2017 ERCOT Strategic Planning Sessions

Slides:



Advertisements
Similar presentations
Westar Energy Smart Grid
Advertisements

Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
1 Grid Modernization – A Strategic Imperative for 2050 Advanced Energy Conference May 1, 2013 By Carl Imhoff Electric Infrastructure Sector Manager Pacific.
Alaska Power Association Annual Meeting August 2009 Visions for a Sustainable Energy Future: Impacts and Choices.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
By Saurabh Sardesai October 2014.
THE TRES AMIGAS SUPERSTATION Southwest Renewable Energy Conference Santa Fe, NMSeptember 16 th 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
1 The Tres Amigas SuperStation VLPGO November 2011.
H.B. “Trip” Doggett President and Chief Executive Officer Tab 4: Proposed 2013 – 2017 Strategic Plan – Redline Board of Directors Strategic Planning Event.
32853 Evaluation of Demand-Response Programs in the Competitive Electric Market Workshop 1 September 15, 2006 Shawnee Claiborn-Pinto.
1 Renewable Technology Working Group (RTWG) July 14, 2009 Henry Durrwachter.
Powering Alberta AESO Annual General Meeting May 14, 2009 Reliable Power Reliable Markets Reliable People.
An Overview of the Smart Grid David K. Owens Chair, AABE Legislative Issues and Public Policy Committee AABE Smart Grid Working Group Webinar September.
Public Meeting on ERCOT’s Proposed 2004 Budget September 3, 2003 Preliminary - Subject to ERCOT Board Approval.
Item 5d Texas RE 2011 Budget Assumptions April 19, Texas RE Preliminary Budget Assumptions Board of Directors and Advisory Committee April 19,
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee August 7, 2008.
A Strawman for Discussion by Dottie Stockstill & Greg Ramon Special ERCOT Board Meeting June 24, 2003.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Smart Grid Schneider Electric Javier Orellana
Business Case NPRR 351 Floyd Trefny Amtec Consulting Brenda Crockett Champion Energy Services.
ERCOT Public 1 Project Panel 1 Dan Woodfin Director, System Operations August 15, 2014.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
December 3, 2013 Technical Advisory Committee (TAC) Update to RMS Kathy Scott December 18, 2013TAC Update to RMS 1.
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
1 The Tres Amigas SuperStation Low Carbon Summit October 22, 2011.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
Regional Implications of the Clean Power Plan Lanny Nickell Midwest Energy Policy Conference October 6 th,
CARILEC. An Association of Electric Utilities CARILEC An Association of Electric Utilities The Caribbean Electric Utility Service Corporation (CARILEC)
Welcome To University Shared Services
2018 LTSA Workshop August 2017 RPG Meeting Welcome to.
Commercial Operations Subcommittee (COPS) Update to RMS 11/1/2016
Wind Management at MISO
Asia-Pacific Energy Regulatory Forum
Appeal of PRS Rejection of NPRR 667
Prepared by: Paritosh Kasotia, Iowa Energy Office, IEDA
TAC Report to the ERCOT Board
Matthew Wittenstein Electricity Analyst, International Energy Agency
A Midsummer Night’s DREAM
Overview of New Control Room Desk
Project Update and Summary of Project Priority List (PPL) Activity
The New Texas Wholesale/Retail Market
Affordable Energy Production from Renewable Fuel
Grid Integration of Intermittent Resources
KORRR INFORMAL STAKEHOLDER WORKSHOP
WG1: RELIABLE, ECONOMIC AND EFFICIENT SMART GRID SYSTEM
Lorenzo Kristov, Ph.D. Principal, Market & Infrastructure Policy
EE5900: Cyber-Physical Systems
Managing Information Technology
RESEARCH, EDUCATION, AND TRAINING FOR THE SMART GRID
Research Program Strategic Plan
The Future of Demand Response in New England
Karen Bartleson, President, IEEE Standards Association
Integration of Variable Generation Task Force (IVGTF) & Emerging Issues Mark Lauby Manager, Reliability Assessments
2013 Long-Term Reliability Assessment and Other Key Assessment Initiatives Briefing.
Jose GONZALEZ PASTOR Economic & Adequacy Analyst - Elia
Integration of Variable Generation Task Force (IVGTF): Status
PacifiCorp-CAISO-NVE EIM Initiative Overview
Byron Woertz, Manager—System Adequacy Planning
Finance & Planning Committee of the San Francisco Health Commission
Byron Woertz, Manager—System Adequacy Planning
Gordon van Welie, President & Chief Executive Officer
Overview Headlines RSP – Progress Overview General progress report
Project Lead Workshop 2 Leading for Impact
July update JANUARY 2019.
The Future Grid and Energy Storage
Energy Storage Roadmap & Flexibility Roadmap Information Session
Projects of Common Interest
Presentation transcript:

2017 ERCOT Strategic Planning Sessions August 2016 ERCOT Public

Agenda Welcome and introductions Obtain feedback on draft 2017 ERCOT strategic goals and key areas of focus Approach to finalize 2017 ERCOT Key Performance Indicators (KPIs) Discuss future strategic planning process

2017 ERCOT Strategic Goals - Draft In support of its mission to serve the public by ensuring a reliable grid, efficient electricity markets, open access and retail choice, ERCOT’s goals are to: Strategically adapt to changing resource mix: Generation Resources Demand Response Distribution Level Resources Provide thought leadership in support of continued improvements to operational reliability and markets Deliver channels and tools to stakeholders for enhanced communication and increased transparency and access Continually enhance our cyber and physical security posture Develop ERCOT resources – people and technology

