JACKSONVILLE DISTRICT PROGRAM BRIEF

Slides:



Advertisements
Similar presentations
Everglades Restoration A Program for Integrated Regional Management
Advertisements

Flood the Sugar Cane Farms Now to Save the Estuaries: Is This Feasible ? Water Resources Advisory Commission January 5, 2006 Meeting.
US Army Corps of Engineers BUILDING STRONG ® SAME Tampa Post - JOINT TRAINING and EDUCATION DAY Alan M. Dodd District Commander US Army Corps of Engineers,
US Army Corps of Engineers BUILDING STRONG ® COL Richard P. Pannell District Commander, Galveston District U.S. Army Corps of Engineers United States Army.
Florida Water Forum Everglades Restoration June 3, 2011.
US Army Corps of Engineers BUILDING STRONG ® JACKSONVILLE DISTRICT COASTAL DAMAGE REDUCTION FLOOD DAMAGE REDUCTION NAVIGATION ECOSYSTEM RESTORATIONREGULATORYINTERAGENCY.
Preparing for the Rainy Season SFWMD Operations & Actions.
US Army Corps of Engineers BUILDING STRONG ® Vertical Team Roles & Responsibilities Planning Principles & Procedures – FY11.
US Army Corps of Engineers BUILDING STRONG ® Suburban Flooding: Finding regional solutions to a growing problem Imad Samara Project Manager and Silver.
The South Florida Watershed
Comprehensive Everglades Restoration Plan Picayune Strand Restoration Project Janet Starnes, Principal Project Manager Office of Everglades Policy and.
North Spreader Ecosystem Management Agreement Net Ecosystem Benefit Projects (July 2007 Photo)
Illinois Department of Natural Resources. Illinois Coastal Management Program Illinois was officially approved as a Coastal Management Program on Jan.
CHARLESTONMOBILE WILMINGTON SAVANNAH JACKSONVILLE US Army Corps of Engineers BUILDING STRONG ® NC Water Resources Congress Christine Brayman Deputy For.
One Team Destined For Greatness US Army Corps of Engineers BUILDING STRONG ® Operations Division Mark Yuska Chief, Operations Division.
Bureau of Reclamation Overview Christopher Cutler Deputy Chief Boulder Canyon Operations Office.
Of America’s Everglades & the South Florida Ecosystem the Restoration.
Joint Training and Education Day (JTED) Tampa Bay Post, Society of American Military Engineers Jacksonville District, US Army Corps of Engineers July 23,
USACE South Atlantic Division (SAD) Central & South America
Savannah Harbor Expansion Project
Acme Basin B Discharge Public Workshop May 22, 2002 COMPREHENSIVE EVERGLADES RESTORATION PLAN.
US Army Corps of Engineers BUILDING STRONG ® JACKSONVILLE DISTRICT COASTAL DAMAGE REDUCTION FLOOD DAMAGE REDUCTION NAVIGATION ECOSYSTEM RESTORATIONREGULATORYINTERAGENCY.
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
BUILDING STRONG ® 1 US Army Corps of Engineers BUILDING STRONG ® The RESTORE ACT and other Economic Opportunities 4 September 2013 Alabama Section American.
The South Florida Region and its Water Management System Linda Lindstrom, P.G. Director Environmental Resource Assessment Department South Florida Water.
U.S. Army Corps of Engineers In partnership with the South Florida Water Management District Water Management in South Florida.
EPA and Flood Risk – Programs and Perspectives Rob Wood Acting Deputy Office Director Office of Wetlands, Oceans and Watersheds U.S. Environmental Protection.
Loxahatchee River Watershed Overview 1 st river in Florida designated as a National Wild & Scenic River 1 st river in Florida designated as a National.
WRAC Issues Workshop EAA/STA-2 Expansion Cell 4 April 11, 2005 Acceler8 Overview.
BUILDING STRONG SM Partnering and Coordination to Accomplish the Navigation Mission.
