SESAME TL2 and SR Diagnostics

Slides:



Advertisements
Similar presentations
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
Advertisements

Microtron,TL1 and Booster Diagnostics Status Hussein AL-MOHAMMAD RF & DI Group SESAME 12 th TAC.
James Welch October 30, FEL Commissioning Plans J. Welch, et. al. FEL Commissioning Plans J. Welch, et. al. Accelerator.
Front-end amplifiers for the beam phase loops in the CERN PS Alessandro Meoli (CERN BE/RF/FB) Supervised by Heiko Damerau 21 April CERN.
Matching and Synchrotron Light Diagnostics F.Roncarolo, E.Bravin, S.Burger, A.Goldblatt, G.Trad.
ILC Controls & Instrumentation R&D Activities at Fermilab G. Tassotto, M. Votava, M. Wendt Fermi National Accelerator Laboratory, Batavia, IL 60510, U.S.A.
Advanced Optics Lab at San Jose State University Ramen Bahuguna Department of Physics.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Beam Instrumentation for Orbit Stability I. Pinayev.
BEPCII Transverse Feedback System Yue Junhui IHEP , Beijing Sep 17 th, 08IMAC.
Installation and checkout of QBPM system Hardware to be installed –Install hardware in racks –Install CPU /SIS digitizers/VMIC 3122 analog digitizers/Digital.
Digital Signal Processing and Generation for a DC Current Transformer for Particle Accelerators Silvia Zorzetti.
SPIE, PA-IVKrzysztof Czuba1 Improved fiber-optic link for the phase reference distribution system for the TESLA technology based projects Krzysztof.
Xiao-Yan Zhao Beam Instrumentation Group Accelerator Center, IHEP BEPCII Background Issues: Beam Loss Measurement.
05/05/2004Cyrille Thomas DIAMOND Storage Ring Optical and X-ray Diagnostics.
1 Prototype Calibration System for Forward Hadron Calorimeter L. Almeida, M. Baarmand, L. Caraway, M. Hohlmann, T. Qureshi, I. Vodopianov FLORIDA TECH.
Storage ring optics characterization – the basics
Booster Top-off Computer Controls System C. Timossi November 22, 2004.
G5 Beam Instrumentation D. Gassner, E. Pozdeyev 4-09.
Dual PD Amp Circuit Board Test Results By Alexa Staley LIGO G v1 1.
Oct 17, 2001SALT PFIS Preliminary Design Review1 Southern African Large Telescope Prime Focus Imaging Spectrograph Mechanical Mechanism Design Michael.
RREPS'11, Egham (UK) Status of Beam Loss Detector Tests and Developments at PETRA III & ESRF Gero Kube DESY (Hamburg) Introduction: PETRA III Extension.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
Update on the Gas Ring Imaging Cherenkov (GRINCH) Detector for A 1 n using BigBite Todd Averett Department of Physics The College of William and Mary Williamsburg,
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
October, 2009 Internal Review Beam Instrumentation David Gassner.
CTF3 Streak Camera Results and Improvements Aurélie Rabiller BE-BI-PM
BPM stripline acquisition in CLEX Sébastien Vilalte.
ATF DR BPM Upgrade Janice Nelson, Doug McCormick, Justin May, Andrei Seryi, Tonee Smith, Mark Woodley.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
Low Emittance Rings 2014 Workshop INFN-LNF, 18. September 2014 Low Emittance Studies at 3 GeV at PETRA III Joachim Keil DESY.
ASTRID2 Niels Hertel Nov 2012 AARHUS UNIVERSITET ASTRID2 – Status ESLS XX Berlin 2012 Niels Hertel ISA, Aarhus University, Denmark 1.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
Fibre Beam Loss Monitoring system development BI - day 10 March 2016 M. Kastriotou, E. Nebot del Busto M. Boland, F. S. Domingues Sousa, E. Effinger, E.B.
Beam Loss Monitor activities at CTF3 and the Australian Synchrotron CLIC Workshop 18 January 2015 M. Kastriotou, E. Nebot del Busto M. Boland, E.B. Holzer,
SOLEIL OPERATION AND ON-GOING PROJECTS C. Herbeaux On behalf of SOLEIL Groups C. Herbeaux, November ESLS23, 24-25, 2015, PSI1.
V Review SPARC Diagnostic & Control Status G. Di Pirro On behalf control and diagnostic group.
Danilo Domenici – LNF. Detector Upgrades Overview CSN1 - 4 Maggio 132 Inner Tracker QCAL CCAL.
ELENA installation progress F. Butin / ELENA collaboration.
Click to edit Master subtitle style 37th ICFA Advanced Beam Dynamics Workshop on Future Light Sources Status of Beam Loss Detector Tests and Developments.
Report Technical Director Storage-Ring-Installation Completed
Beam diagnostics at the NICA
Diagnostics for ThomX N. HUBERT, M. LABAT, M. EL-AJJOURI, D. PEDEAU, Synchrotron SOLEIL I. CHAIKOVSKA, N. DELERUE, N. EL-KAMCHI LAL.
What they are What they do How to apply
Silicon microstrip detector for imaging of fast processes at high intensity synchrotron radiation beam. Budker INP V.Aulchenko1,2, L.Shekhtman1,2, B.Tolochko3,2,
SESAME Control System Status
Status of the pellet target at ITEP
Diagnostic & Control Status
Beam diagnostics from GSI
5 months of experience with 8 units of Libera Brilliance
SOLEIL Fast Orbit Feedback System
SESAME Control System Status
E. Bravin, A. Goldblatt, S. Mazzoni, F. Roncarolo, M. Palm
The ELENA BPM System. Status and Plans.
Diagnostics for ThomX Nicolas HUBERT, Marie LABAT, Moussa EL-AJJOURI, D. PEDEAU, Synchrotron SOLEIL Iryna CHAIKOVSKA, N. DELERUE, LAL.
Commissioning the Fast Orbit Feedback System at SSRF
The progress of Beam Instrumentation for BEPCII
Electronics: Demod + 4Q FE
Beam Current Monitoring with ICT and BPM Electronics
TTF 01-Exposure & Stops.
Electron cloud studies at CESR
CH-6 CABLE TV.
Device test stations Multi-probe electrical DC injection and optical input/output Near-field measurement Analogue characteristics 1) 50GHz Network analyzer,
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Introduction to Lab Equipment
Diagnostics overview Beam profile monitors Cherenkov radiators Summary
Breakout Session SC3 – Undulator
Diode Laser Experiment
Presentation transcript:

SESAME TL2 and SR Diagnostics Hussein Al-Mohammad RF & DI Group SESAME-TAC 2016-Hussein Al-Mohammad 29/11/2016

Beam Diagnostic Systems TL2 DI SR DI SESAME-TAC 2016-Hussein Al-Mohammad 29/11/2016

TL2 DI FS: All actuators are pneumatic from VAB. 4 Screens In Air screens with 20mm screens (Al2O3). Basler acA1300-gm CCD Camera (IP, PoE, Triggered). Lens with variable focal length and iris. Camera support and mount are from Thorlabs. SESAME-TAC 2016-Hussein Al-Mohammad 29/11/2016

TL2 DI FCT: Bergoz FCT 2.5V/A sensitivity. In air type. Simple bypass shield. Ceramic break to interrupt image current. Connected to oscilloscope Tektronix DPO5024. SESAME-TAC 2016-Hussein Al-Mohammad 29/11/2016

Beam Diagnostic Systems TL2 DI SR DI SESAME-TAC 2016-Hussein Al-Mohammad 29/11/2016

SR-DI 1 FS 3 2 BPM 64 FCT 4 DCCT 5 V. SCR 6 SRM 7 SHK 8 BLM Items Quantity 1 FS 3 2 BPM 64 FCT 4 DCCT 5 V. SCR 6 SRM 7 SHK 8 BLM BPM BPM BPM BPM Arc Chamber SESAME-TAC 2016-Hussein Al-Mohammad 29/11/2016

SR-DI/FS FS: 3 FS in Storage Ring. 1 Stepper motor FS, It’s have 2 positions for injection and 1st turn. 2 FS are pneumatic from VAB. In air screens. 20mm screens (Aluminum Oxide). Basler acA1300-gm CCD Camera (IP, PoE, Triggered). Lens with variable focal length and iris. Camera support and mount are from Thorlab. SR-FS (Pneumatic) SR-Injection FS (Motorized) SESAME-TAC 2016-Hussein Al-Mohammad 29/11/2016

