Report Technical Director Storage-Ring-Installation Completed

Slides:



Advertisements
Similar presentations
SESAME Radiation Safety and PSS Phase I : Microtron + Booster Morteza Mansouri on behalf of Safety group TAC SESAME TAC 2013 : Morteza Mansouri.
Advertisements

New Radiation Safety Interlock System for the SPring-8 Accelerator Complex C. Saji, M. Toko, T. Matsushita, R. Furuta, H. Hanaki, S. Hashimoto 1), Y. Hashimoto,
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
September 15th 2009Olympus technical review at DESY, F.Brinker1 DORIS storage ring Olympus in the IP-region Beam optic, changes on the lattice Beam dimensions,
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
ITS Subsystems Availability MACS Week, June 2011 E. Sargsyan PP a-ESA_ITS_MACS_Week_June2011.pptm E. Sargsyan ITS Subsystems Availability 1.
Status of the SESAME Machine
Maher Attal On behalf of SESAME Team Status of SESAME Synchrotorn-light for Experimental Science and Applications in the Middle East M. Attal, XXII ESLS.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
1 Low-energy RHIC electron Cooler (LEReC) cost estimate December 2, 2014.
P. Spiller, SIS18upgrade, Peter Spiller GSI, Darmstadt Kick off Meeting - EU Construction DIRAC Phase SIS18 upgrade.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
M. Attal, 10 th Technical Advisory Committee Meeting, May 10-11, 2010, Allan, Jordan Synchrotron-light for Experimental Science and Applications in the.
Cavities Auto Recovery with Beam RF&Linac Section - ALBA Accelerators Division Francis Perez Angela Salom.
Contents Overview of 150 MeV FFAG Accelerator
Accelerator Design: the nuts and bolts…and gaskets and resistors Elvin Harms Beams Division/Fermilab
Jørgen S. Nielsen Institute for Storage Ring Facilities (ISA) Aarhus University Denmark 1 ESLS-RF 14 (29-30/9 2010), ASTRID and ASTRID2 new LLRF.
Vertical Emittance Tuning at the Australian Synchrotron Light Source Rohan Dowd Presented by Eugene Tan.
Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September Paco Sanchez, RF Group, CELLS (Consortium for.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
D&D Review 6 August PEP-II Minimal Maintenance State Upkeep Stan Ecklund (J. Seeman, S. DeBarger, D. Kharakh, M. Zurawel)
Canadian Light Source Commissioning Progress CLS Annual Users Meeting –
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Power Supply & Electrical Engineering for sustainable science
PETRA III, A New High Brilliant Light Source At DESY
Stefan Wilke, DESY MHF-e 1 12th ESLS RF Meeting 1 st October, 2008 at DIAMOND Overview and Status of Assembling and Commissioning the RF-System at PETRA.
Machine Operation and Studies at SSRF Wenzhi ZHANG Dec. 16, 2013 Spain.
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
ASTRID2 Niels Hertel Nov 2012 AARHUS UNIVERSITET ASTRID2 – Status ESLS XX Berlin 2012 Niels Hertel ISA, Aarhus University, Denmark 1.
Status of SESAME Synchrotorn-light for Experimental Science and Applications in the Middle East SESAME, Allan, Jordan Maher Attal On behalf of SESAME Team.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
ELENA installation progress F. Butin / ELENA collaboration.
Operation Status of the RF Systems and Taiwan Photon Source
MACHINE OPERATION AT ALBA Montse Pont, CELLS-ALBA 16-18/12/2013.
Areal RF Station A. Vardanyan
Report Technical Director Storage-Ring-Installation Completed
High energy beam transport.
PETRA III at DESY Hamburg/Germany
PETRA III, Status and Upgrade
SESAME Control System Status
Status of HESR 18th March Gießen Dieter Prasuhn.
PHIL: A TEST BEAMLINE AT LAL Specifications of PHIL
STATUS OF THE ALBA SYNCHROTRON LIGHT SOURCE: FROM COMMISSIONING TO OPERATION M.Pont, CELLS-ALBA
SOLEIL EXPERIENCE WITH HIGH POWER SOLID STATE AMPLIFIERS
CLEX Building Layout, Conventional Facilities, TL2, TL2’,
EYETS David Hay EN-OSS.
ELENA installation and commissioning status
Magnet Power Supply System Overview
PLC-based control systems at SOLEIL - ICALEPCS 2017
SESAME Control System Status
Construction and Commissioning of Electronic Test Benches
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
TE/EPC activities for LINAC 2, PSB, PS & TT2 during EYETS
Coupling Correction at the Australian Synchrotron
SESAME-On The Way To Become Real
The SPEAR3 Upgrade Project at SLAC
The SPEAR3 Upgrade Project at SLAC
Estimation and Protection on Synchrotron Radiation in CEPC Main Ring
Machine Operation and Progresses in SSRF
Operation Progress and Upgrade in SSRF
Advanced Research Electron Accelerator Laboratory
Status of the ASTRID2 RF systems
ThomX – Commissioning Meeting – 25/01/2018
Isotope Readiness Review Run Plans
Presentation transcript:

Report Technical Director Storage-Ring-Installation Completed Outline: Status Injector SR-Installation Magnets Vacuum Power Supplies Accelerating Units Fast Magnets Personal Safety System sesame dec 2016

800 MeV Booster-Synchrotron Current at 800 MeV increased from 2.5 to 5 mA Energy 0.022-0.8 GeV Circumference 38.4 m Emittance 170 nmrad Mom.Compaction 0.18 Energy loss (@ .8 GeV) 14 keV Tune h/v 2.2 / 1.3 Beam extracted out of Booster sesame dec 2016

Status 2.5 GeV Storagering Nov 2015 The floor preparation has started The components are coming in First serial components delivered girder, dipoles Girder Support Plates Installation sesame dec 2016

CESSAMag: DC-Magnets and Power Supplies Feb. 2016: First girder, magnets, Vacuum chamber installed with CERN Team sesame dec 2016

Installation completed Nov 2016 16 girder 16 dipoles 64 Quadrupoles 64 Sextupoles 32 Vacuum Chamber 110 Ion-Pumps 750 m water-pipes 12 km cables Apr. 2016: Delivery of Magnets completed May 2016: All Girder installed Jul 2016: Delivery of vacuum chambers completed Aug 2016: All main vacuum chambers installed sesame dec 2016

Installation from top Removal of top layer Installation of girder Installation of dipole Installation of Quadrupoles and sextupoles Removes of upper halves of the magnets Installation of vacuum chamber mounting of upper halves sesame dec 2016

All 133 Power-Supplies Installed No I [A] U [V] DP 1 550 1000 QF 32 300 16 QD 8 SF 2 125 40 SD 80 Corr 64 +/-10 +/-24 Per Quadrant: Quadrupole PS (4x4), Corrector PS (16) Diagnostics (24 BPM) Control (Vacuum, Machine Protection) Gateways at Test Dipole PS sesame dec 2016

SR-Cooling-Pipes Contracted to ALPHA (Jordan) SR & RF: 750 m of pipes DI water for cooling: Magnets 500 kW RF amplifier 250 kW vacuum chamber 125 kW RF cavities 125 kW SR & RF: 750 m of pipes 600 m of welds sesame dec 2016

AC distribution Contracted to TECO Jordan: Cable Trays AC Cabling from Transformer to Racks SR (990 kW) RF( 880 kW) Quadrant 1 607 kW Quadrant 2 100 kW Quadrant 3 100 kW Quadrant 4 183 kW Cavities 720 kW Cool.Rack 80 kW DP (480 kW) QP (52 kW) SP (22 kW) Else (21 kW) Else (32 kW) QP (52 kW) Else (16 kW) Else (32 kW) QP (52 kW) Else (16 kW) Else (32 kW) QP (52 kW) TL2 (83 kW) Else (21 kW) Else (32 kW) sesame dec 2016

Cooling units for cavities 0.1° stability RF-System (Cavities) Cooling units for cavities 0.1° stability Frequency: 499.65 MHz Bandwidth: 1 MHz Shunt impedance: 3.3 MΩ Umax: 600 kV Unloaded Q: 41000 Coupling factor: 2 Cavities during FAT 3 units installed Ok for commissioning Final delivery, installation Jan 2017 sesame dec 2016

RF-Amplifier (500 MHz Solid State) 1 Amplifier delivered by SOLEIL Damaged during Transport 2 Amplifier delivered by SIGMA-PHI One damaged during SAT 2 out of 3 in operation, ok for commissioning Final delivery, installation Jan 2017 Solid-State Amplifier Frequency: 500 MHz Bandwidth 14 MHz Power: 80 kW No modules: 180 Efficiency: 55 % Control Panel for Solid State Amplifier sesame dec 2016

Radiation Safety Personal Safety System contracted to SAM Jordan Safety PLC Allen Bradley, Search buttons Emergency buttons, door Interlocks, fences All installed, tested and working Lead-shielding at ratchet-wall Contracted: 5 additional Radiation Monitors for Gamma & Neutrons PSS rack for SR access sesame dec 2016

Next Steps Commissioning: Beam into SR: Operate TL2 First turn: Use Fluorescent screens, BPM More turns: Measure and correct Tune RF on: Accumulate current, do more diagnostics Start ramping Install all cavities: Accumulate current and ramp Clean up: Correct, replace the provisional solution Do documentation Built up spare parts and test exchange Raised floor Organize maintenance Refurbish Microtron (Electronics) Built up mechanical workshop sesame dec 2016

Thank You For Your Attention We are ready for Commissioning Thank You For Your Attention sesame dec 2016