A. Denker, C. Rethfeldt, J. Röhrich,

Slides:



Advertisements
Similar presentations
A. Denker, C. Rethfeldt, J. Röhrich, Helmholtz-Zentrum Berlin, Protons for Therapy Reliability of the Facility for Proton Therapy of the Helmholtz-Zentrum.
Advertisements

Cyclotron Refurbishing & Development Meeting March 6, 2008.
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
UPS Improvements to Beam Availability at the Australian Synchrotron Light Source Don McGilvery.
An Advanced Linear Accelerator Facility for Microelectronic Dose Rate Studies P.E. Sokol and S.Y.Lee Indiana University.
FNAL Linac Downtime Overview Proton Source Workshop Fernanda G. Garcia Accelerator Division Proton Source Department December 7-8, 2010
Courtney Knaup Emporia State University REU 2007 Cyclotron Institute, Texas A&M University Advisor: Dr. Henry Clark Upon completion of the recommissioning.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
Proton Source Task Shutdown 2014 RFQ Injection Linac Tank 1 to 2 emmittance probe and Collimator NTF Beam Line Repair 400 MeV Turbo Station Replacement.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
FFAG Fixed Field Alternating Gradient synchrotrons, FFAGs, combine some of the main advantages of both cyclotrons and synchrotrons:  Fixed magnetic field.
Richard Pardo Argonne National Laboratory ATLAS Operations ATLAS User’s Meeting August 14, 2009.
WAO, Trieste, 24th - 28th September 2007 An Overview of the Reliability and the Fault Trends of the SRS Cheryl Hodgkinson Daresbury Laboratory Synchrotron.
NON-SCALING FFAGs: questions needing answers Andy Wolski The Cockcroft Institute, and the University of Liverpool Department of Physics. BASROC-CONFORM.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
Challenges of Dual Harmonic RF Systems ISIS Synchrotron Group John Thomason.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
0 Plenty Energy Clean Environment Healthy Life Commissioning and Initial Operation of the KOMAC 100-MeV Proton Linac KOMAC / KAERI Kyung-Tae Seol
The Operation of the Tevatron Vacuum system Authors David Augustine Alex Chen Scott McCormick 1.
Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September Paco Sanchez, RF Group, CELLS (Consortium for.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
PEP-II Reliability and Uptime Roger Erickson 13 October 2003 With thanks to C.W. Allen, W. Colocho, P. Schuh, M. Stanek, and the Operations staff members.
13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 1 How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD.
Cyclone 70 IBA Radiopharma’s high energy, high current cyclotron.
H4F Physics Day 2014 C.Ullmann Proton injector status for FAIR and measurements at BETSI test bench (CEA/Saclay) 2014.
Improved performance of Variable Energy Cyclotron(VEC) Variable Energy Cyclotron Centre Kolkata P S Chakraborty, B Ch Mandal, S K Thakur, M Das, S Som,
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
Jørgen S. Nielsen Center for Storage Ring Facilities (ISA) Aarhus University Denmark ESLS XXIII (24-25/ ), ASTRID2 facility 1.
Friday, Feb 12, 2010 Accelerator Status1 Accelerator Week in Review Part I: Regular 9am Scheduling Meeting –Crew Chief Summary –24 hour machine summaries.
Ion Accelerator Activities at VECC
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
0 Ion Beam Facilities at KOMAC Chan Young Lee on behalf of KOMAC Chan Young Lee on behalf of KOMAC ICABU2014, November 12~14,
Operation Status of the RF Systems and Taiwan Photon Source
Report Technical Director Storage-Ring-Installation Completed
HMS Status Steven Lassiter Jan 20, 2017.
Preparation Phase of the FAIR Project
Report Technical Director Storage-Ring-Installation Completed
Challenges of Dual Harmonic RF Systems
Accelerator control at iThemba LABS
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
Machine operation and daily maintenance management in SOLEIL
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
MeV Ion Microbeams and Radiation Biology at the University of Surrey
Accelerator layout > 1000 components (almost 300 magnets and power converters, 153 beam diagnostic devices, about 400m of vacuum pipes, a not neglectable.
The LHC - Status Is COLD Is almost fully commissioned
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
RF operation of REX-ISOLDE
Summary Friday h38: Ramp down and pre-cycle.
Alexander Herlert, CERN (PH-SME-IS)
Summary of ion week 48 Last beam OP summary of 2010 Week 48
Absolute energy calibration of
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
The Fermi National Accelerator Laboratory is a U. S
How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD
PEP-II RF System Status and Upgrades
Operations Department
Advanced Research Electron Accelerator Laboratory
SLHC-PP kick-off meeting, CERN 9 April 2008
Physics Design on Injector I
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
ISRC and LEBT Vacuum System Design
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Ion Source and LEBT Beam Diagnostics
(Beam) Commissioning Plan
Operation of Target Safety System (TSS)
IOT operation in the SPS Long term experience TWC 800 MHz
A world of hope through accelerator- based science and technologies.
Presentation transcript:

Reliability of the Facility for Proton Therapy of the Helmholtz-Zentrum Berlin A. Denker, C. Rethfeldt, J. Röhrich, Helmholtz-Zentrum Berlin, Protons for Therapy

