“AGUAYTÍA – PUCALLPA 138 kV ELECTRIC TRANSMISSION LINE

Slides:



Advertisements
Similar presentations
Public Private Partnership Investment and Construction Armando R. Araujo Cairo 2003.
Advertisements

Monitoring and tender procedures for infrastructure projects Baltic Retreat 2013 Federal Department of Foreign Affairs FDFA Swiss Agency for Development.
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
STANDARD BIDDING DOCUMENT PROCUREMENT OF GOODS (FOR VALUE UP TO NU.0.25 MILLION) Presentation by: Tshewang Gyeltshen.
Public Procurement in Macedonia Achievements in 2011.
GPA Renewable Energy Resource for Guam Power Authority
Open Procurement Process Gauteng Provincial Treasury Process Mapping 30 th October 2014.
Bidding Requirements ACT 380. Objective Provide an overview of the bidding process, including documents included in the bidding requirements.
Bureau of Bond Finance Issuing the Bonds BUILT BY BONDS.
Lima - Perú. Huanuco Pucallpa Tingo María 3 Huancayo 2 Dv Cerro de Pasco La Oroya Pte Ricardo Palma Ramiro Prialé 1  Section 1:Ramiro Prialé - Bridge.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Procurement Procedure and Preparation of Procurement Plan with reference to Karnataka.
U.S. Small Business Administration
JSC “Moscow United Electric Grid Company” (JSC “MOESK”) Operating activity’s results for the first half year of 2010.
Turkish Power System Overview March 2012
Business Plan OVHL MAINTENANCE by Nedeljko Drakul.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Lithuanian interconnection projects Donatas Matelionis LITGRID AB
The GSA Leasing Process. The Two Golden Rules for GSA Leases: Don't contact GSA! Don't contact the lessor! DO Contact your RPMD (GSA) realty specialist!
1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.
Los Angeles Unified School District Facilities Services Division Small Business Enterprise (SBE) Policy & Program.
HNSciCloud Pre-Commercial Procurement Project Procurement Framework and Schedule Dante Gregorio CERN 26 January
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
Public Tender for Comprehensive Project to award GTS Project in concession “AGUAYTÍA – PUCALLPA 138 kV ELECTRIC TRANSMISSION LINE (circuit two)” GTS: Guaranteed.
Power Transmission Rehabilitation Project TERMS AND CONDITIONS OF INVESTMENT FUNDS “High Voltage Electric Networks” CJSC (HVEN CJSC) is implementing.
BIDDER’S CONFERENCE: Eskom Grid Connection Process and related matters Date: 16 August 2012.
CONVEYOR IDLERS CORP 3340 Financial Requirements Presented by: Commercial Finance Date: Thurs 22 October 2015.
PROCUREMENT RULES FOR EXPERIMENTS AT CERN Dante Gregorio CERN Procurement Service.
Public – Private Partnership in Vietnam: A new approach Ho Chi Minh City – June 2010.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
PROPOSED CITY OF STOCKTON WATERFORD ESTATES EAST PHASE II ASSESSMENT DISTRICT PUBLIC HEARING Stockton City Council January 6, 2004.
Public Procurement Agency - Bulgaria
Minimum Set of Requirements for Suppliers
(State Initiatives and Unsolicited proposals projects)
Agenda TSOG 8th November
Unit 4: Utilizing Financial Documents
Minimum Set of Requirements for Suppliers
Next Step & Time plan Marcello Losasso, CERN
“Caucasus Power Transmission Network’’ (Armenia-Georgia overhead transmission line/substations) Loan Project.
Content of Tender Dossier - Instructions to Tenderers - Tenders
Loan Project of Construction of Iran-Armenia 400kV third power transmission line (“ Noravan’’ 400/220/20 kV) and related substation.
INTERNATIONAL PUBLIC TENDER:
Content of Tender Dossier Instructions to Tenderers
Request for Proposals For Banking Services CMU
Evaluation Grids Evaluation Grids.
TENDERING PROCEDURE IT-3981/EN
ENTREPRENEURSHIP Lecture No: 35 BY CH. SHAHZAD ANSAR
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
Ohio Capital Finance Corporation
Quality Management Systems – Requirements
Choice of Project Structure
Unit 5.1 Utilizing Financial Documents
Training on Dr. Sudhir Kumar Grid Connected Rooftop PV Systems
Design of Electric Power Systems and Utilities
Sales Process March 2017.
The Documents Necessary for Tendering a Project for Bids:
The Documents Necessary for Tendering a Project for Bids:
PROJECT DELIVERY METHODS
Purchasing in the 21st Century
Unit 4: Utilizing Financial Documents
How to Prepare a Quality Modification Request
Ch. 8 Utilizing Financial Documents
Fasset Briefing Session
Lecture was elaborated with the help of grant project of Ministry of Education, Youth and Sports, FRVŠ n „Innovation of Subject Financing of Building.
Provision of HR Services, UNOPS Nepal
IT-4464/EN Bidders conference
STARTING FUNDING YEAR (FY) 2020
Presentation transcript:

“AGUAYTÍA – PUCALLPA 138 kV ELECTRIC TRANSMISSION LINE Public Tender for Comprehensive Project to award GTS Project in concession “AGUAYTÍA – PUCALLPA 138 kV ELECTRIC TRANSMISSION LINE (circuit two)” GTS: Guaranteed Transmission System.

