SOROCA PROJECT LAUNCH WORKSHOP

Slides:



Advertisements
Similar presentations
SPRINGETTSBURY TOWNSHIP.
Advertisements

Time-of-Use and Critical Peak Pricing
1000 Friends of Florida Presentation on May 12, 2005 Presenter: Kart Vaith/CDM
AQUAREC Project Centre for Water Systems AQUAREC Project Centre for Water Systems D. Joksimovic.
Techniques in post treatment of ABR effluents in treating municipal wastewater A literature review of appropriate technologies for Nepal Sanita Dhaubanjar’13.
A SCHEME FOR MUNICIPAL WASTEWATER TREATMENT IN INDIA By PROF SOLI J ARCEIVALA Formerly, Chief, Environmental Health, UN / WHO SE Asia Region and Director,
Municipal & Financial Services Group Water and Sewer Rate Study Revenue Requirements and Rates Workshop April 18, 2012 King George County Service Authority.
Upgrade of Sana'a WWTP1 Upgrade of the Sana‘a Wastewater Treatment Plant Presentation of the Design Implementation of the New Preliminary Wastewater.
By: Audella Eid Advisor: Dr. R. Zurayk Constructed Wetlands for Wastewater treatment.
Dep. of Sanitary Engineering Membranelagoon Wildberg – Upgrading of Wastewater Lagoons by Membrane Technology Dipl. Geogr. Katharina Teschner Technical.
Treatment Wetlands Presented by: Scott Wallace, P.E.
Bank aus Verantwortung Nexus Water – Energy – Climate: Experiences of KfW-financed projects in the MENA-region Dr. Stefan Gramel / Technical Advisor -
Glycol Treatment for Aircraft Deicing Scott Wallace and Mark Liner – Naturally Wallace Consulting David Cooper and Clodagh Murphy – ARM, Ltd. Russell Knight.
Constructed Wetlands and Wastewater Treatment Scott Stine SWES 574.
Feasibility Study of Constructed Wetlands for Wastewater Treatment and Wildlife Habitat Luna County, NM Public Meeting November 10, :00 am Presented.
Aquatic-Based Treatment Systems Biological Treatment after appropriate pre- and primary treatment Plants used to provide substrate for bacterial growth,
Characteristics of Wetlands  Must have Hydrophytes Hydrophytes Soils that are saturated, flooded or ponded long enough to develop anaerobic conditions.Soils.
Life Cycle Analysis and Resource Management Dr. Forbes McDougall Procter & Gamble UK.
Introduction: We will start with an overview of treatment processes 1) Why do we treat water and wastewater? The main objectives of the conventional wastewater.
Waste water treatment - Phycoremediation
TRP Chapter Chapter 4.2 Waste minimisation.
Water Reuse in Agriculture - Pros and Cons Dr. Konrad Buchauer Moldova WATER REUSE.
Safe Use of Wastewater in Agriculture UN-Water at IFAT 2012 Water reuse in Agriculture in the Arab region Situation, needs and challenges Eng. Khaldon.
This project has been assisted by the New South Wales Government through its Energy Efficiency Training Program Prepared by Energy Efficiency through Product.
IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When.
This project is financed by the European Union and the Republic of Turkey. TRAINING TEACHERS FOR VOCATIONAL EDUCATION AND TRAINING Prof. Dr. Mustafa SAFRAN.
PROGRESS REVIEW POLANNARUWA Presented By: Eng. Vijayabalan, J. Engineer (RWS) Mannar/Vavuniya Prepared By: Rural Water and Sanitation Unit,
Senior Citizen Living 1766 N Atherton St State College, PA EDSGN 100 Section 06 Erika Arrojado Cody Shustack Matthew Malencia Andrew Zaunegger.
Glycol Treatment at London’s Heathrow Airport
High Rate Thermophilic Anaerobic Membrane Bioreactor for Wastewater Treatment by Kaushalya C. Wijekoon Master Student (st107821) EEM/SERD Wastewater Ξ.
