Status of FAIR D. Krämer Dec. 1&2, 2010 – 4th MAC Meeting 1.

Slides:



Advertisements
Similar presentations
FAIR Status Report Hans Ströher NuPECC-Meeting Cracow June 9, 2006.
Advertisements

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Preparation of FAIR EU FP7 preparatory phase proposals J. Eschke, FAIR.
1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
FIDIC/ MDB Harmonised Construction Contract Conference S8: Social issues in contracts – labour and health RA Ulrich Paetzold Director General F I E C European.
FAIR GmbH and FAIR Project History, Status and Outlook
Introduction 1 Proposal for the structure of FAIR GmbH construction phase 2 Relationship between FAIR GmbH and GSI mbH construction phase Contract Site.
The Facility for Antiproton and Ion Research in Europe Günther RosnerNuPECC, Sevilla, 5/10/121.
Helmholtz Centre for Ion Research D. Krämer, 2nd Lab Directors Meeting, Protvino, January 15-16, 2008 Design and Engineering Issues; Standardization and.
Status of FAIR Yuri Zaitsev (ITEP) Physics of Compressed Baryonic Matter 1-st CBM-Russia-JINR Collaboration Matter May 19-22, 2009, Dubna, Russia.
Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
Kaname Ikeda, October Status of the ITER Project Status of the ITER Project Kaname Ikeda ITER Nominee Director-General October 2006.
The new FAIR accelerator complex at GSI: Project, Challenges, First steps Ralph C. Bär ICALEPCS, 16. October 2007.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
FAIR – Facility for Antiproton and Ion Research Austria China Finnland France Germany Greece India Italy Poland Slovenia Spain Sweden Romania Russia UK.
2 February 2009Ö. Skeppstedt1 FLAIR Collaboration Meeting 2–3 February 2009 Manne Siegbahn Laboratory, Stockholm FAIR status from the AFI chairman point.
FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Welcome to FAIR RF Review for TAC Meeting in June 2007.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Thailand’s Preparation for Starting a Nuclear Power Program Mr. Pricha Karasuddhi Technical Advisor Nuclear Power Program Development Office(NPPDO) Ministry.
EGEE is a project funded by the European Union under contract IST Collaboration Board F.Gagliardi Project Director Cork Conference, 20 th April.
Status of QUACO project
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2,
Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR NuPECC Sweden FranceIndia Finland GermanyPoland.
Oct. 16, 20081CBM Collaboration Meeting, Dubna, Zbigniew Majka FAIR project status  Establishment of the FAIR GmbH  Accelerator construction  Civil.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
European Spallation Source Overview and Status Technical Advisory Committee 1-2 April 2015 James H. Yeck ESS CEO & Director General
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
Ministry of Finance Compliance assessment of the management and control systems of the managing authorities under the Operational programmes. Conclusions.
O. Kester, NuSTAR annual meeting, 27/02/2013
Delivery of FAIR In-kind items (feedback from India) Subhasis Chattopadhyay VECC-Kolkata & BI-Kolkata.
Progress Report Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/121.
Inti Lehmann Facility for Antiproton and Ion Research Darmstadt, Germany PANDA Collaboration, Giessen – 18 March 2014 Status and News from FAIR.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
O. Kester, 6 th MAC meeting, Darmstadt, 10/10/2011 FAIR ACC planning and schedule O. Kester 6th FAIR - Machine Advisory Committee Meeting
CBM Timeline Walter F.J. Müller, FAIR, Darmstadt
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
Status of the FAIR Project
AMICI WP1 – Management, coordination and dissemination
High energy beam transport.
Agenda Item 2: Catch up session 15 May 2017
ESS Innovation Procurement Workshop
Oleksiy Dolinskyy December 1st, 2014
Status of HESR 18th March Gießen Dieter Prasuhn.
Status of LEB J. Gerl GSI – Darmstadt, Germany NUSTAR Week 2011
WP1 - Consortium coordination and management
In-Kind FAIR David Urner FAIR, Darmstadt , D. Urner.
BUYING QUALITY PRIVATE SECURITY SERVICES
(Procurement, testing of magnets)
Ways to industry participation in CLIC 24th October, 2017
Enterprise Content Management Owners Representative Contract Approval
Guidance notes for Project Manager
EU Reference Centres for Animal Welfare
Eagle Programme : 4 Box Summary
Regulatory Cooperation Forum (RCF) - Plenary 2018
Delivery of Solutions Information Management
EST102: 12th Feb to 9th Mar 2018: Negotiation of contract Ts&Cs
ESS Project Status Roland Garoby – Technical Director August 2018.
SOCIAL DIALOGUE WITHIN THE SCOPE OF EUPAN
A High Intensity Neutrino Oscillation Facility in Europe
Welcome and charge to the committee
Executive Project Kickoff
Project Kick-off <Customer Name> <Project Name>
Presentation transcript:

Status of FAIR D. Krämer Dec. 1&2, 2010 – 4th MAC Meeting 1

Contents FAIR Convention signed FAIR GmbH founded FAIR Governance Organization Chart FAIR GmbH Funding Situation In Kind Contracts Managing the ACC Project Status of Site & Buildings

Signing the Convention and Founding FAIR GmbH 4 October 2010 at Biebrich Castle

After Council Party

Partners Signing the Convention Shareholders of FAIR GmbH: Preparing to join in:

The FAIR Governance Structure Council Admin. Finance Committee Science Council In Kind Review Board MAC MAC reports ALSO to Council FAIR Managing Board Managing Directors Technical Director Research Director Director Site & Buildings Administration

Organisational Chart of FAIR GmbH Weekly management board meetings Council B. Sharkov S. Richter Managing Directors B. Sharkov (Chairman), S. Richter Director‘s Office Council Matters Office Legal Advisor 3rd Party Funding Officer Research Director acting B. Sharkov Director for Site & Buildings acting D. Krämer Technical Director D. Krämer Technical Follow-up In-kind coordination Acc-Liason Project Office Administration Controlling and Ressource Planning Finances

Technical Division Recruitments FAIR Head Technical Follow Up Search for additional candidates necessary; interviews in December scheduled FAIR Head In-Kind Coordination Interviews on November 16, 2010 (negotiations started) 2 Assistants Technical Follow Up Selection Committee meeting in Nov. 2010 interviews scheduled for December 2 Assistants In Kind Coordinator

FAIR Site & Buildings Recruitments FAIR Head Site & Buildings Interviews on October 28 (negotiations started) Architect Selection Committee meeting in Dec. 2010 Civil Engineer

Research Division Recruitments Research Director to by approved by Council (7 Dec. 2010) nominations by the collaborations started for (4) Technical Coordinators (4) Resource Coordinators

FAIR Costing Issues Confirmed Accelerator costs defined by Costbook (CB) V 5.0 as of price basis 2005 In total 382 M€ Experiment baseline experiment funding: 78 M€ Civil Construction cash contributions to civil construction (400 M€) + add. Site dep. costs 75 % Germany, 25 % other FAIR Member States Site dependent cost 95 M€ (2/3 BMBF, 1/3 Hessen) Personnel accelerator coordination personnel accounted for in Costbook (1440 FTE) over construction period 400 FTE for FAIR GmbH over 8 years period + personnel for site & buildings In total equivalent to150 M€ (German in kind contribution) & FAIR GmbH running cost 17 M€

FAIR In-Kind Contribution Rules For an in-kind contribution the amount to be taken into account as a part of the total contribution by a Shareholder to the construction costs (as recorded in the Convention), associated with items to be delivered under the contract with the Shareholder, shall be based on the price 1st of January 2005 of such items as established in the latest version of the cost book. Any price variations of these items are the joint risk of the Contracting Party and the Shareholder, subject to the conditions specified in the Technical Documents 5 to the Convention.

FAIR Cash Contribution Rules For a cash contribution the amount to be taken into account as a part of the total contribution by a Shareholder to the construction costs (as recorded in the Convention) shall be subject to indexation with reference to 1st of January 2005, using the annual EU inflation index for industrial manufactured goods (EUROSTAT). In practical terms such cash contribution shall be accordingly adjusted at the time of payment.

Commitments of Contracting Parties in the FAIR Project Contracting Party Contribution [M€] Finland 5.00 French Republic 27.00 Federal Republic of Germany 705.00 Republic of India 36.00 Republic of Poland 23.74 Romania 11.87 Russian Federation 178.05 Republic of Slovenia 12.00 Kingdom of Sweden 10.00 Total 1.008,66 All numbers at price level 2005! Spain expected to join soon (11.87 M€) China and UK want to contribute to experiments (6.6 M€) Project costs (1027 M€)

Cost to Completion Sum: 1457 all values in M€

Roles and Responsibilities in the Project FAIR is owner of the project and is responsible for the successful design, construction, commissioning and operation of the FAIR facility. FAIR controls the strategy, the policy and the implementation of the project, and draws up and executes its scientific programme. FAIR recognises the expertise of GSI in the field of heavy ion accelerators and GSI’s proven practice of close international collaboration with other research organizations in the construction of particle accelerators. Therefore, FAIR and GSI enter into a close collaboration in the construction, the commissioning and the operation of the FAIR facility. FAIR shall act as the principal, and GSI shall act as an agent with operative tasks.