AGUAYTÍA – PUCALLPA 138 KV ELECTRIC TRANSMISSION LINE CALLED Concession to design, finance, build, operate and provide maintenance to an electricity transmission line measuring 132 km long, approximately and with a 75 MVA capacity. The aim is to strengthen supply to the Pucallpa Sub-station, which presently has trouble meeting the rising demand focused on this sub-station. Once this new circuit starts operating in parallel with the current one with the same capacity will provide a greater power transmission capacity and reliability in the power supply from Sub-station Pucallpa. Estimated investment (VAT not included): US$ 20.3 million Type of concession: Self-sustaining Concession period: 30 years plus the construction period (33 months) Estimated award date: Q I, 2017

AGUAYTÍA – PUCALLPA 138 KV ELECTRIC TRANSMISSION LINE PROJECT SUMMARY The main elements and project specifications are as follows: Specification details may be found in Annex 1 of the Concession Contract. The Aguaytía –Pucallpa 138 kV (circuit two) Transmission Line Aproximate Length : 132 km approximately Number of circuits : One Transmission Capacity 150 MVA Conductors per phase : Phase layout : Triangular Shield wire : One: OPGW. Support structures : Self-supported steel towers. Sub-stations connected : Aguaytía Sub-station – Pucallpa Sub-station Sub-stations  Expansions Aguaytía Sub-station– Ucayali Sub-station

AGUAYTÍA – PUCALLPA 138 KV ELECTRIC TRANSMISSION LINE TENDER: COMPETITION FACTOR Competition Factor: Lower cost for total service The Total Service cost includes: Yearly cost of investment with General Sales Tax excluded, calculated with a 12% rate and a 30-year period, plus. Yearly operation and maintenance costs excluding General Sales Tax(“CO&M ”). Bid application format: Disaggregated costs for the Electricity Transmission Line must be shown in forms 4-A and 4-B Only bids from bidders showing amounts and numbers for the Cost of Investment and the Cost of Operation and Maintenance (CO&M) that are same or lower the maximum figures established by Proinversion prior to the bid submission date, will be accepted. Additionally it is necessary to submit a Bid Bond for US$ 1.5 million.   In numbers (with two decimals) In letters 1) Cost of Investment (US$) * 2) Yearly O&M cost (US$) * Note: * Numbers and amounts calculated to the date of commercial start-up of the Transmission Line 4

AGUAYTÍA – PUCALLPA 138 KV ELECTRIC TRANSMISSION LINE TENDER: QUALIFICATION CRITERIA Investors must go through a qualification process to be considered bidders and submit an offer. The finance and operational qualification criteria are the following: In order to certify the technical requirements, bidders have to show certifications or technical statements from third parties. Whoever certifies technical experience may take part in the Tender with only one bidder. This impediment is also for its Related Companies. Legal: No legal impediments to sign contracts with the Peruvian Government. Do not participated with another Bidder in this Tender; others details in the Bidding Documents. REQUIREMENTS Finance: Minimum Net Worth US$ 30 million Minimum Total Assets US$ 90 million Technical: Direct operation or have operated directly in the last two (2) years, electric power systems that meet the following conditions: Length: No less than two hundred fifty kilometers (250 km.) in voltages of no less than or over 220 kV. Transformation capacity: No less than 250 MVA in substations with voltages of 220 kV or more. 5

Submission of Bids and Contract Award AGUAYTÍA – PUCALLPA 138 KV ELECTRIC TRANSMISSION LINE (second circuit) TENDER: SCHEDULE Main Schedule Dates: Call for bids Contract First Draft Contract Second Draft Qualification form Contract Final Draft Submission of Bids and Contract Award Closure II Quarter 2016 II Quarter 2016 II Quarter 2016 IV Quarter 2016 I Quarter 2017 II Quarter 2017 PROINVERSION has the authority to change the schedule dates. Should that happen, PROINVERSION will inform all interested parties posting said date changes in its Webpage and, at the same time, will send a letter to all concerned parties before the qualification stage, and to Bidders after that stage. 6

AGUAYTÍA – PUCALLPA 138 KV ELECTRIC TRANSMISSION LINE INFORMATION AND CONTACTS Project Manager for Electricity Transmission Matters Aníbal del Águila Acosta Telephone (51-1) 200-1200 annex 1340 E-mail adelaguila@proinversion.gob.pe whuambachano@proinversion.gob.pe 7