Integrated Constructed Wetlands Regulatory Aspects - the EPA’s role Aoife Loughnane Inspector, Environmental Licensing Programme Environmental Protection.
NATURAL WASTEWATER TREATMENT  Pollutant removal by minimal energy utilisation and chemicals  Usage of natural processes (natural resources)  Low cost.
Soroca WWTP Project - Constructed Wetlands as a Locally Appropriate Technology Dr. Konrad Buchauer Soroca, Moldova SOROCA PROJECT LAUNCH WORKSHOP.
EPUR NATURE : A company which designs and builds reed bed filters for waste water treatment from 50 to 5000 p.e.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Economic challenges of wastewater treatment and use in agriculture Javier Mateo-Sagasta, FAO Pay Drechsel, IWMI.
Feasibility Study as a Basis for Investment Financing Arto Nuorkivi ESCOBALT Project Manager, Finland Kaunas, Dec. 14, 2005.
Specific Applications Technical Reports Part II. Technical Reports Report structure is argumentative or chronological, what is the difference?Usually,
Page 1 Petten 27 – Feb ALFRED and ELFR Secondary System and Plant Layout.
Anaerobic Digesters Key Considerations in Feasibility.
WHAT IS THE ROLE OF ECONOMICS IN THE WFD PROCESS? A selection of key economic inputs.
CEE 426 September :05 PM UW Madison Room _____ Engineering Hall Energy in Wastewater Treatment Plants Thomas E. Jenkins, P.E. 1.
Implementation of the CHP Directive - overview and outlook Talking competitiveness! New perspectives for CHP/DHC EHP Annual Conference Brussels
Linnfall Consulting Market design: the energy-only market model Linnfall Consulting September 2015.
WASTEWATER TREATMENT PETRIT TARE GENERAL DIRECTOR OF UKKO JSC CONFORMING TO EU WASTEWATER TREATMENT DIRECTIVE CASE STUDY OF KORCA CITY, ALBANIA.
Testing Requirements in the Boiler House Requirements for regular testing will vary according to national regulations, and the type of equipment installed.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: July 7, 2009 Ventilation for non-residential buildings - Performance requirements.
Simple Sanitation Technology For Egypt Villages Prepared by Sameh Seif Ghali Executive Director Together Association For development and environment R.
WASTEWATER TREATMENT IN BULGARIA STATUS AND CHALANGES ORLIN DIKOV – INFRASTRUCTURE CONSULTANT.
Free Air Cooling for Data Centres
Rastlinske čistilne naprave
5th Annual Water and Sanitation Workshop
Maturing and cold smoking
PRESENTATION OF FINDINGS GRANTEES NEED ASSESSMENT
Lecture (8): liquid wastes treatment (primary, vital, advanced).
Lecture (7): Topic (1) Types of site sanitation ways :
Water Reuse in Agriculture
Lecture (7): Types of site sanitation ways
ENERGY SAVING & SUSTAINABLE WASTEWATER TREATMENT PLANTS
Financing Public WSS Infrastructure: Reflections on competing investment drivers and other factors to be considered 3 Challenges & 3 Recommendations from.
18/11/07 Danube Water Conference 2018, Vienna, Austria
Exploring opportunities for innovative wastewater treatment with energy and materials recovery in the Lower Danube region Alberto Pistocchi.
Profiling in Switzerland Costs and benefits
An example of Finland's approach to wastewater treatment for households in rural areas Kimmo Tiilikainen Minister of the Environment Finland
River Basin Management Flood protection
Wastewater Treatment Secondary Treatment.
JRC Scientific support to the EUSDR
Decentralized wastewater solutions in rural areas
IAWD Danube Water Conference 2019 Vienna, 20th May 2019
Moldova GEF Environmental Infrastructure Project
Presentation transcript:

SOROCA PROJECT LAUNCH WORKSHOP Soroca WWTP Project - Constructed Wetlands as a Locally Appropriate Technology Dr. Konrad Buchauer 10.12.2007 Soroca, Moldova

Reasons for choosing Constructed Wetlands Table of Contents Reasons for choosing Constructed Wetlands Constructed Wetlands – Technology and Construction Project Implementation of Soroca WWTP

Local Conditions <> Conclusions 1. Reasons for Choosing Constructed Wetlands (CWs) Local Conditions <> Conclusions LOCAL CONDITION CONCLUSION (1) Treatment targets: Carbon removal (BOD, COD, SS) Enhanced nutrient removal (N, P) Hygiene? Carbon removal of CWs is equivalent to convent. technologies. N removal – with a properly designed CW – can be brought to similar levels as with convent. technologies nowadays. P removal in CWs decreases over time, yet an acceptable mean elimination rate of 50% is considered feasible. Soroca WWTP shall be based upon 2-stage CWs. These systems feature superior pathogen removal, as compared to convent. technologies. Properly designed 2-stage CWs enable enhanced nutrient removal and even have better hygienic effluent quality than conventional technologies.

Local Conditions <> Conclusions 1. Reasons for Choosing Constructed Wetlands (CWs) Local Conditions <> Conclusions LOCAL CONDITION CONCLUSION (2) Cold winter temperatures and snowfall Latest design criteria take due consideration of cold temperatures. There exist about 20 years of practical experience with CWs in Central Europe under climate zones comparable to Moldova (France, Austria, Germany, Switzerland, etc.). CWs, of course, look different in winter time, but nonetheless work satisfactorily. summer winter Properly designed 2-stage CWs will continue working properly in winter time.

Local Conditions <> Conclusions 1. Reasons for Choosing Constructed Wetlands (CWs) Local Conditions <> Conclusions LOCAL CONDITION CONCLUSION (3) Limited financial resources, limited scope for a strong increase in water & wastewater tariffs Cost for CWs: Investment cost = US$ 3 million O&M cost = US$ 0,04 million/year Cost for (optimised) Activated Sludge system: Investment cost = US$ 5,1 million O&M cost = US$ 0,30 million/year CWs will reduce the financial burden on Soroca and lead to considerable lower W&WW tariffs than convent. technologies. (4) About 10 hectare of land are available for the WWTP The land requirement for 2-stage CWs is estimated to about 5 ha at present. Hence there is sufficient land available, offering even scope for further expansions.

Local Conditions <> Conclusions 1. Reasons for Choosing Constructed Wetlands (CWs) Local Conditions <> Conclusions LOCAL CONDITION CONCLUSION (5) Lack of skilled operators The Soroca WWTP project will include staff training. Even though CWs are easy to operate, this is considered indispensable and will safeguard proper operation practices according to the latest know-how. By contrast, the operation of convent. techn., such as AS, poses much higher challenges to operators. The difficulties not only relate to compliance with effluent criteria, but also to human safety. A relatively short training would not be sufficient for such a task. Typical WWTP operator training programmes in Central Europe take years, and are targeting professionals only (electrician, etc.). CWs can be satisfactorily operated by local staff after appropriate training.

Local Conditions <> Conclusions 1. Reasons for Choosing Constructed Wetlands (CWs) Local Conditions <> Conclusions LOCAL CONDITION CONCLUSION (6) Unreliable power supply The CWs as such operate without electric energy. The wastewater flows through the plant by gravity. No aeration, recirculation pumping, etc is required. By contrast, the operation of convent. techn., such as AS, is fully dependant on permanent and strong power supply. CWs will be able to cope with unreliable power supply.

● favourable -- unfavorable 1. Reasons for Choosing Constructed Wetlands (CWs) Summary: Technol. Appropriateness under Local Cond. 2-stage CW Convent. Technol. ENVIRONMENT BOD / COD / SS removal ● Nutrient (N / P) removal Coliform / Helminth removal -- COST Investment O & M Wastewater tariff TECHNOLOGY Ease of operation, requirement for skilled operators Land requirement Dependence on permanent power supply ● favourable -- unfavorable

Technologies for Constructed Wetlands 2. Constructed Wetlands – Technology and Construction Technologies for Constructed Wetlands (1) Horizontal subsurface flow (HF) (2) Vertical subsurface flow (VF) (3) Free water surface (FWS) (4) 2-stage (hybrid) CWs Suggested for Soroca: Combination of (1) + (2) Source: SWAMP 2005

2-stage CWs: French system with 2 VF 2. Constructed Wetlands – Technology and Construction 2-stage CWs: French system with 2 VF Flow scheme Nr. of 2-stage CWs in France Sources: Molle et al. 2004, Lienard 2003

2-stage CWs as compared to 1-stage CWs: Advantages 2. Constructed Wetlands – Technology and Construction 2-stage CWs as compared to 1-stage CWs: Advantages Approximately 50% of land requirement, as compared to 1–stage CWs. Better treatment efficiency, particularly better nutrient and pathogen removal. 20 years of practical experience. No pre-treatment required, apart from screening (French system). No need for separate sludge treatment ( French system).

2. Constructed Wetlands – Technology and Construction Construction steps 1 2 3 4 5 6 Source: Austria, BOKU 2005

Consultant’s Key Tasks 3. Project Implementation of Soroca WWTP Consultant’s Key Tasks Other 2-stage CW options French CW system with 2-stage VF Analysis and definition of prevailing wastewater flow rates and load Optimization of treatment technology Detailed design & Bidding Docs Supervision of construction works Staff training Assistance during start-up & initial 6-month operation period

Time Schedule 3. Project Implementation of Soroca WWTP Design and Bidding Docs 2007 - 2008 Construction period 2008 - 2010 Staff training 2010 WWTP start-up 2010 1st know-how dissemination workshop in Soroca 2011