FAIR-GSI Contract Structure

GSI in-kind contribution: Technical Follow-up GSI staff will contribute to FAIR share relevant through the technical follow-up of the FAIR accelerator components compiling specs and standards follow-up of in-kind contributions follow-up of procured components monitoring, controlling of Milestones and Deliverables monitoring, controlling of installations monitoring, controlling of commissioning w/o beam S. Richter

Focus on In-Kind Contract and Specifications A set of specifications describes the contractual framework, the functional requirements, the shipping and assembly definitions and the acceptance criteria. The set of specifications is based on the FAIR Convention and the Tech. Doc. 4 Contract Contractual and legal conditions for each In-Kind Contribution General Specifications (GS) Technical Specifications and requirements which are valid for all FAIR accelerators. Common Specifications (CS) Technical Specifications and requirements which are valid for a Technical System (like Common Remarks for RF Systems, Common Remarks for Magnets, Normal Conducting) Functional Specifications (EF) Detailed and individual specifications and requirements for each Accelerator Attachments, related documents Contract GS Common Speci-fications Functional Specifications Attached and related documents like TDRs, Parameter Lists, Standards, AGBs etc.

The AAB – Managing the ACC Subproject All Accelerator Board Kick Off Meeting on Dec. 7, 2010

Next Steps Meeting with Polish cryo-experts scheduled for December Meeting with Indian experts scheduled for January 2011 Technical Specifications to the In Kind Contracts under preparation (First IKRB meeting on Feb 10, 2011) Preparation for procurement of non-in-kind components (S-FRS, SIS100) in 2011 (long term deliveries)

Scope of the Modularized Start Version FAIR is composed from weakly linked individual building blocks Year Modularized Start Version

Modularized Start Version Module 0: SIS100 and connection to existing GSI injector APPA Module 4: low energy RIB and Module 1: Experimental areas (CBM) Module 5: RESR storage ring Module 2: Super-FRS Module 3: High-energy antiprotons (p-linac, pbar-target, CR, HESR) Module >5: NESR, FLAIR, SIS300, ER ..

Planning Documents for Scrutinizing by hbm and 40 folders more for the MSV 120 folders for scrutinizing handed to hbm Sept. 22, 2009 and textures (documents for MSV) end April 2010 August 30, 2010 „Baufachliche Stellungnahme“ to OFD →BMBF&BMVBS November 8, 2010 BMBF states „Kostenobergrenze“ for Site & Buildings: 572 M€ (MSV = 61800 sqm „NF“), 722 M€ (full FAIR buildings = 83272 sqm „NF“).

Site and Buildings Kick Off 2nd Planning Phase (Sept. 22nd 2010) Meetings with users to: - finalize details of buildings - include details of media transport in the buildings (quite some delay as input data are in-complete) Target: Application for Buildings Permit in May 2011 In parallel: Application to Radiation Safety Authority Establishment of Change Management System Goal & Milestone: December 2011 - Begin of site preparation (tree cutting, etc...)

Finalize 3D Modeling

Check Injection and Extraction Building at SIS100/300 Goal: get documents which are ready for approval and are basis for detailed planning in 2011.

Masterplan Modules 0-3

Road Map FAIR Site & Buildings 2009 2010 2011 2012 2013 2014 2015 2016 2017 1 2 3 4 5 6 7 8 9 10 1 Handing in of preplanning documents to hbm (FAIR full version) Clarification of user requirements Modularized Start Version (MSV) Start revised preplanning for MSV Approval of revised planning for MSV Preparation of documents for building permit Expected approval for (partial) building permit Start site preparation (clearing trees) Award contracts on civil construction work lot 1 … n Completion of civil construction work lot 1 … n Start installation of accelerators and detectors 2 3 4 5 6 7 8 9 10

FAIR – Facility for Antiproton and Ion Research Start of first experiments in 2017/2018

Focus of the Meeting the Working Horse of the Facility