012 6

Activities Involvement in LHC machine operation and protection related to beam – MPP and MPPr (Daniel W., Juan, Maria) understanding quenches in presence of beam (Arjan, Daniel W.) Powering system (Arjan, Daniel W., Emmanuele, Zinur) LHC maximum energy and diode bypass (thermal amplifier): Quench propagation, CSCM (Arjan, Daniel W., Zinur) Modelling of LHC circuits and comparison with experimental data (Emmanuele, Arjan, Evangelia) Preparation for splice consolidation during shutdown (Arjan, Daniel M.) LHC hazard catalogue and dependability studies (Sigrid, Andrea) Collaboration with ITER for machine protection (Sigrid) RAMS studies for the LHC and ITER protection systems HiRadMat (Juan) calculations and preparing an experiment for shock beam impact on matter commissioning the HiRadMat beam line CLIC machine protection (Michael and Carlos) Section meeting 13/01/2012 7

Other activities Michael Jonker, Rüdiger Schmidt, Juan Blanco Outreach and community service (presenting CERN to the public, teachers programme) Rüdiger Schmidt Lecturing, DESY advisory committee, IPAC organising committee, HB 2012 session chair, German committee for accelerator physics Michael Jonker Deputy RSO Work on ALARA review working group RSSO discussions (Radiation Safety Support Officer) Arjan Verweij TSC (Technical Student Committee), AFC (Associate + Fellows Committee) deputy for TE SIPB scientific info policy board for TE Section meeting 13/01/2012 8

Outlook New post (replacement of Nuria) planned for Spring Electrical engineer or applied physicist, mainly on magnet powering system and modelling PhD student (Florian Burkart) is likely to join us in late spring Topics to be defined, but will be related to beam induced damage and quenches Possibly another PhD student will join to work on issues related to the powering system During LS1, are there any tasks in our team that require help from EICs? Section meeting 13/01/2012 9

Questions and TE-TM meetings How to go about circuit screening? Presentation on ITER Presentation on Circuit Screening Circuit modelling Documentation and data bases Section meeting 13/01/2012 10