Ion Profile Monitors _ 2017 Jim Zagel GSI - IPM17 Workshop

Slides:



Advertisements
Similar presentations
MTest Facility Low Energy Beam Erik Ramberg AEM 15 October, 2007.
Advertisements

Proton Beam Measurements in the Recycler Duncan Scott On Behalf of the Main Injector Group.
FNAL Emittance Devices Flying Wires (FW) Sync Lite Ion Profile Monitors (IPM) aah,6/20/2000.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Testing and Development of Feed-Forward System for ATF2 A. Kalinin Accelerator Science and Technology Centre, Daresbury Laboratory, UK Fifth ATF2 Project.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
1 Electron Cloud Measurements at the Fermilab Main Injector Bob Zwaska Fermilab ECloud07 Workshop April 9, 2007.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Instrumentation Specifications July 26, 2001 S. Childress Page 1 NuMI Specifications for NuMI Primary Beam Instrumentation.
Craig Drennan Linac and Booster Beam Diagnostics Proton Source Workshop December 7 and 8, 2010.
March 2, 2007ELC Experience with clearing voltages and solenoids at SPS damper pick-ups W. Hofle Acknowledgements PS-OP, SL-OP, SL-BI LHC-VAC, SL-HRF.
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
SPS scrubbing experience: electron cloud observables L. Mether on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, September 8, 2015.
Digital Signal Processing and Generation for a DC Current Transformer for Particle Accelerators Silvia Zorzetti.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status.
Uli Raich CERN BE/BI Instrumentation for the new H - Source Test Bench Linac-4 Ion Source Review 2011 Uli Raich CERN BE/BI Linac 4 ion source review, CERN.
Horz V1 H1 H2 V2 Pbars in Recycler Ring Stripline Kickers Split Plate Pickups A-B Vertical Digital Damper Vert Recycler Transverse Damper System Similar.
Figure 2 gives an overview of the hardware components of the upgraded Main Injector BPM system. The figure shows 2 signal channels which produce one position.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
3/14/2007AD/Instrumentation Department Jim Zagel 1 MFW Update 3/14/07 Latest problems RFT Looses Phase Lock –Real 53 MHz connected to the RFT at MI-10.
1 ATF2 Q BPM electronics Specification (Y. Honda, ) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics.
Status of Profile Fermilab 11 June 2013 Jim Zagel & Randy Thurman-Keup.
F Beam Line Tuners Vic Scarpine Instrumentation DoE Review Oct 28-31, 2002.
S. Pordes - to part of CD 09/10/031 Introduction to some Beams Division jargon in some order…see how far we get:
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
High Bandwidth damper Input from W.Hölfe Acknowledgement to all collaborators at SLAC, INFN, LBNL and CERNL Presentation of recent MD results (J.Cesaratto):
Observations of electrons in the Intense Pulse Neutron Source (IPNS) Rapid Cycling Synchrotron (RCS) J. C. Dooling, F. R. Brumwell, W. S. Czyz, K.C. Harkay,
D. Still-FNAL/Tevatron HALO '03 Tevatron Collider II Halo Removal System Dean Still Fermilab Tevatron Department 5/21/2003 Motives for the Collider Run.
TEVATRON IONIZATION PROFILE MONITOR Andreas Jansson Fermilab.
Proton Plan PMG 9/27/07 E Prebys 1 Proton Plan Status Eric Prebys.
IPM EM Simulations 9 th DITANET Topical Workshop on Non-Invasive Beam Size Measurement for High Brightness Proton and Heavy Ion Accelerators April.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Craig Drennan Linac and Booster Beam Diagnostics Proton Source Workshop December 7 and 8, 2010.
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
9/25/2006All experimenters meetingA. Jansson 1 Tevatron Ionization Profile Monitors Andreas Jansson.
10/5/2005 jrz1 Not quite “All” you want to know about Flying Wires At Fermilab Jim Zagel 10/5/2005.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
Simulation of the new PS EC detector: implementation and results A. Romano, G. Iadarola, G. Rumolo LIU-PS Student Day 20 April 2015.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Measurements of Intense Proton Beams using Optical Transition Radiation Vic Scarpine, Fermilab TIPP 2011 Chicago, IL June 10, 2011.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
Tevatron Beam Position Monitor Upgrade Stephen Wolbers (for the Tevatron BPM Upgrade Project) PAC05, Knoxville, TN May 16-20, 2005.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
MI/RR Operation Status Ioanis Kourbanis August 21, 2014.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
10/3/2003Andreas Jansson - Tevatron IPM review1 Tevatron IPM Proposed design.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
IPM Simulations at Fermilab 3-4 March 2016 Randy Thurman-Keup.
News from J-PARC: the system, the data and the simulation code
Alexander Aleksandrov Spallation Neutron Source Oak Ridge, USA
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
E-beam scanner experience at FNAL
Summary of experience with Tevatron synchrotron light diagnostics
Summary of experience with IPM measurements at BNL-RHIC
Proposals of new electron cloud monitor in the PS
Beam Tests of Ionization Chambers for the NuMI Neutrino Beam Monitoring System MINOS.
Yoshinori Sato (IPNS/KEK) for J-PARC Hadron Group
Non-invasive Beam Position Monitor Research in HUST-PTF
Undulator Cavity BPM Status
Pulsed electron beam cooling experiments: data & preliminary results
Presentation transcript:

Ion Profile Monitors _ 2017 Jim Zagel GSI - IPM17 Workshop 21-24 May 2017

5/21/2017 Jim Zagel | GSI

Fermilab Campus Main Injector and Recycler IPM’s Booster IPM’s 5/21/2017 Jim Zagel | GSI

Accelerators at Fermilab Booster Main Injector Recycler 5/21/2017 Jim Zagel | GSI

Beam On Display 5/21/2017 Jim Zagel | GSI

Booster IPM Location Booster Layout PDF New Booster IPM Installation this summer Existing Booster IPM Installation Booster Layout PDF http://www-bd.fnal.gov/proton/booster/BoosterLayout.pdf 5/21/2017 Jim Zagel | GSI

Existing Booster IPM Originally installed ~1990’s in Booster as W Graves PHD project. 8KV Clearing Field 7 5/21/2017 Jim Zagel | GSI

New Booster IPM Can Assembly for Long 4 Main Ring IPMs were reconfigured to use in Booster. 30KV designed to give a good measurement over entire Booster cycle Will be installed this shutdown. 40 Strips spaced at 1.5mm pitch Flash Test Strip added Large Aperture 5/21/2017 Jim Zagel | GSI

New Booster IPM Can Assembly Vacuum Certified Awaiting Installation this summer 5/21/2017 Jim Zagel | GSI

IPM Installations Recycler Vertical at Q103 Recycler Horizontal At Q105 Main Injector Vertical at Q103 Main Injector Horizontal at Q104 10 5/21/2017 Jim Zagel | GSI Jim Zagel | GSI

Tevatron IPM Used to measure 36 Proton and 36 Anti-Proton bunches per turn using QIE Chips in tunnel. Horizontal Detector Horizontal Correction Magnet 5/21/2017 Jim Zagel | GSI

Main Injector IPM Discoloration Some time after installation, with lots of beam having been exposed, we notice some slight discoloration on the supporting structures and on the beam side of the MCP. 5/21/2017 Jim Zagel | GSI

IPM MCP Scan June 2016 Scan Independent up and downstream +/- 25mm in horizontal plane for alignment and MCP Exposure. Allows us to maximize MCP Life. March 2017 Scan Upstream Slide is binding as we approach 300mils off center. We will replace both slides with a more robust/rad-hard version this summer. 5/21/2017 Jim Zagel | GSI

IPM Scan Plots After Move 5/21/2017 Jim Zagel | GSI

IPM Scan Data Yields Relative S/N 5/21/2017 Jim Zagel | GSI

Main Injector IPM Control Grid 5/21/2017 Jim Zagel | GSI

Control Grid Demonstration Test R4H Control of electrons allowed to hit MCP. Turn off Turn on 5/21/2017 Jim Zagel | GSI

MCP Test Chamber EGN Scan Facility to scan MCPs for suitability and look at areas of reduced gain EGN Scan Using an Electron Generator to provide a uniform signal for testing MCP’s. Unfortunately the EGN is anything but uniform. Lots of shot noise over time 5/21/2017 Jim Zagel | GSI