Draft Strategic Goals & Key Areas of Focus Strategically adapt to changing resource mix Inertia and Ancillary Service needs for changing Resources Reliability Must Run (RMR) process Switchable Generation Resources Distributed Energy Resources Forecasting: Load (short-term and mid-term) Solar Wind Evolve Market Participant and ERCOT staff training

Draft Strategic Goals & Key Areas of Focus Provide thought leadership in support of continued improvements to operational reliability and markets Complete Transmission Planning Review Phasor Measurement Units Real-Time Co-optimization Multi-Interval Real-Time Market Market Restart Sub-synchronous Oscillation Limited Participation Resources Visibility for planning and reliability of dynamic grid

Draft Strategic Goals & Key Areas of Focus Deliver channels and tools to stakeholders for enhanced communication and increased transparency and access Implement online improvements to ERCOT/Market Participant interfaces Outage Scheduler Enhancements Full Interconnection Study process changes Data strategy Data access improvements Report change management Maintain and develop effective Client Services team

Draft Strategic Goals & Key Areas of Focus Continually enhance our cyber and physical security posture Continue progress on Critical Infrastructure Security Roadmap implementation Participate in NERC Grid Ex IV 2017 planning and exercise Continue collaborative Industry/Government efforts on security issues Develop ERCOT resources – people and technology Financial investments and project execution on ERCOT Reliability and Market Systems DC4 Major system upgrades Hardening effort Initiatives to improve management training and employee development Recruit and retain top-flight technical talent

Discuss future strategic planning process Next Steps Review approach to finalize 2017 ERCOT Key Performance Indicators (KPIs) Discuss future strategic planning process Finalize 2017 ERCOT Strategic Goals Strategic planning in 2017

Appendix

Feedback Summary In 2015 and the first half 2016, what did ERCOT do well or what could ERCOT have done better? Well Done or Shown Improvement Including data transparency as a core pillar and allowing it to play a key role in strategic goals. Transmission planning. Support, reporting, and facilitation at Stakeholder meetings. Managing the grid –developing practical solutions to operational and market problems and communicating intentions for addressing challenges. Market training and education programs. Demand Response efforts. Forecasting with continued refinements. Settlements Seminar held on February 20, 2016.

Feedback Summary In 2015 and the first half 2016, what did ERCOT do well or what could ERCOT have done better? Opportunities for Improvement Proactively ensure the fidelity of information used to run the grid and markets; including load forecasts. Continually work to improve the efficiency of the Stakeholder process including Board presence to provide guidance and impart vision to committees and subcommittees. Seek ERCOT Board endorsement of some concepts prior to expending large efforts on them. Allow ERCOT staff to take items to the Board when stakeholders cannot reach consensus. Limit the number of significant market changes being proposed. Implementation of resource price nodes after temporary nodes are retired. Provide more notice to Stakeholders for changes – examples, new customer qualification requirements for new resources; ALDR process modifications; data extract changes affecting Stakeholders.

Feedback Summary Are there initiatives ERCOT should give higher priority? Reliability aspects of Ancillary Services. Real-time co-optimization. Better short term load forecasts with better price forecasts in the next 15-30 minutes. Address reliability services: payment for provision of inertia support, payment for frequency response, capacity market. Revisit the amount of Responsive Reserve Service that can be provided from Load Resources. Market impacts associated with Demand Response programs. Smart Meter Texas oversight. Replacement for the consumer impact test. Support for solutions to the monthly-read IDR DG and load meters that are not settled on actual volumes until Final Settlements. Continued…

Feedback Summary Are there initiatives ERCOT should give higher priority? New Black Start selection process. Grid Security. Clarify responsibilities for Under frequency Load Shed (UFLS) relative to Emergency Response Service and other distributed energy resources. SSR/SSO resolution. Term transmission rights. Economic planning for transmission projects. Longer planning horizons. More public data postings and more convenient formats for data accessibility.

Feedback Summary What initiatives should ERCOT focus less on? • Staff initiatives not related to a specific reliability concern – allow issues to develop through the stakeholder process. • Real-time co-optimization. • Multi-interval SCED. • Major market changes that have not had Board review.

Feedback Summary What are 3-5 key strategic issues ERCOT will experience in the next five years? Cyber security. Integration of intermittent resources. Less system inertia. Distributed generation, battery storage. Demand Response, Loads in SCED. Resource Adequacy. Loss of Fuel Diversity. Impact of potential federal environmental regulations. Retain and reward ERCOT’s top talent.

Feedback Summary Are there any additional Market Participant training/education or services ERCOT should consider providing (ex. IT forum, specific market training)? A second Settlements Seminar. Valley specific Operator training. Power operations seminars taught by recognized experts in the field. Face to face meetings with ERCOT client representatives. Cyber security. Training for new market issues or past issues that have become current again (example: RMR). Periodic Segment specific seminars.

KPI Feedback Add a forecasting metric for solar. With regards to compliance with NERC and ERCOT Protocols, what does “significant” mean? Review SCED Availability metric as 99.9%/99.95% SCED Availability metrics still allow for 105/53 - 5 minute intervals where SCED is not available. RG 4 Operations Load Forecast Performance – Day ahead load forecast error tolerance is high. Should be 2% rather than 4%. 4% is a significant error on a 60+ GW system. (Also noted last year). ERCOT should add a Real-Time Load Forecast performance measure in addition to those for Day Ahead and Wind. By applying an error tolerance of about 1% to the hourly forecasts going 4 hours into the future, ERCOT will ensure a much tighter response to their forecast need from generators, which would benefit the entire market. RG 10 Energy Management System Tier 2 Aggregate Availability – The 99% target for Energy Management System Tier 2 Aggregate Availability is low. That target can be met even with 87 hours of computer outages every year. The target should at a minimum be set at 99.9%.