API 2017 Exploration and Production Winter Standards Meeting

Slides:



Advertisements
Similar presentations
MICHAEL MARINO CSC 101 Whats New in Office Office Live Workspace 3 new things about Office Live Workspace are: Anywhere Access Store Microsoft.
Advertisements

SPE WITSML: Technology to Business (T2B) for the Oilfield J
2013 Exploration & Production Standards Conference Subcommittee 10 June 25 & 26, 2013 Capitol Hyatt Regency Washington D.C.
Microsoft Visio is diagramming software for Microsoft Windows. It uses vector graphics to create diagrams. The 2007 Standard and Professional editions.
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
Working with SharePoint Document Libraries. What are document libraries? Document libraries are collections of files that you can share with team members.
January 26, 2011 TG 3: Oil Mud Testing Procedures While we welcome open participation, non- task group members are asked to hold questions and comments.
GE Oil & Gas Drilling & Production API SUBCOMMITTEE 6 WORK GROUP ON API SPEC 6A May 2009 Westminster, Colorado.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
June 29, 2011 TG3: Oil Mud Testing Procedures Report To SC13 Exploration & Production Summer Standards Meeting Hyatt Regency San Francisco, California.
Operational Excellence in Effort Reporting Conference Call: March 14, 2012 Vision Statement: Implement a compliant, streamlined, electronic effort reporting.
Development of an API Specification for Float Equipment API Spec 10 F.
BRIDGE DESIGN & RATING REPORTS TECHNICAL ADVISORY GROUP (RTAG) Amjad Waheed, PE 2014 RADBUG Presentation Traverse City, Michigan August 13, 2014.
Doc.: IEEE /527r1 Submission November 2001 John Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks (WPANs)
API SC18 Work Group 2 API Exploration & Production Standards Conference on Oilfield Equipment and Materials Westminster, Colorado June 23, 2009 Ed Durante.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
SC8 Liaison Report 2014 Exploration & Production Standards Conference API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
Doc.: IEEE /0252r1 Submission May 2004 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
SharePoint 2010 Key Parts to Navigation Shared Document Library Add/Remove item from Quick Launch Using the Search Choose a Topic.
IEEE/PCIC Subsea Electrical Working Group Committee Standards Development P61886 & P Working Group Meetings Location: PCIC 2015 Conference – Hilton.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
Using Annotation to Drive Ontology Development. Comprehensive Annotation can Drive Ontology Development Blood Pressure Regulation Real-world Example.
WS 9-1 ANSYS, Inc. Proprietary © 2009 ANSYS, Inc. All rights reserved. February 27, 2009 Inventory # Workshop 9 Taylor Impact Test – “What if” Study.
January 26, 2011 TG3: Oil Mud Testing Procedures Report To SC13 Exploration & Production Winter Standards Meeting Renaissance Worthington Hotel, Fort Worth,
2016 E&P Winter Standards Meeting API 10D Re-Write Work Group Austin, Tx Jan 18-22, 2016.
2016 Exploration & Production Winter Standards Conference Subcommittee Workgroup formed to address rewrite:
API 19 CI Chemical Injection Devices for Downhole Applications
API 2016 Exploration & Production Standards
API 19 CI Chemical Injection Devices for Downhole Applications
SharePoint 101 – An Overview of SharePoint 2010, 2013 and Office 365
API Subcommittee on Well Cements (SC-10) Triaxial Mechanical Properties Testing of Oilwell Cements 2017 Winter Meeting Progress Report.
API SC 10, Work Group 13 Update:
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
API SC 10, Work Group Update:
Chapter 9: Project Communications Management
LMEvents SharePoint Portal How-to Guide
Patricia Méndez Lorenzo ALICE Offline Week CERN, 13th July 2007
TG Chair: Mark Brinsden Shell
Task Group 19LH Liner Hanger Equipment
WG05: Well Abandonments CSOEM – SC 10 – Subcommittee on Well Cements
API Subcommittee on Well Cements (SC-10) Triaxial Mechanical Properties Testing of Oilwell Cements 2016 Summer Meeting Report.
API SC 10 Task Group on Stage Cementing Collars TG Charge Proposal
Membership/Post Processing - Process Membership
SC-10 Oil Well Cements WG-08; Static Gel Strength Testing Phase IV
Status Update on API 16Q / 16R / 16F
City of McCall Water Rate Study – Draft Rate Recommendations
2016 Exploration & Production Standards Conference Subcommittee 10
Submission Title: [WG-TG3 Closing Report Nov03]
Delivering electronic data via Reportnet Central Data Repository
Inovonics Wireless Corporation
Software Vulnerability Group Status update
2016 Exploration & Production Winter Standards Meeting Subcommittee 10
API 17P TASK GROUP January, 2015.
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API 17H TASK GROUP January , 2014.
API 17P SUBSEA STRUCTURES & MANIFOLDS
API 17P SUBSEA STRUCTURES & MANIFOLDS
Some Stuff You Need to Know
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
TGn Chair’s Status Update
WG on Composite Cements: Calgary Meeting 2017
2016 Exploration & Production Summer Standards Conference
TAG Agenda – April 6th 2006 Minutes from last TAG meeting – 13.45
API 10 F.
API SC 10 WG15 Stage Cementing Collars
API 17H TASK GROUP January, 2015.
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API SC 10 Cooperative Testing Program 2018 Dyckerhoff Class G sample preparation and distribution API Summer Conference June 12th,
API 17H TASK GROUP June 26, 2013.
2018 Exploration & Production Summer Standards Meeting Subcommittee 10
Presentation transcript:

API 2017 Exploration and Production Winter Standards Meeting January 16 - 20 API 10D Re-Write Work Group, Update Austin Tx January, 2017

Work group on Bow Spring Centralizers (SC-10D) January, 2017: Winter Meeting – Austin TX Work Group Charge Review and update API Spec 10D to include performance testing requirements for centralizers that are to be used in applications where they are run through restrictions that are smaller than the hole size in which they are to be set. 2

WG 10D Roster 24 active members/alts 3 John E. Hebert - Blackhawk ST John.e.hebert@blackhawkst.com 130 Equity Blvd. Houma, La 70363-8364 985 226 9260 Chris Jordan - Blackhawk ST Chris.jordan@blackhawkst.com 11936 Brittmoore Park Dr. Houston, Tx 77041 713 466 4200 Matthew Goodine – BP Matthew.goodine@bp.com 501 Westlake Blvd. Houston, Tx 77079 832 294 7778 Brent Lirette – Antelope Oil Tools Co. Brent.lirette@antelopeoiltool.com 281 639 5564 K.K. (Karl) LaFleur - LaFleur Properties L.C klafleur@lafleurproperties.com 817 3136752 3

WG 10D Roster (p2.) 4 Alfredo Sanchez – Top-Co alfredo.sanchez@top-co.ca 817 901 9276 David Laurel – Baker Hughes david.laurel@bakerhughes.com Philip Dufrene – Weatherford philip.dufrene@weatherford.com 179 Weatherford Dr. Houma, La 70395 985 493 6266 Max Rodrigue – Weatherford Maxime.rodrigue@weatherford.com 985 493 6233 4

WG 10D Roster (p3.) 5 Charles C Buford Jr– Baker Hughes Charles.buford@bakerhughes.com Hank Rogers – CE consulting ceconsulting@cox.net Lonnie Helms– Halliburton Lonnie.Helms@Halliburton.com Keith Harless - Gryphon David Poole – Chevron david.poole@chevron.com George Fuller – Shell Geroge.fuller@shell.com James Heathman James.Heathman@shell.com Wesley Johnson – Downhole Products Wesley.johnson@downholeusa.com Downhole Products 4140 World Houston Parkway Suite 160 Houston TX 77032 Cell 832 316 7700 5

WG 10D Roster (p4.) 6 Andy Boulcott – CenTek Group Andy.boulcott@centekgroup.com Paul Joyce – CenTek Group Paul.joyce@centekgroup.com Brandon Bourg – Weatherford brandon.bourg@weatherford.com Graham Hay – Downhole Products graham.hay@downholeusa.com Michael Szymanski – Shell Michael.szymanski@shell.com Forest Parker – Weatherford Forrest.parker@weatherford.com Ivan Barannikow – Weatherford Ivan.Barannikow@weatherford.com John McCormick – PVI software jmccormick@pvisoftware.com 6

Work group on Bow Spring Centralizers (SC-10D) Jan 2017: Winter Meetings – Austin, TX Work Group Status Last met as a WG on November 2nd, 2016 at the API office in Houston. Minutes of the meeting have been published to the API SharePoint site and distributed to members of the work group via e-mail. 7

Work group on Bow Spring Centralizers (SC-10D) Jan 2017: Winter Meeting – Austin TX Work Group Status Since the June meetings, all archive files including iterations of the working document and meeting minutes as well as conference presentations have been uploaded to the API SharePoint site (per year folder structure). 8

Work group on Bow Spring Centralizers (SC-10D) January, 2017: Winter Meeting – Austin TX 10D Document Status Decision on Table 1 has been made, update to the working document is pending reformatting of the table itself. Basically, limited additional sizes added to Table 1 and in-between sizes can be interpolated while sizes outside the covered range will use formula to determine value. The tolerance on the ID of the outer pipe has been updated to improve test results as well as eliminate a loop hole for use as restriction (was +0.125” - 0.031”, now is +0.031” -0.000”). Awaiting responses of a few outstanding action items from Work Group members 9

10D Work Group – document status continued: More discussion was had on the potential impact to restoring force of running the centralizers through the restriction abruptly verses in a staged step-down method (from uncompressed OD to intermediate ID to restriction ID) versus a single step procedure (uncompressed OD directly into restriction ID): It was decided to let a study of the effect on restoring force decide if it is warranted to put in the standard or not. If the difference in restoring force is > the 15% variation, then we will develop and include a modified test procedure for under reamed application. This will allow for stage restriction to prevent permanent deformation to the bows brought about from the high starting force condition.    10

10D Work Group – Decision was made to add the proposed reporting format to the document as an example of suggested reporting for use in the modeling software. 11

10D Work Group – document status continued Basically Table 1 is done Definitions are close Test procedures are ready (only awaiting impact study) Pass Fail criterion is clear for both applications (still uses 67% data point and standard conditions) Reporting format resolved and compatible with modeling software We just need to word smith proposed reporting format ….. 12

API 2017 Winter Meetings Jan 17, 2017 Austin TX Questions?