MCP Test Chamber Using a Nude Ion Gauge filament to provide a steady controllable source of electrons New 3” Filament 1.5” Filament Installed 5/21/2017 Jim Zagel | GSI

MCP Test Chamber Work Continues Filament Controller 5/21/2017 Jim Zagel | GSI

MCP Test Chamber Filament Scan Using a Nude Ion Gauge filament to provide a steady source of electrons First test mounting filaments parallel to pick-up strips for proof of principle Bottom Right, filament perpendicular to pickup strips Filament 2 Parallel Filament 1 Parallel 1.5” Filament 90o Strips at 1mm pitch filament measures approximately .8” = 20.32mm 5/21/2017 Jim Zagel | GSI

MCP Test Chamber 1.5” Filament Scan Using 1.5” Nude Ion Gauge filament to provide a steady source of electrons Filament perpendicular to pickup strips 5/21/2017 Jim Zagel | GSI

MCP Test Chamber Magnet Compensation Initial Signal 3” Filament Scan Filament perpendicular to pickup strips Magnet Compensation Initial Signal 5/21/2017 Jim Zagel | GSI

With Mu Metal Shielding MCP Test Chamber 3” Filament Scan With Mu Metal Shielding 5/21/2017 Jim Zagel | GSI

Thank you for your attention That’s All Folks That is all for now Thank you for your attention 5/21/2017 Jim Zagel | GSI

Extra Material Beyond here, there be Dragons! 5/21/2017 Jim Zagel | GSI

Recent References Dirk Bartkoski, PhD Dissertation: Analysis, Prototyping, and Design of an Ionization Profile Monitor for the Spallation Neutron Source Accumulator Ring, December 2013 https://www.researchgate.net/publication/269393015 Nuclear Instruments and Methods in Physics Research Section A Accelerators Spectrometers Detectors and Associated Equipment 11/2014; 767:379–384. DOI:10.1016/j.nima.2014.09.020 9th Ditanet Topical Workshop on Non-Invasive Beam Size Measurement for High Brightness Proton and Heavy Ion Accelerators, April 2013 https://indico.cern.ch/event/229959/ International Beam Instrumentation Conference (IBIC): September 2015-Melbourne, Australia: http://www.ibic2015.org September 2014-Monterey, California: https://conf-slac.stanford.edu/ibic-2014/ September 2016-Barcelona, Spain: http://www.ibic2016.org/ NEXT: International Beam Instrumentation Conference (IBIC): August 2017-Grand Rapids Michigan: http://www.ibic2017.org/ Note: IBIC of interest is not the INTERNATIONAL CONFERENCE ON INDUSTRIAL BIOTECHNOLOGY 5/21/2017 Jim Zagel | GSI

High Speed Digitizers IPM VME Crate 5/21/2017 Jim Zagel | GSI

High Speed Digitizers Channels Bits Frequency Used on 16 ADC 14 80 MHz Alexei Semenov has designed a series of VME digitizers that are the root of most new instrumentation at Fermilab. Channels Bits Frequency Used on 16 ADC 14 80 MHz IPM, LCLS 8 ADC 125 MHz ATF, General 12 ADC 250 MHz Booster BPM 16 New Booster BPM Feedback System 4 ADC + 4 DAC 250MHz DCCT, Longitudinal Damper Channels Bits Frequency Used on 16 14 80 MHz IPM, LCLS 8 125 MHz ATF, General 12 250 MHz Booster BPM New Booster BPM 5/21/2017 Jim Zagel | GSI

Ionization Profile Monitors 5/21/2017 Jim Zagel | GSI

Anode Strip Board MCP Power Pads 50Ω Flash Test Strip Main Injector/Recycler Details Ceramic Mass terminated connectors. 80% copper, 20% space. MCP Power Pads 50Ω Flash Test Strip 5/21/2017 Jim Zagel | GSI

Anode Strip Board cont’d Beam Size determines # of Strips and Pitch Booster Beam sigma 4.5 mm 48 Strips at 1.5 mm Pitch 1.2E12 to 4.5E12 protons Main Injector/Recycler Beam sigma 4.5 - 1.5 mm 120 Strips at 0.5 mm pitch MI up to 6 booster batches RR slip stack up to 12 batches RR max intensity 5E13 5/21/2017 Jim Zagel | GSI