CHANGING PROJECT DELIVERY SYSTEMS

Slides:



Advertisements
Similar presentations
Presenters Scott Gaudineer, Program Executive Caldwell Flores Winters
Advertisements

Wickwire Gavin, P.C. Minnesota Department of Transportation November 29, 2000 Michael C. Loulakis, Esq. Design-Build: Understanding the Basics.
? Design/Build What do consultants think?. A piece of the puzzle D/B/O/FD/B/BC/M D/B/ODesign/BuildPM D/B/O/MOthers.
1.1Definition of Construction:. Is the process by which material, equipment, machinery are assembled into a permanent facility. Is the process by which.
Construction Project Coordination Presented by: Philip H
Organization of Primary Entities
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
Lessons Learned: CM at Risk & Design Build
Design-Build: RISKS OR REWARDS for the Consulting Engineer?
Building Success Stories: A Survey of Construction Delivery Methods PRESENTED BY: BLAKE G. POWELL.
Your Presenters Lisa Dal Gallo Dave Kirn Regional Executive/Justice Market Leader Partner, LEED AP
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
4 th ANNUAL JOINT CSU/UC PSSOA CONFERENCE March 25-26, 2003 “Emerging Construction Methodologies in CSU – What Public Works Contract Specialists Should.
1. A project delivery method describes the process of how a project will be designed and constructed. A project delivery method can be characterized in.
A Match made in Heaven? Connecting you with a builder.
Your Deliver Method... …Pick it Early
Alternative Project Delivery
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Delivery Methods  The Players from Handbook of Architectural Practice, Chapter 9.1 by Phillip Bernstein FAIA  Variables from Handbook of Architectural.
ESTIMATING By Laith Jacob.
PROCEDURES FOR SELECTING THE CONTRACTOR
Construction What is “construction” defined as or include?  Building?  Altering ?  Repairing?  Demolishing?  Public Improvements?
KFUPM, Department of Construction Engineering and Management Summary of AN IMPLEMENTATION MODEL FOR DESIGN-BUILD (D-B) PROJECT DELIVERY SYSTEM BY : MOHAMMAD.
Construction Engineering 221 Drawings and Specifications.
Prof Awad S. Hanna C HANGING P ROJECT D ELIVERY S YSTEMS by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison Department of Civil and Environmental.
CIVL202 Construction Engineering I Tutorial 2 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
TOPIC-9- PROJECT ORGANIZATION
January 24, …a delivery method which entails a commitment by the Construction Manager to deliver the project within a Guaranteed Maximum Price (GMP).
Construction Engineering and Management 1 Cost Benefits Structural Safety Architect Feasibility Assessment of architects Functional Aesthetic constructability.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Agency Construction Management :CM NOT AT-RISK
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
You passed the Bond or secured some funds What do we do now? 2014.
FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING SPRING SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.
Project Delivery Methods CM CONSTRUCTION DOCUMENTS Kevin A. Delorey 11 Feb 2010.
Kurt Krause. Topics of Discussion 1.Project Delivery Method Definition 2.Brief History 3.Alternative Project Delivery Trends 4.Key Drivers of APDM 5.Risk.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
1. Design-Build is a project delivery process in which the design and construction phases of a project are combined in a single contract. The consultant.
© 2011 Orbach Huff & Suarez 1 Lease Leaseback Project Delivery Method Kimble Cook Orbach, Huff & Suarez.
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
CAPITAL PROJECT DELIVERY METHODS APRIL 20, 2015 – SACUBO Annual Conference By Al Stoverink, AVC for Facilities Arkansas State University.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
Integrated Project Estimating & Scheduling By Dr. Awad S. Hanna Professor and Chair of Construction Engineering and Management Program Department of Civil.
Project Delivery And The Changing Roles Of Contractors
PWGSC - KOREA 2nd JCC Meeting Canadian Federal Real Property Construction Contracting Presentation by Bruce Fletcher Director General – CASMS - PWGSC November.
Nepal administrative staff college
by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison
2016 SAME Small Business Conference - Atlanta
What Small and Emerging Contractors Need to Know Introduction to Project Delivery Methods © Copyright 2017 NASBP.
What’s New in School Construction?
Class #1 Contract Delivery Systems
PROJECT DELIVERY METHODS
CHANGING PROJECT DELIVERY SYSTEMS
Project Delivery and Contract Strategies
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Construction Management
Project Delivery Systems
Nepal administrative staff college
What Will You Learn 1. How To Plan Projects
The Project Development Process:
Traditional Steps Leading To A Bid Document
Design-Bid-Build (Ch. 149) vs. Construction Manager at Risk (Ch. 149A)
PROJECT DELIVERY METHODS
MULTISPORTS CENTRE PRESENTATION
Construction Project Delivery Methods
Building Construction Delivery Systems
Honoraria for Design Build Projects Methodology Assessment Matrix
Presentation transcript:

