Distribution Grid and Interconnection Stakeholder Group

Slides:



Advertisements
Similar presentations
RXQ Dual Billing Process Flow Distribution Company Supplier Customer Distribution Company reads meter(s) ( ) Supplier receives and processes.
Advertisements

RXQ Dual Billing Process Flow Distribution Company Supplier Customer Distribution Company reads meter(s) ( ) Supplier receives and processes.
RXQ Dual Billing Process Flow Distribution Company Supplier Customer Distribution Company reads meter(s) ( ) Supplier receives and processes.
Expanded Virtual Net Metering (VNM)
California Public Utilities Commission December 4, 2013
COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.
PowerPoint ® Presentation Chapter 4 System Components and Configurations Components Electricity Sources System Configurations.
SolarCurrents TM Rebuild Ypsilanti Julie Londo August 26, 2010.
SCHEMATICS OF AMM. Market Structure Electricity Flow KESH - GenIPPsIMPORTS EXPORT MARKETS SPPs (Distributed Generators) OST Transmission System Operator.
Smart Energy Campus September 16, Project Overview  Workforce Training  Solar PV  Solar Thermal  Small Scale Wind  Plug-in Hybrid Electric.
By Dale A Gulden, Solar Direct CEO. Solar Electric – Basic Components 1. Modules – solar electric collectors. 3 basic types in the marketplace: Mono crystalline,
PowerPoint ® Presentation Chapter 12 Utility Interconnection Distributed Generation Generators Inverters Interconnection Codes and Standards Interconnection.
PG&E’s General Market Virtual Net Metering Schedule NEMV
Highlights of Commission Activities Little Rock ASHRAE Monthly Meeting October 12, 2011 Presented By: John P. Bethel.
© 2006 San Diego Gas & Electric Company. All copyright and trademark rights reserved. SDG&E’s Sustainable Communities Program and Support for our Solar.
Solar Incentive Program. Solar Technology Overview Sunlight converted to DC electricity by solar panel Solar panels connected to an inverter to create.
AmerenUE SHOW ME SOLAR June 15, 2010 MISSOURI NET METERING AND SOLAR REBATE PROGRAM Lisa Cosgrove – Renewables Specialist.
Distributed Energy Resources Concept Document Discussion ERCOT Staff DREAM Task Force Aug. 25,
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
Renewable Generation Interconnection Ken Brunkenhoefer Distributed Generation Consultant
1 Utility Net Metering Challenges Needing Solutions Jeff Curry Lakeland Electric January 28, 2015.
CUSTOMER OWNED COGENERATION INSTALLATION GUIDELINES.
2015 Fall PR-MR & Marketing Meeting October 16, 2015 Fairo Mitchell Energy Policy Director, Public Utility Division Oklahoma Corporation Commission.
SELF-GENERATION INCENTIVE PROGRAM (SGIP) Website:
State of Solar in North Carolina Amy Heinemann March 7,
ECO SOLUTIONS CANADA CanSIA May 2016 Role and Perspective of the Electricity Distributor.
The time to jump into SOLAR is … NOW! Lindsay Joye, P.E. Solar Program Manager City of Palo Alto Utilities November 5, 2015.
Regulatory Considerations for Deploying Distributed Energy Storage Sky Stanfield, Of Counsel Keyes, Fox & Wiedman LLP July 9, 2015 MA Stakeholder Conference.
Hawai’i Over 77,000 PV systems interconnected or approved statewide. 17% of customers 500+ MW of PV installed Oahu: 32% of single family homes have.
Smart Grid Tariff Changes
Solar, according to Click
Sunverge Energy – SGIP Overview
Future Programs Stakeholder Group
Irvine Ranch Water District Distributed Energy Storage Case Study
Solar in NYC – Pratt SOLAR ENERGY SYSTEMS David Buckner President
Existing/Future Programs and Grid Stakeholder Group
Metering Grid-tie with Battery Backup
Grid Stakeholder Group
SMUD - Whole Foods Energy Storage System
Distributed Generation Chau Nguyen, Pricing & Sales Support
Presented to the NARUC 2013 Winter Meeting
Narragansett Electric Rate Classes
Photovoltaic Systems Engineering Session 21
Existing Programs Stakeholder Group
Clarifying the New PV Value Proposition:
Phase 3 Solar Feasibility Study Findings and Recommendations
Photovoltaic Systems Engineering Session 27
Phase 3 Solar Renewable Energy Initiative - Site Improvements
مراجعـة النظـراء Peer Review
Sahar Rahim MS-Electrical Engineering Supervisor: Dr. Nadeem Javaid
Current as of 12/12/2017 RES-BCT.
DISTRIBUTED GENERATION (DG) MODELING CRITERIA SWEDE 2016
Indian Grid Code and Commissioning Test Procedure Dr
ELECTRICITY AND ENERGY PV METERING/BILLING – NOVEMBER 2017
Net Metering John McComb: P.E.
Elizabeth Hutchison February 26, 2016
2500 R Midtown Sacramento Municipal Utility District
City Council April 30, 2018 Item 13
Agenda Safety Message Timelines Responsibilities of the parties
Net Metering John McComb: P.E.
Long Term Non Firm Capacity Update
Photovoltaic Systems Engineering Session 18 Solar+Storage Systems
Photovoltaic Systems Engineering Application to PV Systems
SMART Program Specific Metering Wiring Diagrams May 2019
Photovoltaic Systems Engineering Session 23
Meeting the challenge: Electrification and Climate Change
RXQ Dual Billing Process Flow
Energy Storage Roadmap & Flexibility Roadmap Information Session
PA Supplier Workshop Net Metering September 10, 2019.
Presentation transcript:

Distribution Grid and Interconnection Stakeholder Group Battery Interconnection November 3, 2016 9 AM – 12 PM (MDT)

Agenda Distribution Grid and Interconnection Stakeholder Group 9 – 9:10 Welcome & Introductions Neil Cowan 9:10 – 9:30 Review of Agenda and Stakeholder Group Charter 9:30 – 9:45 Current Guidance What is it and how does it work? Issues/Questions Robin Kittel / Tom Yohn / Craig Groeling 9:45 – 10:30 Settlement Item #1 Overview Discussion / Questions Facilitated by Robin Kittel 10:30 – 10:45 BREAK   10:45 – 11:45 Settlement Items #2 & #3 11:45 – 12:00 Wrap Review parking lot items and action items. Feedback on Guidance Documents. Schedule next meeting. Neil Cowan 

Electric Storage Used as Backup Power for Net Metered Customers Distribution Grid and Interconnection Stakeholder Group Current Guidance Electric Storage Used as Backup Power for Net Metered Customers

Electric Storage Used as Backup Power for Net Metered Customers Distribution Grid and Interconnection Stakeholder Group Electric Storage Used as Backup Power for Net Metered Customers See Handout. Available online at: https://www.xcelenergy.com/programs_and_rebates/business_programs_and_rebates/renewable_energy_options_business/solar/available_solar_options/on_site_at_your_business/how_to_interconnect

Distribution Grid and Interconnection Stakeholder Group Settlement Item 1 Interconnection of Batteries as Stand-Alone Sources, Parallel Operation for Customers without Generation, and in Parallel with Self-Generation

Distribution Grid and Interconnection Stakeholder Group 1. Customers with stand-alone battery interconnection are not required to have an interconnection agreement with the Company if they are in compliance with NEC 702, obtain an appropriate safety inspection, and can provide verifiable proof that those systems are operated such that they do not serve their main electrical panel. Customers with stand-alone battery interconnections are required to have an interconnection agreement when their system is operated in parallel with the grid by serving their main electrical panel.

Stand-Alone Batteries Distribution Grid and Interconnection Stakeholder Group Stand-Alone Batteries Customer Tariff Residential "R" Commercial "C" C&I "PG, "SG", etc. Meter Standard meter configuration for customers on this tariff Dual bi-directional is standard, can confirm in and out Billing System For "R" and "C" standard meter configurations, any reverse power flow will "advance" meter forward. Interconnection Agreement Not Required Interconnection Review (IR) Developer/customer must submit proof with application and attest that storage does not discharge to the grid. (Note, this is a new requirement for stand-alone) How we monitor compliance Xcel Energy reserves the right to conduct an inspection to verify at a later date if problems arise or other indications of non-compliance are present Other requirements Design should be in conformance with National Electric Code (NEC) Article 702 Standby Power

