Program Management Agenda

Slides:



Advertisements
Similar presentations
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
Advertisements

1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
1 PM NAAQS: Update on Coarse Particle Monitoring and Research Efforts Lydia Wegman, Office of Air Quality Planning & Standards, EPA Presentation at the.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Robert Ruland MMF Bench/CMM Procurement Plan October 14, 2004 MMF Review 1 MMF Bench / CMM Procurement Plan Robert Ruland Procurement.
M. White – June 28, 2004 LCLS Requirements Meeting In a project, we live or die by the schedule. After we’re “baselined” it is our plan for what we will.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
Major Management & Systems Engineering Ideas for Reducing Costs Peter Wizinowich NGAO Team Meeting September 11-12, 2008.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
TEMPO Mission Project July 23, 2013 Project Manager: Alan Little.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
Purchasing Overview. Fundamentals of Purchasing Procedures.
ASPERA-3 Sep. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 9_25/ Page 1 Monthly Status Report Report due 9/25/00 Schedule statused.
1 PFP MSR, 11/17/2009 Particles and Fields Package Monthly Status Review (MSR) November 17, 2009 Dave Curtis, PFP PM.
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
THEMIS Pre-Confirm 02/04/040 Final Inputs Pre-Confirmation Review February 4, 2004 Probe & Probe Carrier Program Management Director of Civil and Commercial.
THEMIS MISSION PDROVERVIEW- 1 UCB, November 12, UCB/Swales should identify an individual that will assume responsibility for magnetic cleanliness.
THEMIS peer Instrument CDR 1 CETP, Paris, April 8, 2004 THEMIS Mission Status at Peer UCB Instrument Critical Design Review UCB, April 19/20, 2004 Vassilis.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
THEMIS MPDR PM 11/12/20030 Mission PDR Cost & Schedule Review Probe & Probe Carrier Program Management Director of Civil and Commercial Space Michael Cully.
THEMIS FGM CDR Peer ReviewBerlin, April 6, UCB/Swales should identify an individual that will assume responsibility for magnetic cleanliness on.
Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Jerry Kim, SSL Mechanical.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Solar Probe Plus FIELDS DFB Report Quarterly Management July 18, 2013.
Federal Acquisition Service ETS2 Transition Planning Meeting # 19 ETS2 Transition Planning Meeting # 19 January 25, 2012.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
FM1 Instrument Suite Pre-Ship Review (PSR)AGENDA 1 UCB, September 21, 2005 THEMIS T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST Science Support Center May 8, 2006 GUC Meeting AI#28. SAE Release Schedule David Band (GSSC/JCA-UMBC) Julie McEnery (GSFC)
EMIS Chapter 5 Much of Chap 5 and 6 varies depending on the contract type. Two major types are important so we’ll digress to Contracting 101 for.
PR70007 – MarkeTrak Ph2 ERCOT Marketrak Task Force February 7, 2008.
Planetary Lander PDR Team Name
Green Line Extension Project
Senior Staff Meeting November 12, 2008
Double Star Progress Meeting #3 Beijing 2 July, 2002.
THEMIS Mission Confirmation Readiness
Colorado Plugfest Planning
0.0 Instrument Suite Name Presenter’s name
2K CB FDR Overview:  Agenda, Charge, Review Process
University of Colorado at Boulder January 21, 2004 Boulder, Colorado
Instrument Preliminary Design Review (I-PDR) September 28th, 2005
Current SOC-Ground System Integration Schedule (Jan )
Peer Review Agenda (Suggested).
THE OFFICE OF PROCUREMENT CONTRACT TRAINING MAY 2018
GM Remarks Fiscal and Management Control Board September 11, 2017.
X-ray Pump-Probe Instrument
Terry Cotter LO/IF Group Leader
Amendment Invoice Task Force Progress Report
Lockheed Martin Canada’s SMB Mentoring Program
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
Amendment Invoice Task Force Progress Report
Instrument Preliminary Design Review (I-PDR) June 27th, 2005
Amendment Invoice Task Force Progress Report
Approach to Market Cutover - Draft for Discussion
DSC ChMC CSS update 11th December 2018
Amendment Invoice Task Force Progress Report
Amendment Invoice Task Force Progress Report
Command and Data Handling
<Your Team # > Your Team Name Here
G Project Sponsor & Business Lead : Anna Stamp & Jane Johnston
STARTING FUNDING YEAR (FY) 2020
Presentation transcript:

Mission Preliminary Design Review Probe & Probe Carrier Program Management Mission Preliminary Design Review Michael Cully Swales Aerospace THEMIS MPDR PM 11/12/2003

Program Management Agenda Swales THEMIS Organization Swales/Hammers team experience levels Procurement Status - Probe & Probe Carrier PDR RFA #10 List of Subsystems Awaiting Final Analysis & Selection Major Milestone Schedule To be discussed at Friday’s meeting included for reference THEMIS MPDR PM 11/12/2003

