B2B Working Group Workshop

Slides:



Advertisements
Similar presentations
Retail Market Subcommittee Update to TAC February 5, 2004.
Advertisements

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Retail Market Update June 5, New meter is requested for a specific customer’s location. 2.Application is filed by customer and/or the customer’s.
How to do business guide. Fixed, Data and Hosted Solutions by Mandy Fazelynia Latest update – 11/11/2013 Operations Director.
IGGIGG Industry Governance Group Secretariat: RMDS Secretariat: RMDS 1 IGG Agenda – July 19 th 2007 Minutes from last IGG meeting10.00.
RMS/COPS Workshop VI 1 October 06, Antitrust Admonition ERCOT strictly prohibits Market Participants and their employees who are participating in.
RMDSRMDS Retail Market Design Services 1 IGG Agenda – March 8 th 2007 Minutes from last IGG meeting10.00 – Review of Action Items10.10.
RMDSRMDS Retail Market Design Services 1 IGG Agenda – September 21 st 2006 Minutes from last IGG meeting10.00 – Review of Action.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
ScottishPower, Energy Retail MOD 282 – Introduction of a process to manage Long Term Vacant Sites May 2010 Elaine Carr ScottishPower.
RMDSRMDS Retail Market Design Services 1 IGG Agenda – November 1s t 2006 Minutes from last IGG meeting10.00 – Networks AIM Project.
1 DIRECTORATE-GENERAL FOR ENERGY AND TRANSPORT Digital Tachograph : Information Seminar Budapest, 25-26/02/20009 Digitac.
SLIDE 1 POC PROCEDURES WORKING GROUP (POC-PWG) 14 January 2016.
SLIDE 1 POC PROCEDURES WORKING GROUP (POC-PWG) 11 March 2016.
SLIDE 1 Power Of Choice Metering Competition Pre-Final Rule Determination Workshop #2 24 th September 2015 FINAL.
AEMCPresentation to GWCFPAGE 1 AEMC and Rule changes Presentation to AEMO Gas Wholesale Consultative Forum Kamlesh Khelawan Director This presentation.
Power of Choice (PoC) Program Overview
Direct Participation Enrollment Process for 2017 DRAM
Power of choice – embedded networks information session
Power of choice executive forum
B2B Working Group Meeting
COMET Working Group Progress Report 11/13/03
Power of Choice – Program Consultative Forum (Poc-PCF) Meeting pack
Summit 2006: Knowledge is Power Steve Heister Helen Robie
EXECUTIVE forum DATE: 15 DECEMBER 2016 TIME: AM – PM
Broken Hill Solar Plant
Training Documentation – Replacing GSPR with RFQ 2.0
B2B Working Group Workshop
B2B Working Group 30 November, 2016
IGG Agenda – April 19th 2007 Minutes from last IGG meeting – 10.10
New transparency guidelines
Kodak - Social On Demand
Retail Market Assurance Services for the Irish Electricity Market
Customer Online Ordering
POC Procedures Working Group (POC-pWG)
ESB Networks AIP Programme
PROGRAM CONSULTATIVE FORUM Meeting pack
ERO Portal Overview & CFR Tool Training
July 13, 2016 Department of Environmental Quality Proposed Amendments to UST Rules 15A NCAC 02N and 02O Ruth Strauss.
Seniors Alert Scheme November /December 2017.
POC Procedures Working Group (POC-PWG) Work package 3 (As Built)
B2B Working Group Workshop
EXECUTIVE FORUM 8a Meeting pack
Harmonisation Working Group
September 8, 2016 Department of Environmental Quality Proposed Amendments to UST Rules 15A NCAC 02N and 02O Ruth Strauss.
Review of Professional Standards A National Conversation
Five-Minute Settlement Program: Executive Forum 1
Harmonisation Working Group Update on Harmonisation Project
Update on European Network Codes
PROGRAM CONSULTATIVE FORUM Meeting pack
Seniors Alert Scheme November /December 2017.
EXECUTIVE forum DATE: 27 MARCH 2017 TIME: 2.00 PM – 3.30 PM (AEDT)
Harmonisation Working Group
IGG Agenda – 18th September 2008
HIA Presentation August 2018.
Harmonisation Working Group
4th Quarter 2015 Thursday, October 15, :00 to 3:30 p.m. EST
IGG Agenda – 15th May 2008 Minutes from last IGG meeting
Approach to Market Cutover - Draft for Discussion
Power of Choice (PoC) Program Overview
Five-Minute Settlement Program: Program Consultative Forum 6
Managing Multi-source Feedback
TAG Agenda – April 6th 2006 Minutes from last TAG meeting – 13.45
Smart Grid Update – January 2011
ESB Networks AIP Programme Meeting of the IGG, November 1st 2006
Alignment of Part 4B with ISAE 3000
Public Protector South Africa Deputy Public Protector of South Africa
IGG Agenda – 11th April 2008 Minutes from last IGG meeting
Presentation transcript:

B2B Working Group Workshop 22 September 2016 10:00 – 16:00 Presented BY Chris Cormack

Agenda In Attendance Update on progress and confirmation of timeline and IEC sign-off process for start of consultation. Review two new supplied transactions: NMI inquiry Pre-installation query Documents, document structure and drafting points Technical Specification document and any technical issues Notified Party transactions MSATs changes required to support B2B procedures Clarify Customer details notification with respect to Life Support Prospective retailer service orders Any other feedback

In attendance AEMO: Chris Cormack – Procedure Lead, Andrew Suwignjo – SME, Paul Le Favi – SME, Jackie Krizmanic- SME, Matt Stuchbury - BA. Retailer reps:, Mark Riley – AGL Energy, Mara Tenis – Lumo/Red Energy, Karly Train – Energy Australia, Aakash Sembey – Simply Distributor reps: David Woods – SA Power Networks, Brett McLean – United Energy, David Sales –TasNetworks, Anna Russo – Endeavour Energy Metering or Third Party reps: Paul Greenwood – Vector, Charles Coulson – Metropolis Metering, Helen Vassos– Active Stream, Shaun Cuppitt – Acumen Apologies: nil.