Everglades Land Acquisition Project Michael Sole - Carol Wehle - Dale Brill.
US Army Corps of Engineers BUILDING STRONG ® USACE-IOOS Missions, Priorities, Recommendations Linda Lillycrop IOOC Member USACE Liaison, U.S. IOOS US Army.
Lee County Water Resource Initiative: Community Sustainability Committee June 16, 2010 Kurt Harclerode Operations Manager Lee County Natural Resources.
WRAC Acme Basin B Discharge Project February 2, 2006.
JACKSONVILLE DISTRICT COMMAND BRIEF
Central & Southern Florida Project George Horne Deputy Executive Director Operations & Maintenance Resource Area.
CANADIAN COLUMBIA RIVER FORUM U.S. Flood Control and Operational Perspective Jim Barton, Chief of Corps of Engineers Columbia Basin Water Management Division.
September 18, 2002 Master Recreation Plan Team Kick-Off Meeting Comprehensive Everglades Restoration Plan.
US Army Corps of Engineers BUILDING STRONG ® Mississippi Coastal Improvements Program (MsCIP) “Comprehensive Barrier Island Restoration Plan” PIANC 2012.
Susan Sylvester Department Director Operations Control Department Mechanics of the Primary Water Management System.
South Florida Ecosystem Restoration Projects 1. Seminole Big Cypress 3. Modified Water Deliveries 5. C-111 South Dade 10. C-111 Spreader Canal 13. Broward.
Beth Kacvinsky - Lead Project Manager Office of Everglades Policy and Coordination March 1, 2016 IRL-S / C-44 Overview.
BOCC Special Meeting December 11, RESTORE Act  Clean Water Act grants the Federal EPA authority to impose fines on parties responsible for oil.
Beneficial Use of Dredge Materials: Introduction to Dredging and Policy J. Bailey Smith US Army Corps of Engineers April 4, 2011.
“ To provide leadership to help people conserve, improve, and sustain the natural resources and environment of Highlands County”
Florida Inland Navigation District (FIND) Capabilities and Potential Assistance for Muck Removal in the Indian River Lagoon (IRL) System.
Charleston District US Army Corps of Engineers BUILDING STRONG ® 2016 SAME Savannah Post Annual Program Review.
COASTAL DAMAGE REDUCTION FLOOD DAMAGE REDUCTION NAVIGATION ECOSYSTEM RESTORATIONREGULATORYINTERAGENCY & INTERNATIONAL SERVICES BUILDING STRONG ® US ARMY.
BUILDING STRONG SM Revitalizing and Expanding Partnerships Charles E. Shadie, P.E. Senior Hydraulic Engineer Mississippi Valley Division U.S. Army Corps.
BUILDING STRONG ® As of: POC: JACKSONVILLE DISTRICT PROGRAM SAME SAVANNAH POST Presented by: Mike Rogalski, P.E., PMP Deputy Chief, Programs and Project.
NACD 2010 Orlando Everglades Restoration: Plans, Progress, and Partnerships3.
1 TIF 9 (Trinity River Vision) Expanded and Updated Project and Financing Plans December 8, 2009 Presented to the City Council Jay Chapa Housing & Economic.
Mrs. Sealy - APES.  Coral reefs  Estuaries  Ocean floor  Near coasts  The tropics  The bottom region of the ocean as opposed to the top levels.
Assemblymember Adrin Nazarian
SAME Savannah Post Industry Day 14 June 2017
Savannah River Projects
Treasure Coast Regional Planning Council
JACKSONVILLE DISTRICT Overview
Continuing Authorities Program
Army Engineer Association Engineering & Energy Track 16 June 2015
The Florida Inland Navigation District:
Beneficial Use of Dredged Material
Wednesday March 30th in Okeechobee Thursday March 31st in Clewiston
U. S. Army Corps of Engineers,
Nebraska Water Infrastructure Funding and Financing Programs
Jacksonville district prograM briefiNG
CONSERVATION 20/20 MANAGEMENT AND MANAGEMENT TRUST FUND OVERVIEW
Sacramento Environmental Commission January 2019.
Lower Laguna Madre Estuary Program
Presentation transcript:

