WP 2 – Valorisation of Sludge

Slides:



Advertisements
Similar presentations
MILK PLATE PASTEURIZER. Milk pasteurizer for instance the following thermal cycle or other, in relation with the product to handle. The plant will.
Advertisements

Series L Air conditioners for Laboratories.
AEC advanced environmental control aps
It can be as easy as patching a hose. TEAM UP! FOR COMPRESSED AIR SAVINGS.
Customer Service – International Dept. The thermal solar systems  Installation  Commissioning  Maintenance.
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
Internationally renowned for localised service High efficient, economic and flexible Waste Water Treatment with Biofiltration 3 rd Generation.
INTRODUCTION TO THE TREATMENT OF TANNERY EFFLUENTS
Soneva Gili Resort Comments on existing STP 27. August 2008.
Introduction to Environmental Engineering Code No. (PE389) Lec. 6.
TEXAS COMMISSION on ENVIRONMENTAL QUALITY. PROPOSED STUCTURE FOR CHAPTER 217 < Subchapter A Administrative Provisions < Subchapter B Design Bases < Subchapter.
Genesee County Drain Commissioner Water and Waste Services Division District #3 Linden WWTP Digester Improvements Project, Phase I Joe Goergen, GCDC -
Industrial Wastewater treatment solutions Wastewater treatment is simple and easy..
Mini Jet Sample Dyeing M/C Daelim Starlet Co., Ltd.
STATESMAN Campers, Raising the standards. STATESMAN XP- 3.
The Quality Company - Worldwide SOUTH WEST WASTE MINIMISATION GROUP 3 RD JUNE 2009.
Bereichskennung oder Produktname Process Instrumentation and Analytics Januar, 2003 Folie 1 A&D PI2 SE1 Siemens Process Analytics in the Cement Industry.
20,000 Barrel Per Day Produced Water Treatment System
The SR Scale Remover For Cooling Water Treatment Without Chemicals.
Hydraulics.
CAFS On-Line Orientation
MILK PASTEURIZER. One milk pasteuriser with a capacity of litres of milk for hours, HTST type with an operate range from 75° to 95°C, including.
ERU WATSAN SPANISH RED CROSS Water Treatment Plant SETA.
September 23, 2004 EVEREST Water Systems Inc. Solution Clear The is.
POLUTED WATER WITH OIL HYDROCARBONS, METALS, SALTS, CHEMICALS... Emulsion = Water + Concentrate.
PASTEURIZER TUNNEL. Pasteurizer tunnel for the jars or bottles with a total surface of about 3 sqm – net dimensions of the belt conveyor width mm.
Increasing Energy Efficiency at the Allegan WWTP MWEA/AWWA Joint Annual Conference August 19, 2010.
Pollutants in wastewater -- Revisited Ammonia Organic matter Nutrients Pathogens Color Metals and SUSPENDED SOLIDS.
TREATMENT OF A DAIRY FARM WASTEWATER USING A PILOT SCALE UPFLOW ANAEROBIC SLUDGE BLANKET (UASB) PROCESS By Ashveen Deerpaul & Arvinda Kumar RAGEN.
Ultra Sonic 2001 Touch Free Car Wash RYKO Manufacturing Company.
Alive Project Sanitation System Non traditional sanitation system (low cost) which is implemented by Alive project in the villages is one of the useful.
Vacuum system.
Sewage Treatment.
ERU WATSAN MOD. 15 SETA plant centrifugal pump: Maintenance and replacement.
(U-shaped tank) WATER TANK SLUDGE TANK This system makes it possible to recover the liquid part of the suctioned material in the sludge compartment.
COOLING & VENTILATION FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 16/9/2009 CLIC TWO BEAM MODULES REVIEW
Water, safe, sustainable and for all - Design Competition Presented by- Aditi Bidkar Varshapriya Radhakrishnan Symbiosis Institute of Design, Pune.
Waste Water Treatment Denis MOTA. Overview Waste water Treatment Treatment in LYON  Pierre Bénite.
Lake clean-up process. 1. Project overview The compressed air can reach into the contaminated area to treat, and contaminated materials are separating.
INFILCO DEGREMONT, INC HIGH SOLID ANAEROBIC DIGESTION (HISAD)
Engineered systems for wastewater treatment and disposal.
 Market Survey  Design, supply, delivery and installation of a Clean Room Facility  at the entrance of the LAr detector tank,  used for the storage.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
Knit Dyeing Machines.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
Sorbent Handling Plant by NHI-Design & Equipment Specifications
Water Filtration Plant Improvements Project Summary
Technical overview PM2 Stockholm June 2017.
Maturing and cold smoking
WP 4 – Valorisation of algal biomass
APPLICATIONS Designed and manufactured to meet the needs for constant pressure required by modern plumbing systems, such as : Domestic applications and.
GOVERNMENT ENGINEERING COLLEGE DAHOD
WP 7 – Integrated Sustainability and Business Viability Assessment
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Engineered Water Treatment Solutions
HOUGHTO-MIX Coolant Mixing and Supply Unit Rainer Hoerbst
Pilot Operated Pulse Valve Manufactured by maniks
T7 – POLYPROPYLENE PLEATED CARTRIDGES
ECH CARTRIDGE FILTER HOUSINGS ENCELADUS WATER GROUP, LLC
Application Operation principle Advantages Highlights Comparison
High Pressure screw compressor
Vertical Pressure Filters
ISHAN PARYAVARAN PVT. LTD.
MINI 1A iAquaMax™ Kidney / water removal system
Meitler Consulting Inc
1A iAquaMax™ Kidney / water removal system
CAFS On-Line Orientation
Wastewater Treatment: Characteristics and Systems
Saltgae Project 1st Stakeholder Meeting 2nd October 2018
Presentation transcript:

WP 2 – Valorisation of Sludge Consortium Meeting 15 june 2017 Stockholm, Sweden

Table of contents WP2. TASK 2.1- Primary Treatment, DAF and Buffer Tank. WP2. TASK 2.1 a – Waste Water Characterization WP2. TASK 2.1 b – Primary treatment and pre-treatment. WP2. TASK 2.1 c – Detail design for Demo Sites. (Milestone M2) ADDITIONAL DATA REQUIRED.

WP2. TASK 2.1- Pre Treatment, DAF and Buffer Tank. WP2. TASK 2.1 a – Waste Water Characterization (finished) Objetive: The objective of the characterization is to determine the quality of the water to be treated in order to propose an initial solution according to the contamination parameters. Principal Task: Analyzes for characterization of different raw water from saline waste water effluents. Conclusions: Characterization. There is not a valid relation for the results of samples as expected before. So, it will be mandatory to realize an individual study of raw water for each project.

WP2. TASK 2.1- Primary Treatment, DAF and Buffer Tank. WP2. TASK 2.1 b – Primary Treatment and Pretreatment (finished) Objetives: Treatment objetives: For low BOD systems (Demo site Israel and Italy) remove of solids > 0,5 mm and removal of 25-30 % of incoming COD with DAF process. For high BOD systems (Demo site Slovenia) remove of 95 % of solids for Anaerobic Digestion. Mecanical and operation objetives: Reduce of manpower for maintenance (Pumping station design, rotoscreening,...) Elimination of mecanical problems (Clogging, corrosion, ...)

WP2. TASK 2.1- Primary Treatment, DAF and Buffer Tank. Principal Task: In order to determine the viability of the DAF solution some tests have been carried out with some of the samples analyzed for caracterization. Conclusions: It can be concluded that water from the agri-food industry with a high content of organic matter can be treated by DAF with good results. (31,65 % COD removal)

WP2. TASK 2.1- Primary Treatment, DAF and Buffer Tank. Tasks: Treatment design: The treatment process for KOTO installation has been defined. The treatment process for ARAVA installation has been defined. The treatment process for ARCHIMEDE installation has been defined. Mecanical and operation: Materials for different salinity grades to avoid corrosion. (Plastic materials, stainless steel alloys, …) are defined. Pumps with special characteristic to avoid clogging are defined.

