Alfa-Omega Team General information General information (Anna) W Bellows (Alain) DN200 (Andrea) A.A.A. - TE-MSC-CMI Section meeting Feb 19th, 2013.

Slides:



Advertisements
Similar presentations
Thierry RENAGLIA / Ramon FOLCH FP420 Manchester Workshop December 2006 FP420 Connection Cryostat Mechanical Design & Construction Key capabilities of CERN.
Advertisements

LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013.
Modifying the interconnection thermal shields during LS1. Graeme Barlow - TE-MSC-CMI1.
February 2009 Summary of Chamonix 09 Steve Myers.
Aw Team - summary of LS1 activities CMI Section Meeting, 16th September 2014 Anna Chrul (HNINP/CERN)
QRL Leak Tests the story so far………. Paul Cruikshank on behalf of TE-VSC colleagues & AL4030 Consortium (S133) 1 Paul Cruikshank TE/VSC - QRL Leak Tests.
Discussion. Help Needed for Splice Consolidation Opening and closing W (20 FTE’s) Repair, reinstall and tack PIM’s (2) Orbital machining of M sleeves.
Status of SMACC-QA 1.Recently resolved issues 2.Update from QC teams 3.Statistics S56 and S67 4.Auditors findings 5.4th Splice Review – 22/24 July Ranko.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
Alfa-Omega Team Coordination LS1 Collaboration Seminar, 27 th November 2014 Anna Chrul, IFJ PAN Kraków.
Current Safety Status Phase III Flight Safety Review 12 Jan 2009.
Session th January 2010 R.Schmidt TE/MPE Hardware Commissioning 2010 and beyond R.Schmidt.
Beam Vacuum Quality Control Outline  VSC consolidation  VSC support  Organization  Status Cédric Garion on behalf of TE-VSC Cédric Garion TE/VSC Beam.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
M. Karppinen TE-MSC-ML on behalf of S. Atieh, P. Cruikshank, M. Duret, J-C. Perez, V. Parma, T. Renaglia, S107, S108, Dubna teams Pressure relief valve.
Technology Department 1 Visit to Hall 180: Presentation of the consolidation process Third LHC Splice Review, November 12, 2012.
R.Schmidt TE-MPE-PE: members of the section Michael Jonker Mike Koratzinos Rüdiger Schmidt Daniel Wollmann – from 1 st November 2011 Arjan Verweij Carlos.
ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.
EPPOG - LHC Machine LHC machine (and some outreach) Mike Lamont.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project … Courtesy ….
Special interventions Status of production and QC Nicolas Bourcey TE-MSC-MDT Fourth LHC Splice Review November 2013.
MPE Workshop for LS1 / 22 & 23 Nov. 2012, G. D’Angelo TE/MPE-EE ELQA during LS1 train, Special measurements and NCs Magnet replacement: AIV Splices consolidations:
Work Organisation for Splice Consolidation Francesco Bertinelli 20 minutes presentation, 10 minutes discussion: 12 slides First LHC Splice Review, CERN,
Injectors & LHC report K. Foraz on behalf of OSS members 01/11/13LSC - EN-MEF-OSS1.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project.
Can we change a magnet without warming-up a full arc ? Serge Claudet, With help from P. Cruikshank & J-P. Tock (Chamonix Jan’10)
Quality Assurance Overview Ranko Ostojic 12 Nov 2012.
D. Delikaris, TE-CRG, LSC 25th Meeting Page 2 October 18 th, 2013 LS1 Committee (LSC)- 25 th Meeting D. Delikaris, TE-CRG Cryogenics activities.
TE-CRG Activities D. Delikaris, TE-CRG.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 30/08/2013LSC - S. Baird, M. Bernardini1.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project.
A. Perin, TE/CRG, DFBA LSC Page 2 LHC Long Shutdown 1 Committee June 14 th, 2013 A. Perin (TE-CRG) On behalf of the DFBA splices consolidation.
Proposed integration of cryo BLMs in LHC during LS1 V.Parma, CERN, TE-MSC With contributions/input from: M.Sapinski (BE-BI) Th.Renaglia (EN-MME) N.Bourcey.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
LMC 1 (Pre Chamonix) DN200 relief valve position DN200 relief valve position On top wherever possible. Open W bellows for MLI protection. On top wherever.
LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.
Workshop on cryogenic & vacuum sectorisation of the SPL Vacuum Sectorisation Paul Cruikshank, CERN Technology Department (TE) Vacuum Surfaces & Coatings.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
L. Tavian, TE/CRG, LSC Page 2 February 21 th, 2014 LS1 Committee (LSC) L. Tavian TE-CRG.
LHC experience with installation Katy Foraz March 6th 2008, Dubna GDE Meeting - ILC Conventional Facilities and Siting Workshop ***********************************
Third LHC Splices Review SMACC Organisation Scope of work (What’s new since Nov 2011) Organization chart update Human resources Budget Unforeseen? Unexpected?
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
LHC intervention scheduling with the Work Acceptance Tool
ALICE 5 o’clock meeting Wk 51.
Framework Schedule from EYETS 2016 to LS2
Roadmap for triplet cryostats
SMACC Tenth report [15 min] 13/09/2013
ELQA Electrical Quality Assurance
LHC schedule.
Safety in Construction and Upgrade Phases
HSE rules & regulations
The LHC - Status Is COLD Is almost fully commissioned
Long Shutdown for the LHC: Vacuum Beam Pipes
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
Reinforcement of the LHC Dipole Diodes Insulation during LS2
SPS Planning for the EYETS Meeting 8 (07/12/2016)
Renovation of the 45-year old PS magnets
International Review of the Conceptual Design of the Cold Powering system for the HL-LHC Superconducting Magnets J.Ph. Tock
LS2 session J.M Jimenez, J.-P. Tock, K. Foraz 24/11/2017
The situation for the coated magnets and what we learned in the LS1 installation: M.Taborelli, for TE-VSC.
K. Foraz on behalf of OSS members
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Q1-Q2, Q2-Q3 Interconnect Zone Disconnection Q1 Magnet Extraction
Closing of sector 7/8 Interconnections of LHC cryomagnets
Re-Installation (days)
Presentation transcript:

Alfa-Omega Team General information General information (Anna) W Bellows (Alain) DN200 (Andrea) A.A.A. - TE-MSC-CMI Section meeting Feb 19th, 2013

Long Shutdown 1 (LS1) To upgrade the LHC and prepare machine for work with full energy (VAC, CRYO, RF,…) Powering Tests Consolidation of the Superconducting Circuits Replacement of non-conform cryomagnets Radiation to Electronics (R2E) For experiments – time to upgrade detectors And many other projects… Timeframe: February 2013 – December 2014 A.A.A. - TE-MSC-CMI Section meeting Feb 19th, 2013

SMACC Project Superconducting Magnets And Circuits Consolidation is one of the main projects and activities to perform during LS1. Courtesy J.Ph. Tock A.A.A. - TE-MSC-CMI Section meeting Feb 19th, 2013

The schedule of LS1 K. Foraz, Third LHC Splice Review, November 12-14, 2012 A.A.A. - TE-MSC-CMI Section meeting Feb 19th, 2013

Alfa & Omega Team Our tasks: To open all W-bellows starting The Train To close all W-bellows completing The Train To install all missing SRV (DN200) To upgrade all thermal screens To remove, repair and reinstall M bellows protections To install V-bellows and X-bellows protections To support Special Interventions Team and VSC (leak detection) Some numbers: 612 SRV (DN200) to install in 4 sectors 1695 Interconnections to open/close (+ some extra…) 3390 Thermal Shields to modify in the workshop Bat M bellows protections to remove – repair – install Preparation period: visits, procedures, ECR, videos, orders, equipment... Second phase (now!): training on surface A.A.A. - TE-MSC-CMI Section meeting Feb 19th, \\cern.ch\dfs\Workspaces\a\AlfaOmega\Media\CERN clips

Andrea Musso (Anna Chrul, HNINP) Jose Manuel Gomes De Faria SRV Activity Leader DUBNA Aleksander Ivanov Team 1 March 15 th 2013 Team 2 March 15 th 2013 Alain Bastard W Opening & Closure Activity Leader NTUA Dimitrios Damianoglou (Konstantinos Razakias) Team 1 March 1 st 2013 Team 2 March 1 st 2013 Team 3 March 1 st 2013 WUT Michal Strychalski (Jacek Muszynski) Team 1 March 15 th 2013 Team 2 March 15 th 2013 Team3 March 15 th 2013 Graeme Barlow Thermal Shields Upgrade Activity Leader Adel Tebigui (FSU) Benjamin Pellet (FSU) Alfa & Omega Team International Team: 36 team members from 7 countries, 7 languages and a huge work to do! A.A.A. - TE-MSC-CMI Section meeting Feb 19th, 2013

W-bellows opening Remove screws Open bellows Remove MLI blankets 1 Welds to cut Remove thermal shields Remove MLI blankets 2 Remove shield (screwed) Courtesy Thierry Renaglia A.A.A. - TE-MSC-CMI Section meeting Feb 19th, 2013

Machine de découpe des écrans thermiques: Les contraintes que nous avions a respecter Pas de poussières ni détincelles Réduction des nuisances sonores Sécurité pour les utilisateurs de machine Rapidité Qualité A.A.A. - TE-MSC-CMI Section meeting Feb 19th, 2013

Installation of Safety Relief Devices (DN200) 1/2 This activity was partially performed during last shutdown ( ) There are 612 SRV left for installation in 4 sectors: – Sector 2-3 – Sector 4-5 (partially) – Sector 7-8 – Sector 8-1 Nota: a partial opening of the interconnection (i.e. W opening and MLI removal) is requested to install the SRDs A.A.A. - TE-MSC-CMI Section meeting Feb 19th, 2013

Installation of Safety Relief Devices (DN200) 2/2 A.A.A. - TE-MSC-CMI Section meeting Feb 19th, 2013