THE ART OF THE POSSIBLE: IRP CONSIDERING STATE-WIDE AND REGIONAL PERSPECTIVES IN INTEGRATED RESOURCE PLANNING Horizons Energy Indiana Contemporary Issues.

Slides:



Advertisements
Similar presentations
Evaluation Independent Monitoring Presented at: LPSC Staffs Technical Conference and ESIs Bidders Conference for the Fall 2006 Limited-Term RFP September.
Advertisements

MISO Day 2: A Transmission Users (Marketers) Perspective Leon White August 8, 2007.
Presentation to State Water Resources Control Board November 14, 2012 By Dave Modisette Executive Director California Municipal Utilities Association.
Transparent, Repeatable, Defendable, and Published Generation, Transmission & Nat Gas Network Co-Optimizations
CVP Cost Allocation Public Workshop – January 18, 2013 “PLEXOS Methodology and Assumptions”
05/14/2014 Flexibility Methods Workgroup. 2 © 2014 Electric Power Research Institute, Inc. All rights reserved. Overview/Agenda Discussion of Literature.
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
P.Labra – EWEA March 2012 ENTSO-E’s & TYNDP’s vision on adapting European Transmission Grid to large amounts of wind power.
1 March 2-3, 2015, Bonn Expert workshop Addressing Variable Renewables In Long‐Term Energy Planning (AVRIL) Renewables Energy Integration In Long‐Term.
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
2001 South First Street Champaign, Illinois (217) Davis Power Consultants Strategic Location of Renewable Generation Based on Grid Reliability.
Pricing and revenue optimization. Course outline Basic price optimization, examples Looks at pricing the product depending on the cost and demand structure.
Economic Analyses of FPL’s New Nuclear Projects: An Overview Dr. Steven Sim Senior Manager, Resource Assessment & Planning Florida Power & Light Company.
New Zealand & Australian Wholesale Electricity Markets A Comparative Review Dr Ralph Craven Transpower NZ Ltd.
Decision-Making. learning objectives the scope of decision-making the seven steps of the decision-making process relevant costs examples of practical.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
Least Cost System Operation: Economic Dispatch 1
EMPIRE- modelling the future European power system under different climate policies Asgeir Tomasgard, Christian Skar, Gerard Doorman, Bjørn H. Bakken,
Review of eStorage’s first year results WP3 Benefits of Storage and Regulatory Framework & Market Design 30 October 2013 Wim van der Veen - DNV KEMA.
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
©2003 PJM Factors Contributing to Wholesale Electricity Prices Howard J. Haas Market Monitoring Unit November 30, 2006.
NASUCA Meeting Integration of Intermittent Renewable Resources Panel Michael McMullen MISO June 10, 2013.
Optimization for Operation of Power Systems with Performance Guarantee
THE PJM INTERCONNECTION STATE OF THE MARKET REPORT 2001 Joseph E. Bowring Manager PJM Market Monitoring Unit Federal Energy Regulatory Commission June.
Role and Usefulness of Models Role of Models Models can be used as a tool. Models average past behavior. Models are consistent and systematic framework.
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
Long-Term Electricity Report 1 Susan Gray September 27, 2010.
Preliminary Results with the Regional Portfolio Model Michael Schilmoeller for the Northwest Power and Conservation Council Generation Resource Advisory.
SHRP2 C10A Final Conclusions & Insights TRB Planning Applications Conference May 5, 2013 Columbus, OH Stephen Lawe, Joe Castiglione & John Gliebe Resource.
Ramping and Demand Shifting: A Case Study Tim Mount Dyson School of Applied Economics and Management Cornell University Demand Response.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
PJM©2013www.pjm.com Demand Side Working Group Loads in SCED Angelo Marcino Real-Time Market Operations – PJM April 14, 2014.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
Arben Asllani University of Tennessee at Chattanooga Business Analytics with Management Science Models and Methods Chapter 2 Introduction to Linear Programming.
Puerto Rico Electric Power
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
Monterey Plaza Hotel October 8-10, 2007
Analysis of Demand Response Modeling in GridView Andy Satchwell and Sarah Smith Modeling Work Group December 21, 2015 The work described in this presentation.
Summary of Astrapé Reserve Margin Impact Analysis for the PUCT Pete Warnken WMS February 4, 2015.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
Future Expectations of TEPPC: Products, Users, and Values Maury Galbraith Presentation to TEPPC Review Task Force January 11,
Long Term Study Transmission Results May 21 st, 2013.
January 14, 2016 PacifiCorp-CAISO-NVE EIM Initiative Overview.
SERC Reliability Corporation 1 SERC RELIABILITY CORPORATION MID-AMERICA RELIABILITY CONFERENCE June 21, 2006 COLUMBUS, OHIO.
Regional System Operator Issues Analysis Ron Lehr Western Clean Energy Advocates January 7, 2016.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
Multiscale energy models for designing energy systems with electric vehicles André Pina 16/06/2010.
Study Plan Development & Approach May 5, 2010 Conference Call & Webinar “To ensure efficient, effective, coordinated use & expansion of the members’
Pan-Canadian Wind Integration Study (PCWIS) Prepared by: GE Energy Consulting, Vaisala , EnerNex, Electranix, Knight Piésold Olga Kucherenko.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Contents Introduction Focus area Wind scenarios
Variable Energy Resource Capacity Contributions Consistent With Reserve Margin and Reliability Noha Abdel-Karim, Eugene Preston,
Wind Management at MISO
Analysis of the Effects of a Flexible Ramping Ancillary Service Product on Power System Operations Ibrahim Krad Eduardo Ibanez Erik Ela.
GENESYS Redevelopment Strawman Proposal
Evaluating flexibility and adequacy in future EU power systems: model coupling and long-term forecasting Sylvain Quoilin, Wouter Nijs and Andreas Zucker.
Zonal Electricity Supply Curve Estimation with Fuzzy Fuel Switching Thresholds North American power grid is “the largest and most complex machine in the.
CSP Grid Value of Energy Storage and LCOE Implications 26 August 2013
Additional clarifications on economic and adequacy running hours
Basin Electric SPP Market Update
Short-term uncertainty in investment models
International experience in economic statistics programmes
New England Resource Adequacy
RE Grid Integration Study with India
Locational ICAP in New England
Long Term Grid Assessment – Preparing for 2018 Studies
Jim Mcintosh Director, Executive Operations Advisor California ISO
Ciara O’Dwyer Damian Flynn ESRI/UCD conference 17/09/2019
Presentation transcript:

THE ART OF THE POSSIBLE: IRP CONSIDERING STATE-WIDE AND REGIONAL PERSPECTIVES IN INTEGRATED RESOURCE PLANNING Horizons Energy Indiana Contemporary Issues Conference April 25, 2017

IRP’S HAVE BECOME MORE COMPLEX Modeling: Integration of alternative resources Strategic retirements/repower Greater emphasis on intermittent resources Process: role of stakeholder Page 2

IRP (MODELING) IS THE “ART OF THE POSSIBLE” The size and scope of the tools have finite limits: memory and run-time The art Incorporate the relevant aspects of the analysis Have sufficient simulation detail to capture costs/benefits of decisions Design a solid framework for studying future decisions and uncertainties Knowing: What is contributing to time/size of the problem What level of detail is required to perform the study Killers are number of constraints: time intervals (years, hours/year), number of resources number of integer variables (unit commitment, ramp and build/retire) heavily constrained system Page 3

POWER MODELS, MACHINES, METHODS HAVE EVOLVED Big memory, 64 bit processors, parallel processing Tools: MIP/LP, third party solvers One tool/one database/many applications Example of 16 Core 64 GB Machine: Permits Evaluation of Larger Problems Page 4

TESTING THE ART OF THE POSSIBLE State-wide resource plan? Database 18 k MW peak demand 22 k MW (86 commitment and dispatchable resources) 11 expansion technologies 8 retirement options Example capability: 20 years Typical week per month Integer optimize resource expansion Full commitment and dispatch Co-optimization Energy Ancillary Services Capacity Expansion Strategic Retirement Page 5

RESULTS Over 14 million constraints 16 hours to solve A higher level of operation detail Co-optimized energy, A/S, capacity Page 6

HOURLY RESOLUTION: DISPATCH TO ENERGY AND A/S Page 7

CHRONOLOGICAL UNIT COMMITMENT Page 8

RESOURCE EXPANSION/RETIREMENT Page 9

RECOMMENDATIONS DSM Integration: “Supply-curves” for DSM Linear constraint Chronological constraints LMP differentials from zonal price Page 10

REGIONAL PERSPECTIVE Reliability – congestion (stability, transferability) Economics – resource mix to minimize total system cost Resource adequacy – LOLE, LOLP Page 11

STATE PERSPECTIVE Policy Issues: Fuel, Emissions, Technology Mix, Economy Economic opportunities? Consistency of assumptions Example Issues: Intermittent resources Regulation services Page 12

Contact Information Greg Turk Executive Consultant Columbus OH Office Doug Buresh Executive Consultant Indianapolis IN Office Page 13