CBM Timeline Walter F.J. Müller, FAIR, Darmstadt

Slides:



Advertisements
Similar presentations
Introduction 1 Proposal for the structure of FAIR GmbH construction phase 2 Relationship between FAIR GmbH and GSI mbH construction phase Contract Site.
Advertisements

The Facility for Antiproton and Ion Research in Europe Günther RosnerNuPECC, Sevilla, 5/10/121.
Status of FAIR Yuri Zaitsev (ITEP) Physics of Compressed Baryonic Matter 1-st CBM-Russia-JINR Collaboration Matter May 19-22, 2009, Dubna, Russia.
Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Status of the FAIR project Visit in Wuhan,China November 23, 2006 J.
FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
CASS, Marsfield Phil Diamond 4 October 2011 SKA Pre-Construction Phase: Where we are, and what we’re trying to achieve ?
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
Oct. 16, 20081CBM Collaboration Meeting, Dubna, Zbigniew Majka FAIR project status  Establishment of the FAIR GmbH  Accelerator construction  Civil.
4 Construction Site today Construction Site – current Google Maps View 1Short Status of FAIR for NuPECC /KP.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
European Spallation Source Science Advisory Committee February 5-6, 2014 Jim Yeck CEO & Director General.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
Progress Report Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/121.
Status of FAIR D. Krämer Dec. 1&2, 2010 – 4th MAC Meeting 1.
The Status of the CBM Experiment
eTOF - status and plan CBM-STAR joint Workshop Outline Introduction
High energy beam transport.
Jan 2016 Solar Lunar Data.
Jefferson Lab Overview
Perspectives for Heavy-Ion Collisions at Future Facilities
Status of HESR 18th March Gießen Dieter Prasuhn.
IT Strategy Roadmap Template
Timeline Roadmap Template
In-Kind FAIR David Urner FAIR, Darmstadt , D. Urner.
News and brief overview of Beamline plans for the next few months
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
NA61 news and plans News from other labs/experiments
Going live? The highs and lows of getting a project into service
Appendix C New Administration General Assembly Session
Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun
Status of the CBM Experiment – Key Dates for CBM Magnet
Slice Test Planning Schedule(s) and Milestones.
Status report / Activity Plan of OBD Task Force
VLA to EVLA Transition Plan
This Presentation Pack is brought to you by
Irregularities in DoRIS
Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun
Preparation for WRC-07 A Status Report
Guidance on the new Pathway IT System for Mentors
FAIR – the Universe in the labororatory
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec ITEM 1 ITEM 2 ITEM 3
ESS Project Status Roland Garoby – Technical Director August 2018.
XRN Nov 19 Release - Status Update
Ciprian Plostinar Workshop on Testing and Commissioning
Irregularities in DoRIS
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
XRN Feb 19 Minor Release - Status Update
Imaging & Engineering STAP Meeting 12th-13th of April 2018
LCLS-II Cryoplant Controls Workshop.
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Welcome Update on ESS Construction Project
Text for section 1 1 Text for section 2 2 Text for section 3 3
CBM Project Walter F.J. Müller, FAIR, Darmstadt
IT Managed Services Transition Weekly Activity Report: May 28th, 2019
Port Back Data Collection & Transition
SNS-PPU upgrades the existing accelerator structure
Pilot of revised survey
FASER LS2 work coordination meeting
Presentation transcript:

CBM Timeline Walter F.J. Müller, FAIR, Darmstadt CBM-STAR joint Workshop 18 March 2017

CBM-STAR joint Workshop - Walter F.J. Müller, FAIR FAIR – Conceptual View SIS100/300 p-Linac SIS18 Compressed Baryonic Matter Anti-Proton Physics HESR Super Fragment-Separator: Nuclear Structure and Astrophysics Primary Beams 1012/s; 1.5 GeV/u; 238U28+ 1010/s 238U92+ up to 11 (35) GeV/u 3x1013/s 30 (90) GeV protons Secondary Beams FAIR phase 1 FAIR phase 2 radioactive beams up to 1.5 - 2 GeV/u; 1011 antiprotons 1.5 - 15 GeV/c CR 18 March 2017 CBM-STAR joint Workshop - Walter F.J. Müller, FAIR 2

GSI/FAIR Project Re-Organization GSI and FAIR were two separate organizations starting 2014 joint managing directors were appointed Nov 2014: Ursula Weyrich (Administrative) Feb 2016: Jörg Blaurock (Technical) Jan 2017: Paolo Guibellino (Scientific) in 2016 GSI/FAIR were re-organized GSI/FAIR is today one single organization. They are still two separate legal entities, but this is mostly relevant for lawyers and accountants, but otherwise not relevant anymore. The legal merger will come. 18 March 2017 CBM-STAR joint Workshop - Walter F.J. Müller, FAIR

