Technical Information on How the Planning Run Works: Contents Steps in the MRP run Control parameters in the material master, in the BOM and in Customizing for MRP Net requirement calculation Lot-size calculation Scheduling BOM explosion and routing selection
MRP in SAP SEG 7420 on 13 Mar 2003
Technical Information on How the Planning Run Works: Unit Objective At the conclusion of this unit, you will be able to: Explain the individual steps of the MRP run Explain and apply the most important parameters for the MRP run configuration and their combinations.
Course Overview
Steps in the Planning Run
Net Requirement Calculation
Net Requirements Calculation in MRP
Net Requirements Calculation - Process
How to Deal with Unforeseen Developments in Requirement Quantities? Safety stock Safety stock partially available Dynamic safety stock Safety time
Safety Stock Reqmt Receipt
Safety Stock Partially Available Reqmt Receipt
Range of Coverage Profile / Dynamic Safety Stock (1)
Range of Coverage Profile / Dynamic Safety Stock (2)
Range of Coverage Profile: Intervals
Safety Time Reqmt Receipt
Safety Time in Multi-Level Production
Lot-Size Calculation
Overview of Lot-Sizing Procedures
Static Lot-Sizing Procedures
Period Lot-Sizing Procedures
Lot Sizing According to Planning Calendar
Optimum Lot-Sizing Procedures
Long-Term Lot Size Reqmt Receipt
Planning Run Executed Regularly Today Reqmt Receipt
Scheduling
Overview of the Procurement Types Special procurement types
Backward Scheduling
Forward Scheduling for In-House Production
Scheduling in Production Planning
Order Data for Basic Scheduling
Lead Time Scheduling
Scheduling / In-House Production Time
Order Dates for Lead Time Scheduling
Changing Dependent Requirement Dates
BOM Explosion
BOM Explosion
BOM Selection
Selection of Alternative BOM
Order Quantity (Lot Size)
Explosion Data - Customizing
Explosion Date
Explosion Date using the Order Finish Date
Explosion Using the BOM Explosion Number Gross Date
Production Versions
Defining the Change Status Using the Order Start Date
Defining Change Status Using the Order Finish Date
Defining Change Status Using BOM Explosion Numbers Gross Date
Route Selection
Technical Information on How the Planning Run Works: Summary (1) The steps of material requirement planning consists if net requirements calculation, determining the procurement type, scheduling and the BOM explosion. The net requirements calculation determines the available quantity for planning. The lot-sizing procedures and the procurements type are assigned in the material master.
Technical Information on How the Planning Run Works: Summary (2) Basic scheduling or the lead time scheduling are two possible scheduling types in MRP. The BOM selection is influenced by the selection ID, the alternative selection indicator and the selection of the explosion date.