Earswick Neighbourhood Plan Residents Survey No 2

Slides:



Advertisements
Similar presentations
Playland Attendance for 2014 & Playland Attendance for 2012 & 2011.
Advertisements

Last Gasp John Baker the potential of spatial planning to contribute to air quality.
Dr Chris Boomer Development Plans Manager (DoE Northern Ireland)
Somerford Keynes Parish Council Neighbourhood Development Plan PARISH PRESENTATION 19 th JANUARY 2015.
Issues and Options Consultation September Plans A Neighbourhood Plan Our vision and local planning policies Housing, Business and Employment, Tourism,
Droitwich South Ward Meeting Yew Tree Development Community Hall 29 th June 2011 Facilitated by Cllr Richard Morris Neil Pearce, Development Manager Andrew.
Wiltshire Green Infrastructure Strategy. What is green infrastructure? The Wiltshire Green Infrastructure Strategy Wiltshire’s existing green infrastructure.
Objecting to Development
Salford Draft Core Strategy Graham Gentry Head of Spatial Planning.
Langdon Parish Council Site Allocation Consultation Two sites at East Langdon One site at Green Lane, Martin Mill.
Wootton Wawen Neighbourhood Plan Wootton Wawen Neighbourhood Plan Welcome Survey feedback Current status of activities What next?
National Planning Policy Framework Member Briefing 1 st May 2012 Mark Russell Planning Advisory Service.
Meeting with Governors Kislingbury Primary School December
Urban Design Goals: Produce a high quality living environment for all residents. Clarify and enhance the relationship between new housing development and.
Mid Wales LTP Stakeholder Workshop 3 rd October Presentation by Ann Elias and Janice Hughes.
© Bishop’s Stortford Town Council Bishop’s Stortford Neighbourhood Plan Silver Leys and Meads Wards Draft Transport Stage One 5 February 2013.
Your town – your plan Bishop’s Stortford Neighbourhood Plan All Saints, Central, South and part of Thorley Neighbourhood Plan Team Meeting 17 th February.
The Bikers Convention By David Wilson Maintenance Officer.
© 2007 PMP. All rights reserved. Wednesday 18 th July South Northamptonshire Council Open Space, Sport and Recreation Study and Green Space Strategy.
Planning for the future of our district Core strategy options Presentation to C4B Associates February 2010.
PARKING STRATEGY POLICY DEVELOPMENT Transportation & Asset Management Environment & Regeneration Scrutiny Committee 28 February 2007.
National Planning Policy Framework Based on Consultation ended 17 th October Issues affecting Local Councils.
Shenstone Neighbourhood Plan Working Groups launch event 18 th June 2013.
Woodford Neighbourhood Forum Questionnaire Preliminary Analysis of Results.
Powered by Earswick Village Residents Questionnaire Key Findings October 2015.
Neighbourhood Development Plan December 1 st, 2013.
Submission Document went to cabinet … Planning for the Future Core Strategy and Urban Core Plan (the Plan) is a key planning document and sets out the.
STOUR AREA COMMUNITY COMMITTEE 17 July PURPOSE AND CONTENT OF PRESENTATION To provide an Area based analysis to underpin the State of The District.
An area of significant change and identified as: Placeshaping in West Hampstead Area of Intensification in the London Plan Work completed and underway:
DRAFT INNER MELBOURNE ACTION PLAN Presented by Elissa McElroy IMAP Executive Officer January 2016.
HAVE YOUR SAY! Six week consultation period 15th February - 28th March 2016 DRAFT UTTOXETER NEIGHBOURHOOD PLAN.
Neighbourhood Planning in Haringey Myddleton Road Strategic Group 7 th November 2013.
Woodford Neighbourhood Forum 1. 2 This presentation is a brief summary of the work of WNF. It is supported by two circulated documents The Annual Progress.
12 th April  What is it?  Why now?  Who’s doing it?  What are the benefits?  What will the plan look like?  How is it done?
1 Neighbourhood Plan Questionnaire Results May 2016.
25 th April  Vision  Objectives  Progress  Consultation Analysis  Site Evaluation Criteria  Site Evaluation Process  What Next?  Questions.
New Forest National Park Local Plan Review NFALC Briefing - 21 April 2016 Steve Avery – Executive Director, Strategy & Planning.
The National Planning Policy Framework: what it means for you.
Gloucestershire County Council Devising a Spatial Vision & objectives for the MCS Robin Drake – Principal Planning Officer.
Item 3 South East Plan and recent policy statements…
Planning Explained Module 4 – Engaging with Neighbourhood Planning.
Local buffer support Program
Neighbourhood Planning Stoke Mandeville
Residents’ questionnaire survey June 2017
Broadclyst Neighbourhood Plan
Warwickshire, Coventry and Solihull Local Nature Partnership
Building A Political Consensus
Draft Babergh Mid Suffolk Joint Local Plan
Simon Williams Footprint Futures 2 November 2015
Draft Transportation Element September 6, 2017
The Plan - Information Stage 1
Environment designated fund
The Regeneration of Swanley
Future Village development key requirements
Shaping the future of Laverstock and Ford Parish
Local buffer support Program
Winkleigh Neighbourhood Plan What is the Neighbourhood Plan?
Sandon Neighbourhood Development Plan and Questionnaire Results
Neighbourhood Planning in the North Wessex Downs AONB
Neighbourhood Plans What is a Neighbourhood Plan?
WPC S P D Concerns.
The relation between Human behavior and the built environment.
Neighbourhood Planning
Topics Strategic aims Commissioning Current provision Next
The Neighbourhood Development Plan
ELLINGHAM PARISH COUNCIL NEIGHBOURHOOD PLAN
Woodstock Community and Infrastructure Delivery Plan
Land Use 101: The Design Process
Royal Leamington Spa Neighbourhood Development Plan 2029
Histon Road LLF Resolutions and Programme
Presentation transcript:

Earswick Neighbourhood Plan Residents Survey No 2 Draft Vision and Objectives Key Findings June 2016

Introduction The Draft Neighbourhood Plan will state that: There will be no building on the green belt There will be no change to the existing green belt boundary Green spaces will be protected Areas of conservation/wildlife value will be protected Sports, Amenity and Leisure areas will be protected

Introduction If development is forced upon the village then the Neighbourhood Plan should provide an insurance policy by stating that: Brownfield sites must be developed first Any increase in the number of houses must not exceed 10% over the next 20 years

Background Builds on findings from first questionnaire Essentially Earswick is a great place to live and you wish to sustain and enhance this Key issues Development (e.g. limiting development esp. new housing, retain village size/characteristics) Protect green belt and open spaces Security – open spaces and community safety Also other issues Other housing issues (e.g. good quality) Road safety and traffic issues e.g. pedestrian, cycling, roads and public transport Good maintenance (public areas, homes, etc.)

These will then form the basis of the Plan Background A working party has led translating the findings of the questionnaire into key objectives/plans These will then form the basis of the Plan The questionnaire sought residents views on these emerging objectives/plans 61% (206) response rate very good The findings of which are set out below

Draft Objectives Our Neighbourhood Plan aims to maintain and improve our distinctive ‘small, green, safe and friendly village’ while accommodating some modest development to support City of York Council’s growth ambitions over the next 15 years. In order of importance of issues identified by you, our plan objectives are to: Ensure that the village continues to be a safe and secure place in which to live; Protect our open space and the landscape; Seek ongoing improvements to public transport facilities, road and pathway conditions; Deliver modest housing development that is sensitive to the environment, infrastructure constraints and improves the quality of life for all current and future residents; Maintain and improve local facilities for all residents.

Objective 1: Ensure that the village continues to be a safe and secure village to live in Construct the proposed security fencing around the open space areas and to continually monitor the security of these areas. Consider improved security measures around the village hall to combat antisocial behaviour.   Continue to support and encourage residents to take part in the Neighbourhood Watch Scheme.  Continue to have regular dialogue with representatives of North Yorkshire Police with regard to the provision of security and to combat crime.  Ensure that any new developments implement appropriate security measures.   Work with other stakeholders to discourage unwanted cold-calling.