UpDATE and NEXT STEPS 22 September todays workshop 27 September – draft procedure review 4 October – draft procedure Final review 7 October – endorsement to proceed to IEC for approval to consult 10 October – Initial Draft procedures sent to IEC 17 October – IEC Meeting 20 October – Initial Consultation starts 25 November – Initial Consultation ends 23 December – Draft procedures Consultation starts 20 January – Draft procedures Consultation ends 6 March – Publish final procedures

Pre-installation Query and NMI Inquiry transaction Review information provided by participants: NMI Inquiry – supplied by Brett McLean. The group defined a similar transaction in Adds and Alts discussion Meter Installation query – are these sufficiently different to warrant a different transaction? Pre-Installation query – supplied by Shaun Cupitt For review.

Documents and drafting Four key Procedures updates: Service Order Process 3.0 – see next page for full Service Order communications. Customer Site Details Notification 3.0 – Customer Details Notification including new Life Support Customer Details Block, Custer Details Request, Customer Details Reconciliation, Site Details Notification. Data Process 3.0 – formally Meter Data process includes PMD, VMD and MDN as well as the provision of data for transactions – Pre-Installation query, Meter Installation query and NMI inquiry. One Way Notification 3.0 – Network Tariff Notification, Meter Fault Notice, Planned Interruption notification and Notice of Metering Works Other documents Technical Specification 3.0 – incorporates all technical information in one document Business Rules Guide – a new document that can be used by participants to guide the use of procedures (IEC document not B2B procedure) Glossary update for B2B terminology – this is an update to the Retail Procedures Glossary and Framework for key terms from B2B procedures ROLR Procedure Part B – once B2B procedures are close to being finalised this will be updated

service order LIST Including hierarchy Supply Service Works Allocate NMI Tariff Change Supply Connection Supply Alteration Supply Abolishment RE-Energisation De-Energisation Remote Remove Fuse Turn off main switch and sticker Main switch seal Technical disconnect Meter Isolation Supply Isolation Disconnection at pole top, pillar box or pit Recipient discretion Special Read Check Read Final Read On Demand Metering Service Works Meter Exchange Meter Install Move Meter Meter Reconfiguration Remove Meter Install Controlled Load Install Hot Water Change Time Switch Meter Investigation – Inspect Meter Investigation – Test Meter Investigation – Tamper Miscellaneous Service Request

Drafting Principles for new B2b Procedures AEMO’s current style guide No replication of legal requirements Legal and regulatory context consolidated in Retail Electricity Market Procedures – Glossary and Framework Common terms defined in Retail Electricity Market Procedures Glossary and Framework) Long terms will be abbreviated where the abbreviations are commonly used

Drafting Principles for new B2b Procedures The content of each procedure will reflect the subject matter of that procedure and not be replicated Redundant or anachronistic material either redrafted or deleted Procedures will be consolidated where appropriate Other changes based on the drafting principles are intended to rationalise, not change the substance of the obligations or rights of the parties to which the procedures apply

Technical specification Questions Schema change: Will there be a mandatory schema change 1st December 2017? Transactional interactions between participants and the B2B/SMP hub: Will participants be able to use their current/preferred method of transacting with the hub? Will the hub transform messages into the preferred transactional method for each participant? Will there be instantaneous transactions? ITWG Commencement When will the ITWG for the SMP commence?

Agenda items added by the group Notified Party transactions Brett McLean Email MSATs changes required to support B2B procedures Anna Russo Email Clarify Customer details notification with respect to Life Support General Discussion – see over Prospective retailer service orders Mara Tenis Email Any other items

Customer site details notification incorporating Life support New Process flow allows participants to use other means of communication – as agreed between Initiator and Recipient – which could be phone or email. However, there is still an expectation that a CDN will be sent by an Initiator.

Life Support Details block If Life Support Flag is checked Y (Mandatory Field in in CDN) then the following fields become available: Field Format : USAGE Definition/Comments LifeSupportContactName PERSONNAME M   Should be the name of the person who is the specific contact for the management of Life Support and Life Support Equipment for the connection point. LSPostalAddress ADDRESS Must be the customer’s postal address for Life Support notifications. An aseXML compliant structured address or unstructured address must be provided. The data provided must be the one considered by the Current FRMP to be the one most suitable for use as a postal address for contacting the customer. The postal address, if provided in an unstructured format, must be complete such as to comply with Australia Post presentation standards. . LSPhoneNumber1 TELEPHONE R Must be the phone number of the person who is the specific contact for the management of Life Support notification for each connection point. LSPhoneNumber2 Must be the phone number of the person who is the specific contact for the management of Life Support notifications for each connection point. LSEmailAddress VARCHAR(40) M/N Email Address should be provided if recorded by Initiator LifeSupportEvidence VARCHAR(1) Y or N values only.   ConcessionDetails Concession Details should be provided if recorded by Initiator. Must be provided if LifeSupportEvidence = Y SiteAddress Must be the site address for the location of the Life Support Equipment. An aseXML compliant structured address or unstructured address must be provided. Must be provided if LifeSupportEvidence = Y Life Support Equipment Must be provided if LifeSupport Evidence = Y.  List of Equipment (To be added here) PatientName Should be the name of the person who uses LifeSupport Equipment.. Must be provided if LifeSupportEvidence = Y

NEXT STEPs Next Workshop 27 September