JACKSONVILLE DISTRICT PROGRAM BRIEF 2016 SAME Industry Day COL Jason A. Kirk, P.E. Commander and District Engineer Jacksonville District 8 December 2016 “Team of Professionals Making Tomorrow Better” Images: Juxtaposition of urban development and natural environment (Everglades) – illustrates some of the challenges facing CERP and CEPP implementation. Jacksonville Harbor (“We Can’t Wait” project) – Talleyrand Terminal (outside current deepening project – at Mile 20 – serves smaller – Panamax – container ships). U.S. Army Corps of Engineers BUILDING STRONG

JACKSONVILLE DISTRICT…Our Vision: “Team of Professionals Making Tomorrow Better” 4 military 784 civilians engineers biologists planners economists archaeologists attorneys project managers architects ecologists environmental protection specialists geologists hydrologists park rangers surveyors computer experts administrative professionals

U.S. ARMY CORPS OF ENGINEERS | JACKSONVILLE DISTRICT CHAIN OF COMMAND Lieutenant General Todd T. Semonite Chief of Engineers and Commanding General USACE Brigadier General C. David Turner Commander, South Atlantic Division USACE Colonel Jason A. Kirk Commander and District Engineer Jacksonville District, USACE CORPORATE BOARD Tim Murphy Deputy District Engineer Programs & Project Management Lieutenant Colonel Timika Wilson Deputy District Engineer Lieutenant Colonel Jennifer Reynolds Deputy District Engineer South Florida & Antilles Laureen Borochaner Engineering Division Eric Summa Planning Division Steve Duba Construction Division Candida Bronson Operations Division Tim Black Contracting Division John Pax Office of Council B.J. Fagan Resource Management Audrey Ormerod Real Estate Division Donnie Kinard Regulatory Division Ava Benudiz Human Resources 3

Our Mission Areas Navigation Flood/Coastal Storm Risk Management FLOOD RISK MANAGEMENT ECOSYSTEM RESTORATION REGULATORY OPERATIONS LOCKS & DAMS MILITARY SUPPORT REAL ESTATE CONTINGENCY OPERATIONS: EMERGENCY MGM’T COASTAL STORM RISK MANAGEMENT Our Mission Areas Deliver value to the Nation by anticipating needs & collaboratively engineering solutions that support national security, energize our economy, & increase resiliency. Navigation Flood/Coastal Storm Risk Management Ecosystem Restoration Regulatory Operations/Recreation Military/Interagency & International Services Real Estate Contingency Operations INTERAGENCY & INTERNATIONAL SERVICES REGULATORY HERBERT HOOVER DIKE 3. This obligation applies to the USACE Regulatory Program, which implements Section 404 of the Clean Water Act, Sections 9 and 10 of the Rivers and Harbors Act, and Section 103 of the Marine Protection, Research, and Sanctuaries Act. OPERATIONS RECREATION OPERATIONS AQUATIC PLANT CONTROL CONTINGENCY OPERATIONS: MILITARY

Sponsors, Federal Agencies, Associations EXECUTION OF WORK The Work Delivered by: Construction Contractors Unlimited Capability …Perform 100% of Civil Works/Military Architect-Engineer Firms Perform 80% of Military, 40% CW Planning & Design ~33,000 Federal Employees JAX ~790 Sponsors, Federal Agencies, Associations BUILDING STRONG® 5

JACKSONVILLE DISTRICT OFFICES AND AREAS OF RESPONSIBILITY GEORGIA FLORIDA Jacksonville DISTRICT HEADQUARTERS Pensacola Gainesville Panama City Palatka AREAS OF RESPONSIBILITY CIVIL WORKS Portions of Florida and Georgia (defined by watersheds) Puerto Rico and the Antilles REGULATORY Florida REAL ESTATE AND MOBILIZATION Portions of Florida and Georgia FIELD OFFICES Cocoa Tampa Melbourne Sebring West Palm Beach Civil Works in Florida: boundary breaks along the Suwannee River. Real Estate in Florida: boundary breaks at the Apalachicola River Palm Beach Gardens Clewiston Ft. Myers Naples Miami PUERTO RICO ANTILLES San Juan Ponce Mobile District Jacksonville District CIVIL WORKS AREA OF RESPONSIBILITY (FLORIDA AREA) 6