Objective 1 - What’s important to you? Ensure that the village continues to be a safe and secure to live in - % of those responding agreeing or strongly agreeing; ranked Regular dialogue with NY Police (97%) Work with stakeholders to discourage cold callers (96%) Support Neighbourhood Watch Scheme (92%) Any new developments to include appropriate security measures (87%) Improved security measures around village hall (72%) Construct security fencing around open areas (60%)

Objective 1: Ensure that the village continues to be a safe and secure village to live in

Objective 2: Protect our open space and the landscape. Protect the unique rural character of our village. Enhance and maintain the existing acreage of public open space. Protect as much of the existing Green Belt. Protect and where possible restore, create and manage existing and potential wildlife sites and habitats within the village. Protect our existing natural distinctive landscape. Ensure that all development proposals do not have an adverse impact on existing wildlife sites or habitats. Ensure that all applications for development should demonstrate within their Design and Access Statements how the need to minimise any negative visual or landscape impact will be addressed in the scheme design. continued….

Objective 2: Protect our open space and the landscape (continued) Ensure that any new housing and development proposals within the Village include an environmental assessment of their potential impact on woodlands, hedgerows, ponds, streams, verges/ditches and any other geological features as well as existing open views and vistas. Encourage the use in developments of soft landscaping to match and where possible enhance the existing natural environment. Ensure any applications to fell significant trees must be supported by appropriate evidence. Develop a strategy with other stakeholders on how to minimise/eradicate the fouling of our footpaths and open spaces by dogs.

Objective 2 - What’s important to you? Protect our open space and the landscape - % of those responding agreeing or strongly agreeing - ranked Develop a strategy to minimise/eradicate dog fouling on footpaths and open spaces (96%) Enhance and maintain open space (95%) Protect and wherever possible enhance wildlife sites (95%) Protect our landscape (94%) Ensure that all minimise there visual impact (93%) Ensure that any development includes an environmental assessment of their impact on woodlands, hedgerows, views etc. (91%)

Objective 2 - What’s important to you? - cont Protect our open space and the landscape - % of those responding agreeing or strongly agreeing – ranked Ensure any application to fell significant trees is supported by evidence (91%) Protect the unique character of our village (91%) Encourage in development the use of soft landscaping (90%) Protect as much of the Green Belt (90%) Ensure that development do not have an impact on habitats and wildlife sites (90%)

Objective 2: Protect our open space and the landscape

Objective 3: Seek ongoing improvements to transport facilities, road and pathway conditions. Carry out a thorough review of all traffic issues within the village. Engage with the Highways Department to discuss safer routes for pedestrians and cyclists crossing the ring road as part of the reconfiguration of the roundabout on the A1237. Investigate ways to improve public transport by engaging with relevant stakeholders. Explore with City of York Council the possibility of providing a cycle lane through the village to Huntington, possibly as part of the ring road improvements. Continued ….

Objective 3: Seek ongoing improvements to transport facilities, road and pathway conditions (continued) Ensure that any applications for development identify and consider the additional level of traffic that they are likely to generate. They should assess the potential impact of this traffic on pedestrians, cyclists, road safety, parking and congestion within the Village and include within their proposals measures to mitigate any adverse impact. Ensure that any applications for development in the Village consider how they will improve safe movement of pedestrians and cyclists to the services and community facilities within the village.

Objective 3 - What’s important to you? Seek ongoing improvements to transport facilities, road & pathway conditions - % of those responding agreeing or strongly agreeing Engage with the Highways Department to discuss safer routes for cyclists and pedestrians cross the ring road (96%) Ensure any development considers the additional level of traffic they may generate and include any measures to mitigate this (89%) Carry out a thorough review of all traffic issues within the village (88%)

Objective 3 - What’s important to you? - Cont. Seek ongoing improvements to transport facilities, road and pathway conditions - % agreeing or strongly agreeing Ensure any development considers how they will improve the safe movement of pedestrians and cyclists (87%) Investigate ways to improve public transport (84%) Explore with CYC the possibility of providing a cycle lane through the village to Huntington (77%)

Objective 3: Seek ongoing improvements to transport facilities, road and pathway conditions

Objective 4: Deliver modest development that is sensitive to the environment, infrastructure constraints and improves the quality of life of all current and future residents. Ensure that any new development enables proportionate growth, does not exceed 10% of the current village size over the next 15 years, allows for gradual expansion and evolution of facilities and will not undermine the character of the Village. Identify sites suitable for housing development. Proposals for new housing developments should adopt the approach to design, siting and layout that will be set out in the Plan. To achieve this, there will need to be a mix of sizes and costs with some new housing being affordable to local people. Ensure any new housing broadens the range of stock available in the Village; the type and cost of new housing should meet the housing needs of the local area for now and into the future. Continued….

