Radio Qualification Testing

Slides:



Advertisements
Similar presentations
Genuine P25 Interoperability: Tips and Traps When Moving to Digital Radio Scott Skibness Tait Communications.
Advertisements

TAG Content Development MOTOROLA and the Stylized M Logo, and ASTRO are registered in the US Patent and Trademark Office. All other product or service.
FIRE COMM Subscribers’ Portable Radio user guide
Radio over Internet Protocol
GP2013 (R2) New features in GP2013 (R2). New Ribbon for windows Edit List is the Print button on the right without the paper background Action pane can.
Portable Radio Operations
NCAR & Nextel Presented by Del Harris Bryan Anderson.
Montgomery County P-25 Simulcast Radio System A Brief Overview of the System and Equipment.
May 2007 North Zone – Communications Motorola W9 Control Head North Zone Communications Committee.
Vehicular Repeater System (VRS) November: What is VRS? VRS is short for Vehicular Repeater System – All of the regular Battalion Chiefs’ buggies.
Lesson 5 Computer-Related Issues
Yuma Regional Communications System
Digital Mobile Radio A. K. A
1 Radio Communion Modes  Simplex  Repeater  Trunking Blackberry REACT Presentation Presented to Blackberry REACT, September 2, 2009 By Phil Henderson,
Basic System and Subscriber Programming Considerations
Louisiana SIEC 03/25/2009. WCC History State Interoperability Executive Committee - Feb / Aug 2004 State Interoperability Executive Committee -
Getting Started in Blackboard. You will need… A web browser, preferably Internet Explorer, version 4.0 or higher An account and the knowledge of.
Radio Technology Presentation
Jackson County School District Interoperable Radio Proposal.
Club Program for October 2006 By Rick Sohl – K5RIC.
Conventional vs. Trunking Radio Systems
Radio Communications System Failure and System Trouble.
Motorola’s ASTRO 25 IP Platform
Public Safety Radio System Upgrade County Administration / Public Safety November 23, 2010.
North Zone – Communications
Service Options: Hardware Warranty, Software Maintenance and Support.
Administering Windows 7 Lesson 11. Objectives Troubleshoot Windows 7 Use remote access technologies Troubleshoot installation and startup issues Understand.
User Technical Committee Radio Technology Discussion
Vertex Standard Product Training. 2 Portables 3 VX channel capacity 5 Watts power output (selectable to 1 Watt) MIL-STD 810 C/D/E 12.5/25 KHz.
Spokane Regional Communication System Overview By Scott Grimmett of Industrial Communications.
C25 Series APCO P25 Decoders. P25 Data Interface Desktop Display DecoderPage3 P25 data to RS-232 Serial DataPage 11 P25 data to MDC-1200 FSK Page14 Remote.
Presenter: Paul D. Linnee, ENP -Former Minneapolis 911 Director -Early planner of TC Metro radio system in 1980s and 1990s -Retained by State of Minnesota.
Communication in Rural Minnesota. Minnesota Snowdrift.
Gnizr-feed University of Maryland, Baltimore County CMSC 691S/491S Paul Swenson Alice Carback.
May 2007 North Zone – Communications Motorola 05 Control Head North Zone Communications Committee.
© 2002 IBM Corporation Confidential | Date | Other Information, if necessary June, 2011 Made available under the Eclipse Public License v Mobile.
What is new In Pangea 6.06 & 6.07 September 5, 2012 Pangea 6.06 – Jun 26 Pangea 6.07 – Aug features and bug fixes.
Buchanan County Communications Public Safety Radio System Radio Systems 101.
Tomorrow's Solutions Today 111 Digital Trunked Radio Scanning Review “in plain language” Developed and produced by On Target Training & Consulting, LLC.
University of Toronto at Scarborough © Kersti Wain-Bantin CSCC40 testing and installation 1 for testing you need: test data and test cases test plans and.
Intro to DMR in Amateur Radio Anoka County Radio Club and Emergency Services, Inc. 01-Apr-2016 Shep Shepardson N0NMZ.
The member organizations of the National Public Safety Telecommunications Council are grateful to the Department of Homeland Security's Science and Technology.
Capabilities Statement Radionet Communications, Inc. 2 November, 2009.
CHANNEL LOADING CALCULATOR FOR 700 MHz Regional Planning Committee Guidance By Joe Kuran Wednesday March 9 th 2016.
A PRESENTATION ON VOCATIONAL TRAINING IN BSNL. 2 3-Jul-16 GSM (Global System For Mobile Communication) The Global System for Mobile communications (GSM:
CHANNEL LOADING CALCULATOR
Oneida County Public Safety Communications Upgrade Project:
Managing the Project Lifecycle
Chapter 2 Introduction to Computer User Support
LARICS ISSI/CSSI 10/18/17 Ted Pao, IT Specialist, LARICS Project Lead
Learn How to Register as a Student and Upload a Resume
Northwest Regional Emergency Communication's Center
Product Support Program
Programming Your Radio
Digital Mobile Radio The very basics
Lesson 5 Computer-Related Issues
San Diego County & Imperial County
S i g n L a n g u a g e LAB ORIENTATION.
Pubic Safety Radio System Paging System Operation Overview
Test Driven Development
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Final Design Authorization
Digital Voice Modes for Amateur Radio
Test Driven Development
STARCOM21 State Wide Communications System
Young Ladies Radio League (YLRL)
Reporting 101 Keenan & Mona.
IBM Data Center Tech Support Survey Results
DMR OPERATING BASICS & BEST PRACTICES
What is this thing called DMR ?
Presentation transcript:

Radio Qualification Testing Riverside County A7.15 APCO P25 Phase 2 TDMA

NW Simulcast PS Simulcast Indio Simulcast HPD Site SJ Simulcast NORTHWEST (NW) SUBSYSTEM (13 Sites) Ortega Cell ( 4 Sites) PALM SPRINGS (PS) SUBSYSTEM (4 Sites) ASTRO 25 Trunked Repeater Sites (20 Sites) Blythe Cell ( 5 Sites) Astro 25 Sites NW Simulcast VHF Sites PS Simulcast Desert Cell Indio Simulcast HPD Site SJ Simulcast BlytheSimulcast HPD Site HPD Site Astro 25 Sites SW Simulcast VHF Sites Ortega Simulcast Santa Rosa Simulcast SOUTHWEST (SW) SUBSYSTEM (11 Sites) SAN JACINTO (SJ) SUBSYSTEM (12 Sites) INDIO (IC) SUBSYSTEM (6 Sites) Desert Cell ( 3 Sites) Santa Rosa Cell ( 2 Sites) HPD High Performance Data (27Sites)

Start of Process APCO 2014 New Orleans State of Nebraska finished similar testing Development of process State of Nebraska’s documentation Motorola subscriber ATP documentation Radio fair with radios that pass a qualification process

Excluded from Testing Non APCO Project 25 features Motorola FailSoft GPS tracking Motorola FailSoft

Results of Testing 5 out of 10 portable radios passed the clinical testing Test process included field testing and drive testing Radios were purchased

Post Qualification Issues Scrambled Audio Multiple Vendors have experienced scrambled audio since passing the qualification testing 1 call out of 200 will not decode properly Difficult time with building codeplug, personality, profile The vendors provide enough help to make the radio work, but leave a lot of features left undiscussed Zones versus systems Time to build files

Post Qualification Issues (Cont.) Radios that pass the qualification testing but then fail after fielding Talk permit tone but no tx audio No talk permit tone Scrambled audio (encryption) Out of Range in known good coverage Full spectrum scanning Roaming

Lessons Learned Need larger test pool of users 500 – 1000 PTT’s per radio type Time, current time per radio is one week. This will need to be extended. Maybe 2 months in field with heavy use by users Cost of testing each radio Cost of troubleshooting issues

Lesson’s Cont. Training for staff once radios have been purchased Repair parts for radios Flat rate repair Extended Warranty Need to have knowledgeable individual from vendor on site for testing. APCO P25 encourages competition among vendors. How many vendors can you support?

Lesson’s Cont. System Key issues Feature option One vendor more tightly controlled than others Need ability to tighten restrictions Feature option User selectable encryption keys (model of radio specific) Emergency calls (how are they handled)

Where are We Now? Initially passed 5 vendors (Portables) Purchased 2 different manufacture radios Both radio vendors are having issues We have suspended any new orders for the system No additional testing until issues are resolved with existing vendors

Where are We Now (Cont.) Working with current fielded vendors to resolve issues Tried different code versions Staff time for troubleshooting The County wants this to be successful for competition but also wants users to be safe

Questions?