MAJOR CUSTOMERS, STAKEHOLDERS AND PARTNER AGENCIES South Florida Water Management District (SFWMD) Port Authorities (Tampa, Jacksonville, Canaveral, Everglades, Miami, San Juan) Coastal communities (Counties, Cities and Municipalities) Florida Department of Environmental Projection (FDEP) Fort Buchanan (PR) Military Commands: Fort Buchanan (Puerto Rico) and Command Navy Region SE USAID (past work in Haiti and Caribbean) Puerto Rico Department of Natural Environmental Resources (DNER) Department of Interior (including USFWS, US Forest Service and Everglades and Biscayne National Parks) IMAGE: Biscayne National Park Customer Satisfaction BUILDING STRONG® 7

JACKSONVILLE DISTRICT PROGRAMS by Fiscal Year (FY) $ Millions Notes: pictures clockwise from the top: FUDS site excavated, Miami-Dade beach, Kissimmee River Ecosystem Summary does not include SAJ Regulatory Program *FY17 PBUD; all other Fiscal Years reflect actual allocations, $ amounts are in millions

WATER RESOURCES PROGRAM Fiscal Year 2011-2017 $ Millions *FY17 PBUD; all other Fiscal Years reflect actual allocations - JACKSONVILLE HARBOR MIAMI HARBOR PORT EVERGLADES TAMPA HARBOR

OUR MISSION NAVIGATION 900 miles of Inland Waterways 6 navigation locks Intracoastal Waterway (IWW) from Jacksonville to Miami Okeechobee Waterway (OWW) connecting the Atlantic Ocean to the Gulf of Mexico Parts of the Gulf Intracoastal Waterway (GIWW) Harbors 17 Deep Draft Harbors 20 Shallow Draft Harbors JACKSONVILLE HARBOR MIAMI HARBOR PORT EVERGLADES TAMPA HARBOR Deep draft = greater than 15 feet BUILDING STRONG® 10

OUR MISSION FLOOD / COASTAL STORM RISK MANAGEMENT FLOOD RISK MANAGEMENT (FRM) COASTAL STORM RISK MANAGEMENT (CSRM) Cutoff Wall Construction Duval County FLOOD RISK MANAGEMENT 1) Puerto Rico: Cerrillos Dam and Portuguese Dam (Pictured) CAP Program --SAJ currently has 11 CAP Feasibility Studies underway in FL(6) and PR (5) --5 additional CAP studies are awaiting new starts for Feasibility (4 in FL, 1 in PR) --SAJ CAP program is biggest growth area (% wide) in the District with opportunities in future years for design and construction contracts. --SAJ Executed nearly $2-million ($1.93-million)in funding on the CAP Program in FY 2016 COASTAL STORM RISK MANAGEMENT Largest Shore Protection Program in the nation Constructs/maintains over 30% of the Nation’s shore protection projects 17 counties involved Partnership with sponsors and agencies Protects property from flood damage Beneficial for recreation, habitat Herbert Hoover Dike & Lake Okeechobee Duval County Portuguese & Cerrillos Dams, Puerto Rico Herbert Hoover Dike: 143 miles of embankment around Lake Okeechobee, Florida Largest CSRM Program in the Nation BUILDING STRONG® 11