SR-DI/FCT & DCCT FCT and DCCT: 2.5V/A sensitivity for FCT, 0.05V/mA for DCCT (200mA scale). Higher cutoff frequency for FCT 800MHz (Bergoz) due to big size of the core. Capacitance of the ceramic and beam shield optimized to meet FCT requirements . Beam Shield DCCT Sensitivity (200mA scale) Final Assembly FCT higher cutoff frequency SESAME-TAC 2016-Hussein Al-Mohammad 29/11/2016

SR-DI/FCT & DCCT FCT and DCCT: Share the outer shield and ceramic gap. Soft Iron for outer shield. 2 layers of Mu metal. Both are tested in the Lab. DCCT tested in final location by test function from the electronics with the reading instrument DVM (Agilent 34410A) and controlled from control room. SESAME-TAC 2016-Hussein Al-Mohammad 29/11/2016

SR-DI/BPM BPMs: Libera Brilliance+. 12 Units installed in the SA 48/64 BPMs are connected to Libera Clock splitter from CAEN for MC and Trigger. Tested with the cables. SESAME-TAC 2016-Hussein Al-Mohammad 29/11/2016

SR-DI/BPM BPMs: TWS-240-FR-4R with an attenuation 5.3dB/100f. Bundled cables (4 coaxial share one outer jacket) . SMA-M connectors from both sides ( Right Angle from BPM side). Foamed PE for dielectric and PVC for outer jacket. All cables are tested on Network analyzer (Attenuation, Phase, Group Delay and Impedance) before laying them in the ring. SESAME-TAC 2016-Hussein Al-Mohammad 29/11/2016

SR-DI/Shaker Beam Shaker: 2 Amplifiers (50W) installed in SR. Bunch by bunch feedback kickers (Hor. & Ver.) will be used for shaker (beam exciter) == on the way to SESAME. Tektronix AFG3022C Arbitrary Function Generator DC-20MHz. SS-RF Switch to control the trigger for both amplifiers. V+ V- Dqk Z0 AMP Z0 SESAME-TAC 2016-Hussein Al-Mohammad 29/11/2016

SR-DI/ SRM SRM: Shift SRM location to cell 14 for diagnostics optical hutch in future Synchrotron Light Interferometer (double slit) and direct imaging SRM. Copper mirror on the way to SESAME. (Lead time from the manufacturer). Required optical components from Thorlabs are in the Lab. 3 Motors to align the mirror from control room. SESAME-TAC 2016-Hussein Al-Mohammad 29/11/2016

SR-DI/ SRM SRM: Mirror Stepper Motor Polarization filter & Double Slit 300mm Lens Bandpass Filter Motorized Filter Wheel Camera Lens Extension Tube CCD Camera SESAME-TAC 2016-Hussein Al-Mohammad 29/11/2016

SR-DI/BLM & SRM BLM: Deal with I-Tech was changed ! (8 BLD and 2 BLM). Replace 7 BLD (1 BLM) with GDX modules for FOFB. So 32/64 BPM will be used for FOFB. 1 BLD and 1 BLM are in SESAME, It will be installed in injection section. The BLM system consists of the signal acquisition electronics (Libera BLM) and the detector. Each of the four input channels provides the power supply and gain control to the photo-multipliers (PMT). GDX Module SESAME-TAC 2016-Hussein Al-Mohammad 29/11/2016

SR-DI/Racks DI Racks: SESAME-TAC 2016-Hussein Al-Mohammad 29/11/2016

SR-DI/Summary DI instruments : FS in TL2 and SR are installed.  2 complete assemblies are done and tested.  Waiting lenses to install the cameras. FCT and DCCT  All CT’s and their champers and shield are installed and tested. BPMs  All BPMs cables are connected and tested.  Libera’s are connected to the assigned BPMs and tested. Shaker  Kickers are on the way.  Amplifiers tested and trigger circuit as well. SRM  Mirror on the way to SESAME.  Motors ordered.  All optical components are in lab. BLM  1 BLM and 1 BLD to be installed next week. Scrapers  Installed , to be tested with motion control crates once it’s ready. SESAME-TAC 2016-Hussein Al-Mohammad 29/11/2016

SESAME-TAC 2016-Hussein Al-Mohammad 29/11/2016