Distribution Grid and Interconnection Stakeholder Group Batteries in Parallel Customer Tariff Residential "R" Commercial "C" C&I "PG, "SG", etc. Meter Standard meter configuration standard meter configuration Dual bi-directional is standard, which can confirm in and out Billing Requirement For "R" and "C" standard meter configurations, any reverse power flow will "advance" meter forward. Interconnection Agreement Required Interconnection Review (IR) Developer/customer must submit proof with application and attest that storage does not discharge to the grid. How we monitor compliance Do not require a relay

Distribution Grid and Interconnection Stakeholder Group Battery in Parallel with Customer Self-Generation (Non-RES Eligible Generation) Customer Tariff Residential "R" Commercial "C" C&I "PG, "SG", etc. Meter Standard meter configuration for customers on this tariff Dual bi-directional is standard, which can confirm in and out Billing Requirement For "R" and "C" standard meter configurations, any reverse power flow will "advance" meter forward. Interconnection Agreement Required Interconnection Review (IR) Developer/customer must submit proof with application and attests that storage does not discharge to the grid. How we monitor compliance Does not require a relay

Distribution Grid and Interconnection Stakeholder Group Settlement Items 2 &3 Energy Storage Systems Operated in Parallel with Onsite Renewable Generation Connected Under a Net Metering Tariff

Distribution Grid and Interconnection Stakeholder Group 2. The Company will allow an energy storage system that is paired with net energy metering (“NEM”) eligible onsite renewable generation to be operated in parallel with the grid provided that (a) an interconnection review is completed; and either (b) the storage system is charged exclusively by the NEM eligible on-site generation, or (c) the customer can demonstrate the storage system will never export to the grid.11 3. The Company will allow an energy storage system to be located on the same side of the production meter as a NEM eligible onsite renewable generator provided that the storage system is charged exclusively by the onsite renewable generation and that only the production recorded by the production meter will be eligible for REC incentives.

Distribution Grid and Interconnection Stakeholder Group Battery in Parallel - Paired with On-Site RE Settlement Condition 2(b) – Storage System is charged exclusively by NEM eligible On-Site RE. Customer Tariff Residential "R -Schedule PV or NM" Commercial "C - Schedule PV or NM" C&I Schedule PV or NM "PG, "SG", etc. Meter Standard net meter applicable for this tariff Dual bi-directional is standard, which can confirm in and out Billing Requirement Current setup. Customers still export renewable energy. Interconnection Agreement and Review Required Interconnection Review (IR) Requirements Developer/customer submits proof with application, specifies operating modes, and attests that storage does not to discharge to the grid. How we monitor compliance Upfront during I/C Review. No relay required.

Distribution Grid and Interconnection Stakeholder Group Battery in Parallel, Paired with On-Site RE Settlement Condition 2(c) - Customer can demonstrate storage will not export to the grid. Customer Tariff Residential "R -Schedule PV or NM" Commercial "C - Schedule PV or NM" C&I Schedule PV or NM "PG, "SG", etc. Meter Standard net meter applicable for this tariff Dual bi-directional is standard, which can confirm in and out Billing Requirement Current setup. Customers still export renewable energy. Interconnection Agreement and Review Required Interconnection (I/C) Review Requirements Developer/customer submits proof with application, specifies operating modes, and attests that storage does not to discharge to the grid. How we monitor compliance Upfront during I/C Review. No relay required. Upfront during I/C Review. Relay required.

Distribution Grid and Interconnection Stakeholder Group Battery in Parallel - Paired with On-Site RE Settlement Condition 3 – Battery charged exclusively by on-site RE, only production recorded by production meter is eligible for RECS. Customer Tariff Residential "R -Schedule PV" Commercial "C - Schedule PV" C&I Schedule PV "PG, "SG", etc. Meter Standard net meter applicable for this tariff Dual bi-directional is standard, which can confirm in and out Billing Requirement Current setup. Customers still export renewable energy. Interconnection Agreement and Review Required Interconnection (I/C) Review Requirements Developer/customer submits proof with application, specifies operating modes, and attests that storage does not to discharge to the grid. How we monitor compliance Upfront during I/C Review. Other requirements Only production recorded by production meter will be eligible for RECs

Wrap Review parking lot items and action items. Distribution Grid and Interconnection Stakeholder Group Wrap Wrap Review parking lot items and action items. Feedback on Guidance Documents. Schedule next meeting.