FLOOD RISK MANAGEMENT: PUERTO RICO ARECIBO SAN JUAN CAGUAS PONCE AGUADILLA Puerto Rico ACTIVE PROJECT NO CURRENT ACTIVITY RIO GRANDE DE ARECIBO PORTUGUES & BUCANA RIO GUANAJIBO MAYAGUEZ SAN GERMAN RIO DESCALABRADO RIO NIGUA AT SALINAS RIO GRANDE DE LOIZA RIO PUERTO NUEVO RIO DE LA PLATA (C) RIO CULEBRINAS (CAP SEC 205) (I) RIO GUAMANI RIO MATILDE PIÑONES HWY 187 (CAP SEC 103) CAÑO MARTIN PEÑA LEGEND C: CONSTRUCTION I: INVESTIGATIONS --Completed Portugese Dam in 2013 and turnover to PR/DNER --Current active construction includes construction at the Rio Puerto Nuevo Project --San Juan Harbor Feasibility Study continues --5 Continuing authority program Fesibilitity Studies ongoing (Loiza, Rio Anton Ruiz, Rio Orocovis, San Isidro, Aguacate) --1 additional CAP study awaiting new start approval at San German 12

FLOOD RISK MANAGEMENT Herbert Hoover Dike Fiscal Years 2011-2017 $ Millions *FY17 PBUD; all other Fiscal Years reflect actual allocations,$ amounts are in millions Pictures left to right: Culvert C-16 construction, Culvert C-13 construction, Culvert C-12 construction

OUR MISSION FLOOD RISK MANAGEMENT OKEECHOBEE Indian Prairie Canal BRIGHTON SEMINOLE INDIAN RESERVATION CLEWISTON LAKE HARBOR SOUTH BAY BELLE GLADE St. Lucie Canal LAKE OKEECHOBEE LAKEPORT BUCKHEAD RIDGE PORT MAYACA PAHOKEE Fisheating Creek L-8 L-10 L-14 Hillsborough Canal L-20 North New River Canal L-25 Miami Canal MOORE HAVEN 7 COMMON INUNDATION ZONES B F E D C A G Harney Pond Canal Calooshatchee River Kissimmee River HERBERT HOOVER DIKE 143 miles of embankment around Lake Okeechobee 32 federal culverts 5 spillway inlets 5 spillway outlets 9 navigation locks 9 pump stations No overflow capability Built by hydraulic dredge and fill methods Not acceptable to today’s construction standards BUILDING STRONG® 14

COASTAL STORM RISK MANAGEMENT Largest Shore Protection Program in the Nation Constructs/maintains over 30% of the nation’s shore protection projects 17 Counties involved Partnership with sponsors and agencies Protects infrastructure and property from flood damage Beneficial for recreation, habitat, and economy Major projects include Dade County, Pinellas County, and Brevard County - Jacksonville District has the largest shore protection program in the Nation and constructs/maintains over 30% of the nation’s total shore protection projects. Additionally SAJ has been very successful in placing sand on beaches through sand bypassing projects and beneficial use of dredged material placement. Opportunities: Construction Contracts and Environment Service Contract- resource surveys, geotech field work - To highlight the economic importance, Revenues from tourists in Miami Beach are greater than what the Federal Government spends on beach nourishment for the entire nation (Houston, 2002). Jacksonville District is planning to execute 5-8 projects in FY11 dependent on funds

OUR MISSION COASTAL STORM RISK MANAGEMENT Indian River County St. Lucie County Martin County Brevard County Palm Beach County Dade County St. Johns County Nassau County Duval County Flagler County Volusia County Broward County Monroe County Lee County Sarasota County Manatee County Pinellas County GEORGIA FLORIDA OUR MISSION COASTAL STORM RISK MANAGEMENT The Jacksonville District has the largest shore protection program in the country (17 Counties, >125 miles) Constructs/maintains over 30% of the nation’s shore protection projects Partnership with sponsors and agencies Protects property from flood damage Beneficial for recreation, habitat, and economy COUNTIES WITH PARTICIPATION IN HSDR PROJECTS 16

ECOSYSTEM RESTORATION PROGRAM Fiscal Years 2011-2017 $ Millions - *FY17 PBUD; all other Fiscal Years reflect actual allocations, $ amounts are in millions