+ = largest non-university research centre in Berlin BESSY (synchrotron) + = largest non-university research centre in Berlin Hahn-Meitner-Institut (reactor, cyclotron, solar energy)

History 1977: start of cyclotron operation for nuclear physics (VICKSI) 1995 – 2006: Ionenstrahllabor ISL – laboratory for ion beam applications internal and external (~ 70%) users ion energy: eV < Eion< 800 MeV research areas: materials modification and ion-solid-interaction materials analysis medical applications since 2007: accelerator operation for therapy purposes only

Accelerator Layout 5.5 MV Van-de-Graaff 2 x 14.5 GHz ECR sources on 150 kV platforms RFQ 16 dedicated target stations k = 132

Accelerator Performance cyclotron in operation since 1977 averaged downtime before 1995: 10 % start of therapy start of RFQ operation for users

Reduction of Downtime step by step process addressing all subsystems: sources, injectors, beam lines, cyclotron, control system preventive maintenance increased redundancy modernisation improved diagnosis reduction of elements

Preventive Maintenance regular belt change of Van-de-Graaff service of rotating parts cyclic change of spare power supplies used on HV terminal drying of SF6 gas cleaning of isolators service on vacuum pumps: oil, bearings replacement of water tubes

Modernisation new computers for control system replacement of old dipole power supplies exchange of shunt against transducer regulation in quadrupole power supplies (gain in stability: factor 10) discrete rectifiers replaced by complete 3-phase modules replacement of main coil power supply of cyclotron side effect: less energy consumption

Redundancy / Reduction of elements smaller variety of pumps, vacuum gauges, power supplies…. whenever possible: spare parts for quick exchange low intensity proton beams: no pre-bunching no water cooling of deflector plates in beam line dipoles

Improved Diagnostics display of accelerator status

Improved Diagnostics display of accelerator status 24 h charts start of main magnet overshoot procedure

Improved Diagnostics display of accelerator status 24 h charts beam stability programme

ISL  Protons for Therapy (PT) 11/04: decision to close ISL at the end of 2006 Post-Docs and technical staff on temporary positions left people were transferred to other departments stop of investments 9/06: start of planning operation solely for PT reduced man-power (less beam-time) reduction of beam lines, cables… this step: almost completed nevertheless: maintain reliability

Accelerator Performance small number of beam time hours: major events have huge impact on statistics ~ 4500 hours/year ~ 1750 hours/year

ISL  PT: Operation Comparison changing ion species and energies ~ 15 target stations varying requirements on focusing 34 weeks/year 3 shifts a day (24/24) H, 68 MeV cyclotron fixed frequency one NMR-probe/dipole 2 target stations, identical focusing 1/4 of existing beam line system 12 therapy weeks/year 2 shift operation (6:00 -22:00) Thursday: start up and tuning Friday: quality control of accelerator weekend: standby* Monday-Friday: Therapy exceptions on weekends: - experiments - infants, requiring more than 4 sessions

PT: Reliability availability 95 % in 2007 2/3 of downtime due to one major event: electrostatic injection preventive maintenance replacement of Ta shields by Ti (good experience in ECR source) after one week: failure fault of new ceramics ? Ti shields (now Ta again) delay of 2 days uptime 2008: 98 % worst case: failure in electricity supply at 6:00 am delay of 2 hours

Accelerator Operation: Reliability uptime 2009: 95 % 1/3 of downtime again due to one major event: water leak in RF interruption of therapy week for the first time since 1998 (110 therapy weeks) availability 2010: 95 % frequent drops in RF error difficult to find: isolator problems on tube socket of anode power supply

Lessons Learned turbo pumps on 60 % of rotational speed (standby mode) increases service intervals about factor 5 analysis of residual gas for water logging of electricity for failure analysis cryo pumps on cryo pumps off

Wish List Uninteruptable Power supplies: overall solution: too expensive in investment and man power thus only for computers of control system counter on frequently moved Faraday cups

ISL  PT: Installation of a Tandetron further shortening of beam lines less rooms reduction of radiation safety easy and reliable operation: no moving parts source on “ground potential” installation: Apr. 07: purchased from BAM, start of dismantling Oct. 07: transfer to HMI, installation starts Sep. 08: first beam from source Oct. 08: first beam through tandetron Mar. 09: first beam through cyclotron Aug. 10: acceptance test finished, applied for licence Dec. 10: licence granted Jan. 11: first therapy with tandetron as injector

ISL  PT: Installation of a Tandetron start of tandetron beam tests: perfect short term stability measured on FC behind cyclotron

ISL  PT: Installation of a Tandetron start of tandetron beam tests: perfect short term stability but long term stability unsatisfactory

ISL  PT: Installation of a Tandetron start of tandetron beam tests: long term stability unsatisfactory now: short and long term stability better than 5 %

Conclusion 12 therapy weeks per year past years: uptime at least 95 % 85% choroidal melanomas 97% tumour control iris melanomas and haemangiomas: no recidives

Thank you for your attention! Conclusion 12 therapy weeks per year past years: uptime at least 95 % but: the finest hardware is useless without dedicated personnel → sincere thanks to all the people involved Thank you for your attention!