CHANGING PROJECT DELIVERY SYSTEMS by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison Department of Civil and Environmental Engineering Construction Engineering and Management Program Prof Awad Hanna

1. Traditional Method (Design-Bid-Build) Also known as Design-Bid-Build or hard money or Competitive bid contract (most commonly “plan & spec”). Has three sequential phase Design - Bid - Construction. Architect-Engineer hired Bid/Award Design Phase Construction Phase Single Construction Contract Prof Awad Hanna

Traditional Organization Owner A/E General Contractor Own Force Sub- Contractor Sub- Contractor Sub- Contractor Sub- Contractor Prof Awad Hanna

Estimating Needs for Design-Bid-Build Complete set of drawings Specification Other contract documents General conditions Special conditions Addenda Others (soil report) Prof Awad Hanna

Hierarchy of Contract Document Addenda Special Conditions General Conditions Specification Drawing

2. Single Source Delivery 1. Design Build 2. Engineer/Procure/Construct (EPC) a. EPC model#1 (Pure CM, Construction Management) b. EPC model#2 (General Contractor acting as construction manager) c. EPC model#3 (A/E acting as CM) d. EPC model #4 (CM acting as Contractor) 3. Others Prof Awad Hanna

Fast Track or Phased Construction Method Used in DB and CM CM and A/E or DB hired Concepts Working Drawing Design Phase Construction Phase Variable separate construction contracts Prof Awad Hanna

Level of Influence Time Project Cost Influence Ability to Influence Prof Awad Hanna

1. Design Build Owner General Design Contractor Own Sub-Contractor Engineer/ Contractor Design General Contractor Own Force Work Sub-Contractor Single firm responsible for both design and construction. Prof Awad Hanna

Form of Design-Build Organization Owner Owner Owner Owner Design-Builder (Architect/Engineer) Design-Builder (Contractor) Design-Builder (Joint Venture) Design-Builder (DB Firm) Contractor Architect/ Engineer Prof Awad Hanna

Advantages of Design & Build for Owners Owner only has to communicate with one entity for the entire project Total project duration can be reduced because phased construction is easier to implement, (Fast tracking) Integration of construction planning and design phases Claims reduction (reduction of adversary relationships) Innovation in design and construction can be encouraged Risk assigned to party best able to manage that risk Reduce change orders Prof Awad Hanna

Disadvantages of DB for Owners Fewer checks and balances, owner must rely on integrity of the design-build firm Reduced owner involvement in the design process may result in less than expected results All your eggs in one basket Prof Awad Hanna

Advantages to a design-build organization Improved constructability through design/construction integration A specialized organization can be developed that has a specific expertise which will be attractive to specific market areas Reduction of negligence claims between the Architect/Engineer and the construction contractor since they are under one umbrella firm Ability to react rapidly to change in scope Prof Awad Hanna