Swales THEMIS Organization THEMIS MPDR PM 11/12/2003

Procurement Status In order of Schedule Priority PDR RFA #10 List of Subsystems Awaiting Final Analysis & Selection Tanks - ARDE Corp. First TIM held in September 2003 ICD signed off Long lead procurements started At least 4 months of schedule contingency for Probe 1 No issues Reaction Control System - Aerojet First TIM held at Aerojet November 10th ICD started Base Plate simulators will be built by Aerojet based on Swales drawings to begin buildup of systems Interfaces with Latch vendor begun to characterize magnetics Will trigger Option 1 for larger Thrusters this week (SCN #3) This change will afford operational efficiency therefore reducing risk on the program At least 2 months of schedule contingency for Probe 1 THEMIS MPDR PM 11/12/2003

Procurement Status In order of Schedule Priority con’t PDR RFA #10 List of Subsystems Awaiting Final Analysis & Selection Separation System - Swales Aerospace ETU detail design in full swing Long lead procurements for ETU to begin December 2003 Weekly reviews to begin 11/17 on Schedule Status Bus Avionics Unit - GDDS/Swales Commercial processor card in use at Hammers since August Swales to purchase 2nd commercial processor card for FLATSAT Nov 03 Several meetings held at GDDS to discuss development & pricing GDDS on contract for processor board EDU development & I/F design Swales working preliminary designs of Power & Comm Card with hand over to GDDS in December for full EDU development Currently working second revision of Processor Board Specification Plan is to migrate to a FFP for Processor Board & BAU flight production At least 1 month of schedule contingency for Probe 1, however EDU can be used as backup to start Bus I&T in early 2005 Need to work FPGA & bulk memory parts procurement schedule (CFE) THEMIS MPDR PM 11/12/2003

Procurement Status In order of Schedule Priority con’t PDR RFA #10 List of Subsystems Awaiting Final Analysis & Selection Transponder – Competitive Procurement Proposals received 10/30/03 and management evaluation completed Management questions sent out 11/06 with response due back 11/10 Technical evaluation completed by Swales need to work some issues with UCB MOC Fact finding & negotiations scheduled for 11/18 – 11/20 Expect award week of 11/24 with concurrent long lead procurement turn on Only issue is lock in of Transponder frequency and schedule Sun Sensor - Competitive Procurement Proposals expected 11/17/03 Have responded to a number of questions from Adcole Attempting to secure spare parts (20) from ST-5 program (LM6144 IC) Request sent to ST-5 programs & Explorers Office last week Expect award end of November 2003 Schedule should not be an issue THEMIS MPDR PM 11/12/2003

Procurement Status In order of Schedule Priority con’t PDR RFA #10 List of Subsystems Awaiting Final Analysis & Selection Batteries – Competitive Procurement (2 vendors) The SOW and Specification are in second round of review at Swales Anticipate release of RFP week of November 17th with response due middle of December Trade will be between cost, battery sizing (amp-hrs) and mass from bidders Potential to leverage ST-5 work in this area Do not expect schedule to be problem Award late December or early January 2004 Antenna - Competitive Procurement (2 vendors) The SOW and Specification are ready for release pending completion of Ball Aerospace RF pattern study. Completion of study scheduled for end of November. As stated at PDR study to date looks promising. Assuming no issue with pattern study RFP will be sent out early December with responses due back late December (if there is no interest by second vendor we will forgo competitive procurement and sole source which would reduce cycle time) Do not expect schedule to be a problem since patch antennas are generally not long lead Expect award end of January 2004 THEMIS MPDR PM 11/12/2003

Procurement Status In order of Schedule Priority con’t PDR RFA #10 List of Subsystems Awaiting Final Analysis & Selection Solar Arrays – Competitive Procurement (2 –3 vendors) The SOW and Specification are in second round of review at Swales Proposed layouts being reviewed by UCB/UCLA A number of layouts have been proposed with different cell sizes and patterns to minimize magnetic characteristics Anticipate release of RFP mid December with response due middle of January 2004 Do not expect schedule to be problem since pacer will be Swales panels Contract will allow for early long lead procurement. Certain vendors have overstock from commercial programs reducing cycle time Award late January 2004 GYROS – Stock Item produced in quantity with Swales specifying the highest grade Structures – Generally produced in-house Composite structures (Probes) are being worked with manufacturing organization and Swales has significant capacity (Tooling design has been started) Large machining parts can be done at a number of local vendors or in-house EGSE – COTS Equipment With exception to RF Racks all equipment is literally off the shelf and will be configured at Swales Procurement to start early January 2004 THEMIS MPDR PM 11/12/2003

Major Milestone Schedule #1 General Assumptions Five day work week with 8 hrs per shift Exception to above rule will be TV/TB testing and major moves I&T schedule constrained by Team availability starting with Probe 1 build Weekends can be used to make up schedule prior to mission I&T THEMIS MPDR PM 11/12/2003

Major Milestone Schedule #2 UCB has identified that the Instrument suites will be available earlier allowing for the early start of integration at Swales Bus Integration Schedule Contingencies Currently working day to day scheduling flow with UCB THEMIS MPDR PM 11/12/2003

Major Milestone Schedule #3 Probe Carrier Schedule Contingency is in parallel with Probe schedule contingency Note Probe #1 has significant slack at end of I&T since it starts earlier than all other Probes. This allows for, pending I&T Team/EGSE availability, to use Probe #1 in mission simulations THEMIS MPDR PM 11/12/2003