NEW EN-EL SPECIFIC DATA IN PLAN 08/02/2017

Slides:



Advertisements
Similar presentations
MOS Administrative Retention Review (MAR2) Program
Advertisements

Chapter 14 Network Design and Implementation. 2 Network Analysis and Design Aspects of network analysis and design Understanding the requirements for.
© 2013 Calypso Confidential Introduction to Calypso Product Support 1 © 2010 Calypso Confidential.
 Every stage from phase DESIGN in Software Development Process will have “design document” especially in analysis and design phases.  “Design document”
Configuration Management Backup/Recovery Project Review.
Chapter 10 Systems Operation, Support, and Security
Chapter 3: The Project Management Process Groups
ECM Project Roles and Responsibilities
Work Plan Development Steve Robinson Highway Utility Engineer, INDOT June 11, 2015.
LIU CABLING & OPTICAL FIBRES STRATEGY Georgi Minchev Georgiev EN-EL-CF.
Release & Deployment ITIL Version 3
CEN th Lecture CEN 4021 Software Engineering II Instructor: Masoud Sadjadi Change Control.
DBS to DBSi 5.0 Environment Strategy Quinn March 22, 2011.
Lecture 31 Introduction to System Development Life Cycle - Part 2.
Injection test1 Injection test in 2006 The installation schedule version 1.7 recently approved includes a ‘possible injection test’ - foreseen in April.
Clarity Educational Community Configuration Releases Best Practices in the CA PPM Development Process Presented by: Brian Wuenstel.
ITPD PRODUCTION SUPPORT PROCESS OCTOBER 8, /23/2015 Guiding Principles 1.Resolve production issues in a timely and effective manner 2.Manage.
TS, Length of YETS EYETS LIU & CONS Project
Office of Acquisition and Property Management Proposed Changes to Attachment G FY 2011 – FY 2015 Five Year Plan.
RECLAIM Seminar October 26, 2005 Judy B. Yorke, P.E., C.P.P. Yorke Engineering, LLC x25
Chapter 3 Strategic Information Systems Planning.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
Management Tools K. Pommès. Management Tools - The Project Planning Design Purchasing Production Installation To follow the project through its phases.
12/8/2015PLC Software Configuration WG - CCB1 PLC Software Configuration WG Members Philippe Gayet Fréderic Havart Renaud Barillère [Mathias Dutour]
Crew Scheduling By Jeff Fisher. CREW SCHEDULING Project priorities: Get the job done and done right Effectively Quality Efficiently Economically Safely.
OHT 15.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Templates The contribution of templates to software quality The organizational.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Preparing the Proposal Designing and Supporting Computer Networks – Chapter 9.
What is project management?
ASUG SAP Adoption Influence Council The focus is on how to increase awareness, adoption and implementation of SAP enhancements that are delivered as part.
 Based on 2+2 Roman Pot Stations on each side of ATLAS at ~ 240 m from the Interaction Point  Aim in Run 2 at measuring the total cross section and.
The Planning Phase Recognize the problem MIS steering committee 7. ManagerSystems analyst Define the problem Set system objectives Identify system constraints.

ALARA REVIEW WORKING GROUP (ARWG) New ALARA recommendations proposed by the ALARA REVIEW WORKING GROUP (ARWG) Heinz Vincke on behalf of ARWG LS1 committee.
Quantifying and Controlling Impact of Interference at Shared Caches and Main Memory Lavanya Subramanian, Vivek Seshadri, Arnab Ghosh, Samira Khan, Onur.
Use of PLAN in EN Department 1 st of April 2016 Michele Battistin.
1 Presented by: Val Pennell, Test Tool Manager Date: March 9, 2004 Software Testing Tools – Load Testing.
Electrical Group Inputs for LIU-Ions J. Devine, on behalf of EN/EL.
IS 455 Project Management – What is a project?
Supporting quality devices
Plan for LS2 – Version 2 08/02/2017.
AWARENESS AND EXPECTATION
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
YETS & LS2 Reminder P. Lelong / G. Georgiev / JM Lassausse
MEMORANDUM Cabling and Electrical activities requests YETS 2017/2018
YETS & LS2 Reminder G. Girardot 20 juin 2017.
LV Safe Powering from UPS to Clients
Project Athena Service Contract remediation Update to Finance Team
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
Quicken Problems with Application
PMIS Initiating a Project Application of Project Management Processes Project Charter Stakeholder Analysis and Stakeholder Register 2. Planning.
HI !.
EIS Project Status Briefing
PROJECT CHANGES IN EMS Implementation Seminar.
Merima Halkic Ganna Shulika Katharina Reiter
This presentation has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational purposes.
Status DETA Ways forward
Board of Regents Capital Projects Review & Approval Process
Effective Project Management: Traditional, Agile, Extreme
Executives & Management
Presented by (Abdisamad Abdullahi Abdulle)
The Software Testing Life Cycle
Product released! Software Released! Now what?.
Rollout Guide Day 1 to 10 Day 11 to 20 Day 21 to 30 Day 31 to 40
Applied Software Project Management
Award for Biggest Contribution to Patient Care
Joint Application Development (JAD)
Speaking the language of publishing. Worldwide
East Area Renovation Supply of control rooms b.157
Open Points and More… Giulia / Michael / Sebastien / Maria.
LIU EL-FC ACTIVITIES Updated on 28/11/2017
Presentation transcript:

NEW EN-EL SPECIFIC DATA IN PLAN 08/02/2017 STEFANO MEROLI (EN-EL)

S. Meroli - New EN-EL specific data in PLAN Outline Version 1: experience and issues The new EN-EL specific data 08/02/2017 S. Meroli - New EN-EL specific data in PLAN

S. Meroli - New EN-EL specific data in PLAN Issues from Version 1 The contributions requested to EN-EL were not clear for many activities declared in PLAN Difficult to quantify the workload requested by the user and the impact on our planning and resources We couldn’t validate activities that we didn’t know 08/02/2017 S. Meroli - New EN-EL specific data in PLAN

The new specific EN-EL data Fields not mandatory but needed to get the contribution approved 08/02/2017 S. Meroli - New EN-EL specific data in PLAN

The new specific EN-EL data 08/02/2017 S. Meroli - New EN-EL specific data in PLAN

S. Meroli - New EN-EL specific data in PLAN PLAN vs DIC, DIF and ARF This form is not replacing the DIC, DIF and ARF Reference DIC : EDMS 1210369 Reference DIF : EDMS 1153880 Reference ARF : EDMS 1519432 As usual, DIC, DIF and ARF shall be timely sent to EN-EL prior to the installation 08/02/2017 S. Meroli - New EN-EL specific data in PLAN

BACKUP: PLAN vs DIC, DIF and ARF Activity in PLAN DIC, DIF & ARF Activity execution PLAN team: Approve and prioritize the activity EN-EL: Classify the contribution and define his responsible EN-EL: preparation, estimate the schedule and resources 08/02/2017 S. Meroli - New EN-EL specific data in PLAN