OUR MISSION ECOSYSTEM RESTORATION: EVERGLADES RESTORATION Planning in an area twice the size of New Jersey (18,000 square miles) Intense stakeholder interest Competing interests Complexity of problems Everglades National Park New Jersey A 50-50 Partnership between the federal government and the State of Florida 68 Components combined into 56 projects Dependent on foundation projects Expensive ( ~ $ 12.5 B - October 2008) Essential to restoring a functioning ecosystem Essential to sustaining the economy of South Florida Too much/too little water for the Everglades/south Florida ecosystem Massive reductions in wading bird populations Degradation of water quality Repetitive water shortages and salt water intrusion Declining estuary health 1.7 billion gallons of water a day wasted to tide BUILDING STRONG® 18

OUR MISSION ECOSYSTEM RESTORATION: EVERGLADES RESTORATION PROGRESS FOUNDATION PROJECTS KISSIMMEE RIVER RESTORATION C-51/STA-1E C-111 SOUTH DADE SEMINOLE BIG CYPRESS MODIFIED WATER DELIVERIES 1ST GENERATION CERP IRL-S C-44 RESERVOIR/STA SITE 1 IMPOUNDMENT PICAYUNE STRAND MELALEUCA ERADICATION LOXAHATCHEE RIVER WATERSHED RESTORATION LAKE OKEECHOBEE WATERSHED PROJECT WESTERN EVERGLADES RESTORATION PROJECT 2ND GENERATION CERP (WRRDA 2014 authorization) 3rd GENERATION CERP (Requires Authorization) CENTRAL EVERGLADES PLANNING PROJECT PLANNING PHASE BISCAYNE BAY COASTAL WETLANDS PHASE 1 BROWARD COUNTY WATER PRESERVE AREAS C-43 RESERVOIR C-111 SPREADER CANAL Lake Okeechobee CEPP WCA 1 WCA 2 WCA 3 Current versus Restored Flows FY2017 Ecosystems Program 3 new award construction contracts (Biscayne Bay (2), Kissimmee River) totaling $17-million, additional $90-million to be added to contracts that are incrementally funded including IRL-S/C-44 Reservoir construction FY2018 Ecosystems Program 6 new award construction contracts (including Kissimmee River, Broward County WPA) totaling $240-million (this includes Broward Co WPA which will be incrementally funded via the Continuing Contracts Clause). Ongoing construction includes IRL-S C-44 construction, C-11 South Dade and partnering with SFWMD on C-43 West Reservoir construction KRR: more than 40 sq miles of river-floodplain ecosystem will be restored C-51: will send cleaner water into WCA-1 (Lox Nat Wildlife Refuge) C-111 South Dade: will restore natural hydrologic conditions in Taylor Slough and eastern portions of ENP. Increased freshwater flows will improve conditions in Florida Bay MWD: One-mile bridge completed last month, roadway modifications ongoing. This project will ultimately restore more natural flows to the park. Seminole Big Cypress: an important partnership with the Seminole Tribe. This will provide benefits to the native lands. C-44: includes a 50,600 ac-ft reservoir --That’s a little over 16 billion gallons of water (from basin runoff) -- Over 24,000 Olympic swimming pools. This past wet season: C-44 basin runoff: 74,000 ac-ft (19%) Site 1: when complete it will provide supplemental water deliveries, groundwater recharge, reduce seepage, and prevent saltwater intrusion Melaleuca Eradication: this is the construction of a facility as part of a long-term plan to combat exotic & invasive plants in SF Picayune: will restore wetlands in Picayune Strand and in adjacent public lands; other benefits include improving flow to ten thousand islands area, improving water quality, and increased groundwater recharge; includes three pump stations, spreader canals, 40 miles of canal plugs, and removal of 227 miles of roads Broward County WPA: reduce seepage loss from water conservation area (WCA) 3a/3b to the C-11 and C-9 basins; capture, store and distribute surface water runoff from the western C-11 Basin that has been discharged into WCA 3A/3B. C-43: includes a 170,000 ac-ft reservoir -- That’s a little over 55 billion gallons of water (from basin runoff) -- About 84,000 Olympic swimming pools. BBCW PH 1: designed to improve the ecology of Biscayne Bay including the freshwater wetlands, tidal creeks and near shore habitat; C-111 Spreader: provides more natural flows into ENP. CEPP: will send 200,000 ac-ft south ENP 19

