Discovery Across Texas: Technology Solutions for Wind Integration in ERCOT Using Synchrophasor Technology for Wind Integration and Event Monitoring in.

Slides:



Advertisements
Similar presentations
WISP RFI for Applications response summary
Advertisements

Using Synchrophasors for Preventing Cascading Outages
Milton Holloway, Ph.D. President & COO Center for the Commercialization of Electric Technologies Synchrophasor Developments for the ERCOT Grid A Cooperative.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
Marianna Vaiman, V&R Energy
and Trend for Smart Grid
Frankfurt (Germany), 6-9 June 2011 Douglas Wilson Psymetrix Ltd, UK Douglas Wilson Psymetrix Ltd, UK D. Wilson – UK – Session 4 – Paper ID 0497 Connection.
Smart Grid Applications: Viewpoint of an Electrical Power Engineer Francisco de Leon October 2010.
© Electric Power Group All rights reserved. W IND F ARM O SCILLATION D ETECTION AND M ITIGATION WECC Joint Synchronized Information Subcommittee.
1 1 Office of Science Lawrence Berkeley National Laboratory Distribution µ PMU Applications Joe Eto Emma Stewart
Introduction to Phasor Measurements Units (PMUs)
Update to AABE on DOE Smart Grid Investment Grants and Smart Grid Regional Demonstrations Christopher Irwin Smart Grid Standards and Interoperability Coordinator.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
“Discovery Across Texas” New Technology Solutions for Wind Integration in ERCOT Synchrophasor Project Status Update Bill Muston Oncor Electric Delivery.
Small Signal Stability Analysis Study: study prepared by Powertech Labs Inc. for ERCOT Vance Beauregard AEP 9 April 2002.
Review of BPA Voltage Control Conference
THE TRES AMIGAS SUPERSTATION Southwest Renewable Energy Conference Santa Fe, NMSeptember 16 th 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
Texas Phasor Project ERCOT Reliability and Operations Subcommittee (ROS) February 12, 2009 Milt Holloway, Center for the Commercialization of Electric.
“Discovery Across Texas” A CCET Smart Grid Demonstration Project Providing New Technology Solutions for Wind Integration in ERCOT Presented to Southwest.
21 st May 2015 SMARTGREENS 2015 Lisbon, Portugal Lane Department of Computer Science and Electrical Engineering West Virginia University Analyzing Multi-Microgrid.
Synchrophasor Measurement Implementation in ERCOT
© 2011 New York Independent System Operator, Inc. All Rights Reserved. Smart Grid Investment Grant Project Update Jim McNierney Enterprise Architect New.
© New York Independent System Operator, Inc. All Rights Reserved. Michael Swider Manager – Research & Development New York Independent System.
Synchrophasor: Implementation,Testing & Operational Experience
WECC Load Model Sensitivity Study “ An Analysis of the Sensitivity of WECC Grid Planning Models to Assumptions Regarding the Composition of Loads ” Task.
Lessons Learned from the Texas Synchrophasor Network by Presented at the North American Synchrophasor Initiative (NASPI) Meeting Toronto, Ontario Thursday,
VISUALIZATION WHY WE NEED SYNCHROPHASOR TECHNOLOGY IN OPERATIONS John Ballance – EPG Presented to ERCOT Phasor Technology Workshop – November 16, 2012.
Page 0 Eastern Interconnection Phasor Demonstration Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management Transmission.
V&R Energy’s Project under PRSP: Grid Operator’s Monitoring & Control Assistant (GOMCA) Marianna Vaiman, V&R Energy JSIS Meeting.
1 Application of Synchrophasor Technology To CREZ System CREZ Technical Conference January 26, 2010 Navin Bhatt American Electric Power.
CASE STUDY Disturbance event comparing PMU and SE voltage angle difference in ERCOT Prakash Shrestha Operations Engineer Advanced Network Application.
Clemson University Electric Power Research Association CHANDANA BOMMAREDDY CLEMSON UNIVERSITY DG VOLTAGE CONTROL IN AN ISLANDING MODE OF OPERATION.
Real Time Tools Outreach Carlos Martinez January 27-29, 2004 Washington, D.C. Transmission Reliability Research Review.
November 16, 2012 Synchrophasor Meeting Dynamic Model Validation Project Jonathan Rose Engineer, Resource Integration Sidharth Rajagopalan Engineer, Dynamic.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
SMART GRID A smart grid for intelligent energy use. By: Suhani Gupta.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
Document number Anticipated Impacts for FRRS Pilot Program ERCOT TAC Meeting September 7, 2012.
ERCOT DYNAMICS WORKING GROUP Report to ROS August 16, 2007 Vance Beauregard, American Electric Power.
SEMINAR PRESENATATION ON WIDEAREA BLACKOUT (AN ELECTRICAL DISASTER) BY:Madhusmita Mohanty Electrical Engineering 7TH Semester Regd No
Workshop February 4, Idaho Power Smart Grid Vision At Idaho Power, our smart grid vision remains focused on seven major characteristics : 1.Enhance.
| Electric Power Group Presents Maximizing Use of Synchrophasor Technology for Everyday Tasks Welcome! The meeting will begin at 2:00 p.m. EDT / 11:00.
MISO – Synchrophasor GPA Users Forum Sept 7th, 2011.
2017 WECC JSIS Report March 21, 2017.
NERC: Essential Reliability Services
ISO-NE Synchrophasor Related Projects
Webinar Series Kickoff
Transmission Planning in ERCOT- Overview
Black Start Overview.
IG BASED WINDFARMS USING STATCOM
PSCAD models.
Control Schemes for Distribution Grids with Mass Distributed Generation AUTHOR: UMAIR SHAHZAD.
A Future Oriented Data Platform for the Electric Power Grids
CCET Discovery Across Texas Data Quality Plan - Overview
PMU Emulator for Power System Dynamics Simulators
Texas Synchrophasor Network Data Validation and Mining
Grid Integration of Intermittent Resources
The Transition to a High DER Future
Transmission and Sub-Transmission Network India – Present and Future Rajesh Suri GE (T&D) India Ltd 8 November 2018.
POWER SYSTEM ANALYSIS INTRODUCTION.
Peak’s Synchronized Measurements and Advanced Real-time Tools (SMART) Working Group (initiated in Oct-2017) Focus on operationalizing Synchrophasor tools.
Electric Power Group Presents Maximizing Use of Synchrophasor Technology for Everyday Tasks Welcome! The meeting will begin at 2:00 p.m. EDT / 11:00.
Jignesh Solanki Research Assistant Professor West Virginia University
NASPI PMU Data Application Classification
2500 R Midtown Sacramento Municipal Utility District
Wind Farm Oscillation Detection and Mitigation
2017 WECC JSIS Report March 21, 2017.
WISP Follow on Reporting.
NASPI PMU Data Application Classification
WECC Joint Synchronized Information Subcommittee
Presentation transcript:

Discovery Across Texas: Technology Solutions for Wind Integration in ERCOT Using Synchrophasor Technology for Wind Integration and Event Monitoring in ERCOT Events Captured and Findings To Date John Ballance and Abhijeet Agarwal – EPG John Adams and Jian Chen – ERCOT NASPI Meeting, February 23, 2011 Ft. Worth, Texas

DOE Smart Grid Demonstration Project Awarded to CCET - Texas 501(c)6 non-profit formed in 2005 CCET Members and Mission: 21 corporate members and 5 university cooperators. Mission - enhance the safety, reliability, security, and efficiency of the Texas electric transmission and distribution system through research, development and commercialization of emerging technologies (http://www.electrictechnologycenter.com) Awarded Jan 4, 2010: DE-OE-0000194; Value $27 million (DOE 50%); 17 participants; 3 Components – Synchrophasors, Smart Meter Texas Portal, and Smart Grid Community of the Future; 3 phases – Planning, Design, Demonstration Title: Discovery Across Texas: Technology Solutions for Wind Integration in ERCOT Goal: Demonstrate a synergistic approach to managing fluctuations in wind power (currently 8GW increasing to 18GW) in the ERCOT transmission grid through better system monitoring capabilities, enhanced operator visualization, and improved load management Synchrophasor Project Participants: ERCOT, TOs, Electric Power Group – Lead for Synchrophasor portion of the project 2/23/2011 Page 2

Discovery Across Texas: Technology Solutions for Wind Integration in ERCOT Synchrophasor Project Build on Current ERCOT Network started in Fall 2008 with 3 AEP PMUs Currently 14 PMU’s installed at 12 TO locations, and at ERCOT ePDCTM for data synchronization, RTDMS® for visualization, and PGDATM for off-line analysis Expanding to 23 PMUs, provide TOs access to RTDMS visualization applications Participating TOs and commitments AEP TEXAS - 6 new PMUs ONCOR - 4 new PMUs Sharyland Utilities - 3 new PMUs, 1 PDC ® Electric Power Group. Built upon GRID-3P platform, U.S. Patent 7,233,843. All rights reserved  2/23/2011 Page 3