WP2. TASK 2.1- Primary Treatment, DAF and Buffer Tank.

WP2. TASK 2.1- Primary Treatment, DAF and Buffer Tank.

WP2. TASK 2.1- Primary Treatment, DAF and Buffer Tank.

Planned Activity: Have been finished the tasks 2.1a and task 2.1b in order to complete Deliverable 2.1. Task 2.1c . Detail design for manufacture of Demo Sites equipments. Working on it and will be finished by end of June – Milestone 2 (M12)- . After it, manufacture of equipment will begin (M13) and finish in (M15-16). Deviations for the Plan: Deliverable 2.1 it´s finished and summited. Milestone 2 (M12). Technical details for manufacturer. Not expected a delay. Will be finish by end of June.

MILESTONE M2 MILESTONE DESCRIPTION. Design and dimensioning of process for Pretreatment and Primary Treatment. MEANS OF VERIFICATION. Detailed design of Pretreatment and Primary Treatment Processes. Will include detail drawings and specifications of equipments and facilities and rest of data needed for manufacture process. Arava´s equipment inside container 40´

MILESTONE M2 MEANS OF VERIFICATION. Big solids removal SLOVENIA DEMO SITE ROTOSCREENER   Units 1 Light hole 0,15 mm Mesh type grating mesh Maximum flow 7 m3/h Drum diameter 400 mm Length drum 250 mm Power 0,25 (400V/50Hz/3ph) Protection IP55 Drum raw material duplex Rotary case material Cover yes Self cleaning system Inlet fresh water needed yes, 3 bar pressure, 20 lpm Nozzles 2 Flow per nozzle 10 lpm Total cleaning flow 20 lpm Connection 1/2" Others Electrical cabinet with electrical switchgear Automatic control for operation and cleaning

MILESTONE M2 MEANS OF VERIFICATION. PRIMARY TREATMENT ITALY DEMO SITE DAF SYSTEM   DISSOLVED AIR FLOTATION UNIT Design flow 2 m3/h Material GRP Finish material Gel Coat Support AISI 304 Lamellar separator system Distance between lamelas 70 mm GRP + PVC Sludge unloading Valve Butterfly simple effect pneumatic acting Surface Scraper GRP+AISI 316 Engine Endless crown Motor 0,18 (400V/50Hz/3ph) Pressurization valves Type Diafragm Regulation Manual Cleaning Fully opened Recirculation Pump Centrifuge Flow 0-4,4 m3/h Pressure 2,6-5,9 bar 0,75 (400V/50Hz/3ph) AISI 316 Pressuration Tank 1 unit Capacity 11,2 l Pneumatic components Panel Electro-pneumatic air filter air control manometer pressure control flow rate measure system electronic valves Compressed Air needs 254 lpm 10 bar 6-8 bar working pressure Electrical board - Control and protection PLC (siemens) 6" touch panel Thermal and Magnetic protection Differential Protection tested

MILESTONE M2 DEVIATIONS For Arava Demo Site it will be neccesary a bigger container that the mention at first (20 ´ container). It will be necessary a 40´ container. With this one, there is a free space that can be use to install part of pretreatment equipment for RO system concerning WP3. For KOTO and Archimede Demo Sites it´s not expected any big change. ACTIONS Arava has confirmed that there is not problem with the 40´ container. Continue working on technical detail to begin manufacture period during next month. Some parts and equipments have been already order because of summer holidays period will delay our plan. Possibility to speed up with the delivery of pumping station chest for KOTO. ADDITIONAL DATA REQUIRED. Coordination with WP3 in order to study possibility to include pretreatment equipments for RO system in containers for Arava and KOTO.

Thanks for listening! Antonio Aparici ingenieria@biboaqua.es www.biboaqua.es Pol. Ind. Tejerías- C/ Villanueva, 12 26500 Calahorra (La Rioja) Spain