MILITARY / INTERAGENCY AND INTERNATIONAL SERVICES Fiscal Years 2011-2017 *F17 Projected; all other Fiscal Years reflect actual funding Reimbursable includes International, Interagency, and Military O&M Navy Dredging, $ amounts are in millions $ Millions - DERP-FUDS Pinecastle Jeep Range USAID-Haiti North Haiti Port 20

OUR MISSION MILITARY / INTERAGENCY & INTERNATIONAL SERVICES MILITARY SUPPORT INTERNATIONAL SUPPORT LEED Certified Antilles Elementary School (Fort Buchanan, Puerto Rico) Formerly Used Defense Sites (FUDS) Underwater Assessment (Culebra, Puerto Rico) & Fuel Tank Removal (Arecibo, Puerto Rico) Failed Bridge Assessment (Haiti) INTERAGENCY SUPPORT National Resources Conservation Service Florida Easement Program - Ecosystem Restoration Invasive Species Management Mosquito Slough Environmental Protection Agency JaxAsh - Superfund Cleanup Oversight 21

MILITARY / INTERAGENCY AND INTERNATIONAL SERVICES OCONUS USAID – NORTH PORT USAID – ECAM USAID – DUMAY DAM HAITI DOMINICAN REPUBLIC USAID – FEEDER RURAL ROADS Caribbean Sea DOMINICA ST. LUCIA ST. VINCENT & THE GRENADINES GRENADA INTERNATIONAL USSOUTHCOM TRINIDAD & TOBAGO

Jacksonville District FY2017 Contracting Opportunities Project Title Project Location Projected Advertise Date Type Work Estimated Award Set-Aside Category Procurement Method SAJ Devils’ Garden Wetland Hendry County 2nd QTR 2017 CONST 237990 $1,000,000- $5,000,000 TBD Based on market research RFP Jacksonville Harbor Deepening Contract A Duval County, FL DREDGING 237960 $25M-$100M UNR IFB Water Control Structure (Culvert replacement) HHD KI 1 and KI 2 Okeechobee County, FL 4th QTR 2017 CIVIL CONST 237990 $25,000,000 -$100,000,000 HHD Reach 1 Cut Off Wall Extension South Bay/Lake Harbor, FL $50,000,000-$75,000,000 Contract 12A - S-69 Weir Kissimmee River FL $10,000,000 - $25,000,000 TBD Based on Market Research Dade County, Sunny Isles Miami-Dade County 3rd QTR 2017 Topographic/Hydrographic Surveying FL Services 541370 3 contracts $3.1mil ea SDVOSB /SBSA Brooks Act OCONUS 1st QTR 2017 2 contracts TBD Based on market research

JACKSONVILLE DISTRICT TAKEAWAYS Largest Ecosystem Restoration Program in the country Largest Coastal Storm Risk Management Program in the country Large and diverse Navigation program Largest dam safety project in the nation (Herbert Hoover Dike) Contributed funds from non-Federal partners including Jacksonville Harbor Milepoint Training Wall Relocation/Reconfiguration of the Mile Point Training Wall Non-federal [local] sponsors are active advocates for their projects at the state and national level Restoration of Great Marsh Island (Milepoint Project) - least cost dredged material management and environmental mitigation Our Team of Professionals couldn’t do it without you. 24

FOR MORE INFORMATION www.saj.usace.army.mil U.S. Army Corps of Engineers | Jacksonville District www.saj.usace.army.mil On Facebook www.facebook.com/JacksonvilleDistrict On YouTube! www.youtube.com/JaxStrong On Twitter www.twitter.com/JaxStrong On Flickr www.flickr.com/photos/jaxstrong Jacksonville District Small Business Specialist: Ms. Beth Myers Elizabeth.R.Myers@usace.army.mil (904) 232-1150 IMAGE: Along Lake Okeechobee Waterway BUILDING STRONG® 25