Disadvantages for the design-build firm Acceptance of additional project risk Possible premature release of bid packages (when using fast track) which can lead to increased errors in the plans and extras Scope of work changes can be difficult to identify under DB/ fast track construction Heavy overhead due to large multi-disciplined staff requirements Prof Awad Hanna

2. Engineer/Procure/Construct (EPC) a. EPC Model #1 a. Pure CM Owner In-House Design or Engr. Firm CM Specialty Contractors and Vendor Specialty Contractors and Vendor Specialty Contractors and Vendor Specialty Contractors and Vendor EPC Model #1 Prof Awad Hanna

Cost Saving due to Competitive Bidding 120,000 100,000 105,000 Bid Pkg 1 $ 90,000 90,000 95,000 195,000 202,000 Bid Pkg 2 $ 195,000 210,000 200,000 200,000 240,000 225,000 Best Bids Received Best Bids Received Bid Pkg 3 $ 220,000 235,000 230,000 220,000 350,000 320,000 Bid Pkg 4 $ 320,000 200,000 220,000 95,000 325,000 360,000 230,000 200,000 90,000 325,000 325,000 325,000 General Contractor 1 $ 840,000 General Contractor 2 $ 845,000 Total Project Cost $ 825,000 Saves $15,000 By soliciting more bids and by passing the savings directly to the owner, the owner saves $15,000 compared to the best general contractor price. This example illustrates four bid packages. Typical commercial building projects may have thirty or more bid packages.

2. B. Engineer/Procure/Construct (EPC) (cont.) b. General Contractor acting as CM Owner Engineering/Procure Construct (GC as CM) Specialty Contractors and Vendor Own Force of the GC Specialty Contractors and Vendor Specialty Contractors and Vendor EPC Model #2 Prof Awad Hanna

Other Models of Single Source Delivery Systems C. A/E acting as CM Owner A/E and CM Prime Contractor EPC Model #3 Prof Awad Hanna

Other Models of Single Source Delivery Systems (cont.) D. CM acting as Contractor Owner A/E CM Prime Contractors Contractor EPC Model #4 Prof Awad Hanna

Others Owner Builder Owner C.M. CM Owner Owner A/E Design Department Construction Department Prime Contractors Contractors Optional Own Force Work Subs Owner Builder Owner C.M. Prof Awad Hanna

Estimating Needs for Single Source Delivery Conceptual Design Assemblies cost data Update your estimate as the design develops Value engineering studies Prof Awad Hanna

Examples of Conceptual Design

Prof Awad Hanna

Prof Awad Hanna

Prof Awad Hanna

Prof Awad Hanna

Prof Awad Hanna

Value Engineering Ⓒ

Required Conceptual Design and Assembly Cost Data Example of assembly cost data Ⓒ

Design-Build Issues 1. Prequalification The reduction of the number of possible bidders to a small group of serious, qualified bidders improves the effectiveness of the selection process. Prof Awad Hanna

Design-Build Issues (cont.) 2. Proposal Evaluation Cost only Cost and time Multi-parameter (quality, safety…etc.) Prof Awad Hanna

Innovative Contracting Methods Multi-parameter Bidding (A+B+C) Multi-parameter bidding is a bidding system within the competitive bidding concept where successful bidder is selected based on the combined cost, time, and quality. Prof Awad Hanna

Example of Multi-parameter Bidding Lowest Cumulative Bid Cost Prof Awad Hanna

Design-Build Issues (cont.) 3. Legal a. Insurance and Bonding The contractor should have the proper insurance to cover design deficiencies or cover construction errors. b. Conflict of Interest Design-build eliminates the checks and balance of the traditional methods. Prof Awad Hanna

Innovative Contracting Methods (cont.) Construction Warranties (DBW) A warranty is a guarantee of the integrity of a guarantee of the integrity of a project and of the maker responsibility for the replacement or repair of deficiencies for a period longer than the traditional 1-year warranty. It is different than project maintenance warranties that provide routine maintenance Prof Awad Hanna

Summary of average differences between project delivery systems (CII-133) Ⓒ