ISR Inc. Artificial PVC Edge step 1… the test and the finished product

Slides:



Advertisements
Similar presentations
UNDERNEATH DECK TRUSS. THE NEXT 6 SLIDES ARE EXAMPLES OF ROADBEDS FOR EACH TYPE OF TRUSS BRIDGE.
Advertisements

CRIMPING Introduction
ULTIMATE PORTABLE WORKSTATION Produced by Gavin Weyrich.
Lesson Using Construction Fasteners and Hardware.
Agricultural Mechanic and Technology Cluster
Click on this image to open the full PDF document.
CONSTRUCTION OF A “LITTLE FREE LIBRARY” Gary Mehlum, pressed into service by wife and UHLS employee Mary Fellows (“When you marry a librarian, you marry.
Welcome to Hardie 101 Basic Training
Artificial Valves. In this activity you will be able to see for yourself the way in which a valve works. This activity will offer: An opportunity to build.
PAPER ROCKET LAUCNHER Bob Galliher Hobart Middle School 705 e.4 th St. Hobart, In
A PowerPoint presentation of the Use the right arrow key on your keyboard to advance the images.
Peek-a-Boo Box Construction Mrs. Nadine Allen Pearson Elementary.
Spiral Stairs Assembly Instruction By Laser Dollhouse Designs
How to Make a Hot Air Balloon
Ledgewood Farm greenhouse construction How do I Start? to I’m Finished!
Both the dome and slab design use a 5 gallon bucket in the middle to be used as a squat hole FINAL MOLD DESIGN.
Specification section 3.3
Foundation Systems.
Assembly Manual Mike Fortney 04/02/2006 CricketSat Receiver.
COMMERCIAL SERIES TRI-POINT ANCHORING SYSTEM
DROP IN ANCHOR DETAIL COMMERCIAL SERIES LIFTS INSTALLATION MANUAL Drop In Anchor/COMMERCIAL SERIES.
Installation. Indoor Unit Installation Typical Installation.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
Control System and Electrical Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Rulers or Tape Measures
Scratch Build a Water Tower
ROV Cameras. Extending Your Camera We want your ROV to be able to see the sea! (And the pool)
AE5YP 1 Portable NVIS Antenna. AE5YP 2 The Thought I want an antenna easy to: Transport Set up Use No Coils or Traps (1/2 wave length Dipole antenna)
Workshop Sponsored by: Home Grown Food Rain Barrel for Under $40.
Bridge Project. Materials – 8 pieces of wood, glue, cutters, masking tape and a ruler.
Egg Carrying Rocket Complete Your goal is to have your rocket looking something like this at the end of this section– fins attached and rocket engine block.
SPRING BOX. Using the following presentation assumes that individuals have a basic knowledge of construction. The user should be able to adjust measurements.
Air Powered Rocket. Rocket Body Lay two pieces of paper with their long sides over lapping Tape the paper together Roll the paper into a tube using the.
IRRIGATION SYSTEMS. OBJECTIVES 1. Describe irrigation & its purpose 2. Explain preparation for irrigation systems 3. Calculate GPM 4. Identify & explain.
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Plumbing Unit. Purpose: Transporting liquids safely from one point to another for storage, processing, and direct use Carries fresh water from a source.
Courtesy Eric Witherspoon, Sonex plans #815 Photo 1: What it is. Photo 2: How it works. Sonex Wing Stand Answer to photos 3 and 4: Want leading.
Water Systems Ag Mechanics Pipe Types Galvanized Steel Cast Iron Black Steel Copper.
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
VIEW SERIES with Sliding Door
Quick and Easy Model Building
PostBase Automatic Feeder Component Removal Service Training
Ork Watch Tower – First Floor Measurements may vary on your printer
A TUTORIAL FOR SUCCESSFULLY MATTING STUDENT ART
Board Replacement for Floating Floors
SeaPerch Structural System
SeaPerch Structural System
MDX-R3 INSTALLATION PROCESS ADJUSTABLE CONCRETE POOLS
Tools.
Strings and Rings.
Filter Istallation in Cineblaster
MDX-R3 INSTALLATION PROCESS NON-ADJUSTABLE CONCRETE POOLS
AU Media/ER/Toyota/Tech/Gen 7/06 Toyota Tundra
Additive and Subtractive Solid Modeling
Plumbing Unit.
2.2 Gallon TourTank Installation
Step-by-step assembly instructions
Hot-Air Balloons.
Step-by-step assembly instructions
Hydraulic Arm Assembly Instructions
Tools you will use for this job
These are only the basic instructions to build the stand.
BIODIGESTORES.
SeaPerch Structural System
Unit 8 Floor Framing.
Wiring the Light and Relay
Additive and Subtractive Solid Modeling
SeaPerch Structural System
Additive and Subtractive
Building a Tissue Paper Hot Air Balloon
Presentation transcript:

DISCLAIMER for design plans and construction notes… get a class in pvc cutting and gluing etc. etc.

ISR Inc. Artificial PVC Edge step 1… the test and the finished product In a home pool, the edge should be placed where the watermelon typically ends up after being thrown in while all of the filters and pumps are on. Measure the distance from the top of the edge to the water level A finished edge is shown here without the anchors being fastened yet… place the edge and perform the watermelon test again as the edge may influence water flow. Now let’s build one !

ISR Inc. Artificial PVC Edge step 2… what you will need and an exploded view PVC cutters, 1 can of water proof PVC glue, black vinyl tape, 20 feet of ¾ inch Schedule 40 PVC pipe, six elbow joints, four T joints, 2 end caps + extras of each. Sand paper (not shown) Cut sections (all from ¾ inch pipe) 1, 2 and 3 at 36 inches. Cut two a’s at 7 inches two b’s at 4 inches two c’s at 7 inches, two d’s at 3 inches and two ec’s at 1 inch. Use black tape to stripe pipe 3 as shown.

ISR Inc. Artificial PVC Edge step 3 Sand the ends and inside the L and T joints and PVC glue the upper section as shown. Sand the ends and inside the L and T joints and PVC glue the lower section as shown.

ISR Inc. Artificial PVC Edge step 4 All pipe ends sanded and cleaned, inside each L, T and end caps sanded, cleaned and PVC “blue” glued. Placed at watermelon stop site with jets and filter pumps on and re-watermelon tested.

ISR Inc. Artificial PVC Edge step 5 (this version is called option P) This pool coping has a one inch over-hang and therefore the ec portion was removed. The T was sealed with a pvc plug and 3 is one inch underwater.

ISR Inc. Artificial PVC Edge (an option… *G ) In this option, the upper deck is two feet longer, a L is used instead of a T and the bars extending the striped bar are longer. This would be best where the coping is flush with the tile (no over-hang) and the children are older. No anchors to the deck are shown.

ISR Inc. Artificial PVC Edge (an option *S) This option features a two foot extension on the upper portion and no extension bars for the striped bar L’s were used vs T’s. Best for coping that is not flush with the tile and children under 18 months.

ISR Inc. Artificial PVC Edge (an option… *G with T’s ) This is option G shown before but with T’s and a 2x4 support (39 inches long, attached with nylon cable ties. Used for over-hang coping with infants 18 months +

ISR Inc. Artificial PVC Edge step 9 (for option P from slide 6) The anchors are anything safe that keep the PVC edge securely in place. In this version, a 39 inch piece of shelving board was fastened to the PVC using cable ties. Never drill through PVC, use cable ties AROUND the pipes. Once firmly tied down, a 45 pound weight is bolted to the shelving boards. The outdoor carpeting covering the upper deck portion has not been placed and cable tied into place yet.

ISR Inc. Artificial PVC Edge step 10 This shows how the nylon cable keepers are used, however, the insert portion should be UNDER the boards where the PVC pipe is… Attractive but dangerous, the pool view is blocked by the plant.. Better to use sand bags or deck anchors…