Discovery Across Texas: Technology Solutions for Wind Integration in ERCOT Synchrophasor Project Goals Enable ERCOT to better manage the transmission grid to accommodate very large quantities of wind generation Establish and maintain a reliable synchrophasor network to provide real time dynamic information on wind resources and their impact on the transmission grid Use synchrophasor measurements to identify precursor conditions to undesirable grid performance and behavior Identify changes in operating procedures or actions to facilitate integration of intermittent resources, hence improving grid reliability Utilize synchrophasor measurements to recalibrate engineering models 2/23/2011 Page 4

ERCOT Phasor Network (14 PMUs at 12 Locations) (9 PMUs) 2/23/2011 Page 5

ERCOT Phasor System with RTDMS Real Time Dynamics Monitoring System (RTDMS) ePDC x 2 7 RTDMS Server & Database Phasor Grid Dynamics Analyzer (PGDA) enhanced Phasor Data Concentrator (ePDC) 2/23/2011 Page 6

Applications of PGDA Event and Disturbance Analysis Quickly determine the causes and effects of power system events like generation and line trips Dynamic Model Validation Verify and refine/re-calibrate dynamic models used in power system simulations to aid in planning and engineering studies Baselining Analysis Examine long-term system performance and establish reliable ranges for voltage, frequency, and other system metrics Dynamic Stability Assessment Evaluate the ability of a power system to withstand and respond to disturbances by analyzing the characteristics of dangerous oscillations and calculating standard reliability metrics like frequency response 2/23/2011 Page 7 7

Use of PGDA for Off-Line Analysis AJO PMU Voltage Magnitude AJO PMU Voltage Angle AJO PMU Frequency 2/23/2011 Page 8

Analysis of Three Recent ERCOT Events 09/25/10 @ 20:37:30 – 545 MWs generation loss 11/03/10 @ 10:21:05 – 1444 MWs generation loss 12/11/10 @ 23:38:24 – 1085 MWs generation loss Analysis Approach: Capture Event Data from RTDMS Event File Utilize PGDA for Off-line analysis Select signals – frequency, voltage, power Analyze grid performance – frequency response, recovery time, voltages, modes 2/23/2011 Page 9

Three Events with Different Frequency Behavior All three events had very different frequency behavior and characteristics 2/23/2011 Page 10

11/13/10 Event Shows Secondary Oscillation The second event indicated secondary oscillations during the dip 2/23/2011 Page 11

Voltage Response - 9/25/10 Event Voltage dips are small and voltage recovers quickly 2/23/2011 Page 12

Dominant Oscillatory Mode - 9/25/10 Event Dominant mode at 0.58 Hz shows 11% damping. Dominant mode is west-south swing. Mode shape modeling matches the oscillation very well. 2/23/2011 Page 13

Analysis Summary Descriptor Event 1 Event 2 Event 3 Date 9/25/10 11/13/10 12/11/10 Time 20:37:30 10:21:05 23:38:24 Generation Loss 545 MW 1,444 MW 1,085 MW (3 trips) Load MW 40,510 MW 31,688 MW 29,389 MW Wind 0.2% 14.8% 16.7% Lowest Frequency 59.9 Hz 59.69Hz 59.75Hz Recovery Time 2min 25sec 3min 57sec Not in range Voltage Drop Small Moderate Moderate Frequency Response 482.3 MW/.1Hz 596.7 MW/.1Hz 597.8 MW/.1Hz Oscillation Modes 0.58Hz 0.68Hz 0.71Hz 0.68Hz 0.69Hz Damping 11% 3.36% >8.5% 2/23/2011 Page 14

Observations and Conclusions Early events with relatively low wind generation levels are building our data base Inter-area oscillation is observed in analyzed results from recorded PMU data The observed oscillation modes are close to ERCOT annual planning study results Need to analyze the frequency response of events in real time to validate the frequency bias Grid performance after similar events is different – need to develop a better understanding of drivers of grid dynamics Need to monitor dynamic voltage response Voltage monitoring can identify secondary events (e.g. 12/11/10 event) 2/23/2011 Page 15

Back-Up

Oscillation Modes in ERCOT Annual Planning Study Two major system oscillation modes (West-Northeast and West-Houston/Corpus Christi) were identified in ERCOT planning study.

12/11/10 Event Voltage Response Voltage dips are moderate (0.006 pu), but voltage plots identify subsequent generation trips 823 MW tripped 155 MW CT/ST tripped 107 MW tripped 18