GSI/FAIR Project Re-Organization The new joint GSI/FAIR organization, for a first time, provides proper communication paths between - civil construction - accelerator - experiments Some initial phases of civil construction were done - construction area cleared - foundation pillars build but stalled afterwards Civil construction is now back on track new construction manager: Uwe Kreische persons involved in CC are concentrated in one ‘task force’ 18 March 2017 CBM-STAR joint Workshop - Walter F.J. Müller, FAIR

FAIR – Many Engineer Years Later 18 March 2017 CBM-STAR joint Workshop - Walter F.J. Müller, FAIR

Tunnel for SIS100 and (later) SIS300(+) 18 March 2017 CBM-STAR joint Workshop - Walter F.J. Müller, FAIR

G014 – Home for CBM and HADES 18 March 2017 CBM-STAR joint Workshop - Walter F.J. Müller, FAIR

Status Civil Construction New tendering concept was accepted by BMBF a funding pre-release of 203 M€ for CC approved by BMBF on September 13th 2016 1st CC lot went for tender on September 26th 2016 (water management and excavation) 2nd CC lot went for tender in November 22nd 2016 (shell construction ‘north area’, includes SIS100 and CBM) start of excavation: mid-2017 start of shell construction: late 2017 / early 2018 The ball is rolling !! No project slippage anymore !! 18 March 2017 CBM-STAR joint Workshop - Walter F.J. Müller, FAIR

CBM Technical Design Report Status 18 March 2017 CBM-STAR joint Workshop - Walter F.J. Müller, FAIR

FAIR Baseline Schedule Major consolidation of all planning done in 2016 Goal of the management was to create a conservative planning (“done not later than ”) to have, for a first time, an integrated planning civil construction accelerator experiments covering construction, installation and commissioning phases for GSI campus based activities also resource loaded which serves as baseline to substantiate the earlier statements buildings finished 2022 FAIR operational 2025 18 March 2017 CBM-STAR joint Workshop - Walter F.J. Müller, FAIR

Planning Structure: CBM part Level2_CBM Management overview Installation and commissioning w/o beam  CBM ready for beam CBM_installation Detector construction  ready for installation FAIR CC PdR STS_construction TOF_construction Contracting and procurement Contract 1a Contract 2a Contract 1b Contract 2b 18 March 2017 CBM-STAR joint Workshop - Walter F.J. Müller, FAIR

Planning Structure: Full Picture Level1_FAIR shown to council .... material for council Level2 SIS100 Level2 HESR Level2 CBM lots of planning for each sub-project CBM_installation FAIR CC PdR STS_construction TOF_construction Contract 1a Contract 2a Contract 1b Contract 2b 18 March 2017 CBM-STAR joint Workshop - Walter F.J. Müller, FAIR

CBM-STAR joint Workshop - Walter F.J. Müller, FAIR FAIR Schedule Major effort Presented to FAIR council on December 6th, 2016 Very positive reception 18 March 2017 CBM-STAR joint Workshop - Walter F.J. Müller, FAIR

FAIR Schedule: SIS100 and CBM The CBM bottom line: Dec 2021 to Jul 2022 1st installation window Dec 2022 Building acceptance Dec 2022 to Jun 2024 Installation & commissioning w/o beam Jun 2024 to Mar 2025 Commissioning beam from SIS100 18 March 2017 CBM-STAR joint Workshop - Walter F.J. Müller, FAIR

CBM Schedule: TOF Installation The CBM bottom line (reminder): Dec 2022 to Jun 2024 Installation & commissioning w/o beam Jun 2024 to Mar 2025 Commissioning beam from SIS100 The CBM TOF bottom line: Apr 2023 to Jul 2023 Installation There should be no schedule conflict with STAR-BES-II 18 March 2017 CBM-STAR joint Workshop - Walter F.J. Müller, FAIR

Little Heavy Detail: Beam Dump Iron 18 March 2017 CBM-STAR joint Workshop - Walter F.J. Müller, FAIR

Thanks for your attention The End Thanks for your attention 18 March 2017 CBM-STAR joint Workshop - Walter F.J. Müller, FAIR

CBM-STAR joint Workshop - Walter F.J. Müller, FAIR Backup Slides 18 March 2017 CBM-STAR joint Workshop - Walter F.J. Müller, FAIR