Objective 4: Deliver modest development that is sensitive to the environment, infrastructure constraints and improves the quality of life of all current and future residents (continued) Ensure developers give consideration to any suitable brownfield sites before putting forward plans to build on open countryside. Ensure any new development adds to the vitality of the community. Developers should demonstrate how their proposals would help to maintain a balanced community into the future. Ensure any new development is not prominent in scale or significantly change the character of the village. It should reflect the type and quality of housing as that existing within the village. Ensure any new development is of a height and appearance that does not adversely affect key distinctive views into and out of the village.

Objective 4 – What’s important to you? Deliver modest development that is sensitive to the environment, infrastructure constraints and improves the quality of life of all current and future residents - % of those responding agreeing or strongly agreeing Ensure developers give consideration to any suitable brownfield sites (87%) Ensure than any development does not affect key distinctive views into and out of the village (86%) Ensure that any development is not prominent in scale or significantly change the character of the village (82%)

Objective 4 – What’s important to you? - Cont. Deliver modest development that is sensitive to the environment, infrastructure constraints and improves the quality of life of all current and future residents - % of those responding agreeing or strongly agreeing Ensure any development adds to the vitality of the community as well as a balanced community (81%) Ensure that new development enables proportionate growth, does not exceed 10% of the current village size (77%) Ensure that any new housing broadens the range of stock in the village (69%) Identify suitable sites for housing development (66%)

Objective 4: Deliver modest development that is sensitive to the environment, infrastructure constraints and improves the quality of life of all current and future residents

Objective 5: Maintain and improve local facilities for all residents Engage with voluntary and community sectors to improve usage of existing facilities and identify areas for improving or adding to those facilities. Understand the needs of young people and where funds allow extend facilities for them and ensure that their views are heard and addressed as far as possible. Encourage members of the community to get involved in the activities of the Village. Ensure any new housing/development identifies the impact on facilities and how the facilities can be enhanced to meet proposed growth. Where necessary, developers should also ensure that there is safe and easy access for residents from their site to local facilities and services. Any new housing development must explore the economic viability of establishing community health facilities within the village.

Objective 5 – What’s important to you? Maintain and improve local facilities for all residents - % of those responding agreeing or strongly agreeing Ensure any development identifies the impact on facilities and how the facilities can be enhanced to meet proposed growth (84%) Understand that the needs of young people where funds allow to ensure their views are heard (81%) Engage with voluntary & community sectors to improve usage of facilities (80%) Encourage members of the community to get involved in the activities in the village (77%) Any new housing development must explore the economic viability of establishing community health facilities with in the village (65%)

Objective 5: Maintain and improve local facilities for all residents

Summary On the whole the majority of responses are in strongly favour of the proposed objectives/plans Most 80% rating Highest 90%+ - transport (safer routes for cyclists and pedestrians cross the ring road) and protecting green belt/open spaces Lowest 60% - Security fencing around open areas

Next Steps Still work to be done to develop objectives into draft plan Liaise with CYC and residents Send Plan to CYC and Independent Examiner If they are content then hold referendum of local residents on Final Plan If then approved by 50%+1 of those voting, have a ‘made’ Plan which means planning and other decisions are based on policies specific to and tailored to the needs of Earswick

“Voting ‘no’ for a neighbourhood plan does not mean a vote for no development, but for no control over development” Nicholas Boles MP Planning Minister 2013

Introduction The Draft Neighbourhood Plan will state that: There will be no building on the green belt There will be no change to the existing green belt boundary Green spaces will be protected Areas of conservation/wildlife value will be protected Sports, Amenity and Leisure areas will be protected

Any Questions