The road to the first E2E tests

Slides:



Advertisements
Similar presentations
Solar System Division DVK, 10 Jul 2001 Rosetta Science Operations The planning concept - current status Detlef Koschny Space Science Department ESA/ESTEC.
Advertisements

ESOC | Chris Watson | ESA/ESOC | Page 1 SOC-Instrument Team interfaces CHRIS WATSON ESAC.
ESOC | Chris Watson | ESA/ESOC | Page 1 Mosaics Operational aspects CHRIS WATSON ESAC.
Time correlation CHRIS WATSON ESAC.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
09 May 2014page 1 ROCC to PPL ICD Initial Definition ExoMars Rover Operations Control Center ROCC.
Solar Orbiter SOWG 5| Richard Carr| Low Latency Pipeline Hosting and Delivery Architecture | Slide 1 ESA UNCLASSIFIED – For Official Use Solar Orbiter.
XMM-Newton EPIC OCB, 6-Nov-2007 EPIC OCB, 6-Nov XMM-Newton Future Instrument Operations Mallorca, 6 th -7 th November 2007 M. Casale, J.R. Muñoz.
SOLAR ORBITER SOC Test Plans Nana Bach SOWG#7 – 6-9 July 2015.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
EMC Quiet Planning During Science Operations Andrew Walsh & Chris Watson Solar Orbiter SOC, ESAC, Madrid EMC Working Group #12, Imperial College,
RSOC System Testing Status - 1 RSOC System Test Concept –Covered in RO-EST-PL-5013 –Status to be presented at key system reviews (GSRR) Connectivity Tests.
SGS: Activities and Requests Helen Middleton. Hermean Environment Working Group Meeting | SGS Team | Key Largo | 16/05/2013 | Slide 2 Contents 1.ESAC.
FGM report 9 th Cross calibration workshop Elizabeth Lucek, Patrick Brown, Paul French, Chris Carr, Tim Oddy, André Balogh I mperial College London March.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
Planetary Science Archive PSA User Group Meeting #1 PSA UG #1  July 2 - 3, 2013  ESAC PSA Archiving Standards.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
PDS Geosciences Node Page 1 Archiving Mars Mission Data Sets with the Planetary Data System Report to MEPAG Edward A. Guinness Dept. of Earth and Planetary.
SOWG # 6, 20/01/2015 ESAC Agenda  Finalization of the service 20 specifications  Test plans for the service20 at spacecraft level  Instruments.
GLAST Science Support CenterAugust 9, 2004 Users’ Committee Meeting GSSC USER SUPPORT David Band – GSSC.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
Aquarius Mission Simulation A realistic simulation is essential for mission readiness preparations This requires the ability to produce realistic data,
Solar Probe Plus A NASA Mission to Touch the Sun Mission Operations Review News Elena Adams 7/16/2015.
Page 1 PACS GRITS 17 June 2011 Herschel Data Analysis Guerilla Style: Keeping flexibility in a system with long development cycles Bernhard Schulz NASA.
Solar System Division DVK, 10 Jul 2001 Rosetta Science Operations Experimenter to RSOC interfaces Detlef Koschny Space Science Department ESA/ESTEC
An Early Release Science Program Janice C. Lee STScI Science Mission Office JWST Science Working Group Meeting 29 April 2015.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
7. LTP PLANNING EXERCISE: RESULTS Planning outcome Lessons learned from Planning Exercise.
ESA UNCLASSIFIED – For Official Use HSO-OP - Solar and Planetary Missions Division Solar Orbiter Instrument Operations, Data Handling and FDIR Ignacio.
ESOC | Chris Watson | ESA/ESOC | Page 1 SOC-Instrument Team interfaces CHRIS WATSON ESAC.
Testing Overview Software Reliability Techniques Testing Concepts CEN 4010 Class 24 – 11/17.
ESAC | Chris Watson | ESA/ESAC | Page 1 “Day in the life” testing of LL VMs CHRIS WATSON ESAC.
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
SOC-Produced Auxiliary data
RSOC Overview at SWT #26, 11/12 June 2009
Instrument Teams to SOC Test Specifications
Cluster Active Archive
【New Draft】 France -Japan International Co-funding Joint call Schedule (revised version) APR. 11, 2017 Bpifrance / NEDO final meeting (week of 18/9) Announcement.
Solar Probe Plus FIELDS MEP iPSR SOC Marc Pulupa April 10, 2017
SPF MAG Quarterly Report – Feb 2015
Richard Carr, ESAC, January 2015
ROCC Operations and The PSA RSP Archive Concept Review 28 September 2017 Tanya Lim Archive Scientist.
PDS4 Data From The Rover RSP Archive Concept Review 28 September 2017
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
CSC 480 Software Engineering
SOC-Instrument Team interfaces
ASPOC Presentation for the CAA Operations Review-1 Klaus Torkar and Harald Jeszenszky IWF/OAW Graz ESTEC, May 2006.
Rosetta Science Ground Segment Overview
Detlef Koschny Research and Scientific Support Department ESA/ESTEC
RLGS Status / LCC B. Pätz, DLR/MUSC.
IOR and E_FECS ICDs CHRIS WATSON ESAC.
Double Star Progress Meeting #3 Beijing 2 July, 2002.
Annual Report of the DWP Experiment 9th CAA Operations Review
CMMI Q & A.
PICAM Pipeline S/W development Milestones
Solar Orbiter Instrument Testing by MOC-SOC
The RSP Archive System RSP Archive Concept Review 28 September 2017
Instrument commanding VSTP (i-VSTP)
Solo mission operations
Current SOC-Ground System Integration Schedule (Jan )
ENTSO-E Transparency Platform Vision Project
Scheduling Toolkit Observation Scheduling Boyd Waters, NRAO
UK Link Technology Refresh
GLAST Large Area Telescope
EVLA Advisory Committee Meeting
XRN Nov 19 Release - Status Update
Overview of the recommendations on software updates
XRN Nov 19 Release - Status Update
XRN Nov 19 Release - Status Update
Presentation transcript:

The road to the first E2E tests Chris Watson SOWG#9, ESAC 25/Jan/2017

Overview What the first E2E tests are. How we get to the point where we can run one in April 2018 In terms of interfaces In terms of planning concept

First E2E tests What are the first E2E tests? “End-to-end” tests are End-to-end in the sense that, as far as possible, uplink products go all the way from ITs-SOC-MOC and (in principal) downlink products v.v. Scenario tests. We are simulating real operations in a realistic way (as far as possible) They are validation rather than verification. The first E2E tests are 1) IS-only E2E 2) Remote-sensing check-out window E2E Might be possible to merge the two tests, but at the moment they are separate. Both planned for L-6 months (April 2018) Both focussed on Cruise phase These E2E tests are big, semi-realistic, scenario tests involving multiple parties and multiple interfaces. They cannot possibly succeed without preparatory / lower-level tests. This presentation lays out the steps we want to take to be ready for these first E2E tests in ~Apr next year

E2E test schematic

First E2E tests schematic

Differences / limitations on first E2E tests pt1 In our opinion Mission-level planning equivalent for CP can be planned by SOC RSCW placement Pass planning RS-instruments have already seen a couple of crude CP plans for RSCWs from SOC LTP still exists, albeit simplified Not SOOP-orientated for RS-instruments at least Needed to coordinate e.g. when shared calibration pointing mosaics will run that data volumes can be supported

Differences / limitations on first E2E tests pt2 Simulator time The E2E command (input) products are supposed to cover one – several weeks We are probably not going to execute a several week E2E test all the way through We will need to intelligent about the period we plan, and the subset we execute Open question of whether E2E runs like a batch job (all inputs submitted in advance), or (more realistically) we run over an STP boundary, and allow STPn+1 commanding submission whilst STPn TM flow is ongoing Zero simulator time is actually a possibility => manual inspection and zero TM Science data content MOC simulator can provide science TM volume, but not meaningful content nor APID mix, packet cadence etc. Means that we can exercise the broad retrieval of science “data” but not process that TM

Differences / limitations on first E2E tests pt3 No Selective Since Cruise Phase No i-VSTP No TAC No PDORs/MDORs Auxiliary data Spacecraft clock kernels TBC which other aux data produced

First E2E tests schematic

Preparation - interfaces SOC concept of interface maturity 1) Compatibility test Representative ICD-compliant file, sent by any convenient method. Does not need to be generated by the “real” SW. Normally “example file” 2) Integration test As before, but created by the real SW (can be an early release thereof) and sent via the flight mechanism. 3) Validation test Active use of the product in some wider scenario-based test This is the E2E test in this case.

Preparation – validating the planning concept Besides the individual interfaces, we also want to exercise the planning cycle flow. I already touched on this Mission-level equivalent can be planned by SOC RSCW placement Pass planning LTP still exists, albeit simplified Not SOOP-orientated Needed e.g. to coordinate when instruments will Additionally for these first E2E tests, we propose to skip MTP. i.e. go directly from LTP->STP => Cruise phase SOWG LTP planning exercise in SOWG#10, July 2017. To feed into E2E test.

Preparation schedule affecting Instrument Teams – Current status Date Item May 2016 EFECS TMC Compatibility test TM (EDDS) Generic EDDS TM example as part of LL-pipeline development Approx half of ITs have also received EDDS TM from SFT/FFT Jan 2017 TC (EDDS) Example files on SOC-Public Instrument teams inspection to be formalised Trajectory files Trajectory files have been available for a long time, but have not been formally exchanged. For instruments that will actively use the trajectory in their planning, do we need to organise formal compatibility, integration test?...

Preparation schedule affecting Instrument Teams - future Date Item Feb-Mar 2017 File-transfer ITs<->SOC Interface tests ??Feb 2017 IOR Compatibility test ITs write a example IOR by any means July 2017 SOWG#10 LTP planning Oct 2017 EFECS/TMC Integration test SOC delivery of EFECS/TMC to be used for first E2E test ??Oct 2017 ITs write IORs with proper SW and deliver via file-transfer Dec 2017 EDDS Test Integration Test (for TM, TC) Jan 2018 Deliver final IORs to SOC Mar 2018 SOC deliver final PORs to ESOC

Current biggest single concern = procedures