, CLIC Test Module Meeting Status of the DB Quad adjustable support design Mateusz Sosin CLIC Module WG Meeting, 22-May-2013.
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Rock Coring Obtain undisturbed samples of solid, fractured, or weathered rock formations.
1/9 Hélène Mainaud Durand Sylvain GRIFFET, 28/11/2011 BE/ABP-SU/ Adjustment of 4 Drive Beam Quads positions on TM0 CLIC girders EDMS Document No
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
Levers. Definition A simple machine A board or bar that rests on a turning point called the fulcrum Used to change the amount, the strength and the direction.
LUCOEX Large Underground Concept EXperiments 2011 – 2014 Work Package 5 KBS-3V Emplacement tests in ONKALO Progress and Plans Project Progress Meeting.
(1/15) 08/05/13 – RadWG meeting J. Mekki M. Brugger PS East Area Update Outline Layout updates of the facility Conveyer options Mock-up preparation and.
STARLight PDR 3 Oct ‘01 F.1.1 Rashid STARLight STARLight Mechanical Tahir Rashid STARLight Mechanical Engineer (734)
Friedrich Lackner (TS-SU) CLIC08 Workshop. CLIC Main Beam Quadrupole Magnet The Alignment Concept Expected Properties of a the Support Structure Foreseen.
CTC, Two-beam module program (WP CTC-004) CLIC Modules (boundary conditions, technical system design and integration) CDR modules Prototypes.
TIB-TID insertion test into the CMS Tracker cylinder ________________________________________________________ Tracker week july 04
16-Oct-15S.Movchan Straw manufacturing and QC1 Straw machine status polished anvil new welding configuration software for on-line seam quality control.
Argonne National Laboratory is managed by The University of Chicago for the U.S. Department of Energy LCLS Girder Support Concept Design Sushil Sharma.
Transport and handling at CERN for FAIR
STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
DBQ support – motorization and performance upgrade Mateusz Sosin EN/MEF-SU.
Discussion points TBM meeting 23/09/2015. Updates Global 3D assembly updated, no severe problems/clashes T1 RF network dimensions updated WPS arms machined.
1962 First CMM DEA (Italy) Ahmed CHERIF CERN Metrology lab. CLIC TECHNICAL COMMITTEE – EDMS : EDMS :
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
20 pt 30 pt 40 pt 50 pt 10 pt 20 pt 30 pt 40 pt 50 pt 10 pt 20 pt 30 pt 40 pt 50 pt 10 pt 20 pt 30 pt 40 pt 50 pt 10 pt Identify the Simple Machine Levers.
GLAST LAT ProjectMarch 24, H Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS H: Tower Shipping and Storage.
CLIC Module meeting, 22/08/2011 N. Chritin (EN/MME) Cradles design for CLIC module supporting system (EDMS )  General principle  Main inputs an.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
cern.ch 1 A. Samoshkin 28-Feb-2011 Progress on CDR module design.
Transport & Handling of Detectors TAN Workshop S. Prodon –
TOB meeting, TOB meeting 20 September 2005, Antti Onnela: TOB mechanical integration status and plans n TST-TOB-TIB integration exercise n.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 July 17,
1 Assembly and installation of TM0 in the Lab Assembly and installation of TM0 in the Lab F. Rossi September.
Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
CLIC module Experimental program for module array Module review, June 22 nd 2015Elena Daskalaki, BE-RF-MK.
Fiducialisation and initial alignment of components for CLIC Mateusz Sosin on behalf of the CLIC active pre-alignment team CLIC Workshop 2015.
RFQ Cold model manufacture, June 2006 Peter Savage The Front End Test Stand Collaboration 1 OFC RFQ Cold Model Manufacture The first step is to convert.
CLIC MODULE TRANSPORT AND INSTALLATION Keith Kershaw CES, 8 October 2008.
EDMS – R.Leuxe 1/16 CAD Catalogs CATIA / Smarteam R20 Spring News.
8-Mar-16S.Movchan Straw manufacturing and QC1 Straw machine status anvil new welding configuration software for on-line seam quality control conclusion.
CLIC Permanent Magnet Quadrupole Engineering Development update Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 03/10/2011.
Gravity load on SAS – comparison between real and mock-up April 13 th, 2016.
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
Epument Girder simulation and Module Showroom upgrade For CLIC meeting 2015 Petri Tikka, Helsinki Institute of Physics focusing on exploring the possibilities.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
GOLD- ELECTROPLATING COOLING FITTING ADAPTER ACCELERATING STRUCTURE CONCEPTUAL DESIGN OF X-BAND ACCELERATING STRUCTURE TD26 CC SIC Abstract Many accelerating.
Concrete Block Making Machine The Concrete Block Making Machine is ideal for any construction site. They are easy to handle, install and also economical.This.
Relocation Services and Equipment Modification Services
Levers.
Update on the DB Girders FE Analyses
on behalf of the CLIC active pre-alignment team
LBNF CAD models, Drawings and Component list
TEST MODULE WG Cradles for CLIC module supporting system
Alignment methods developed for the validation of the thermal and mechanical behavior of the Two Beam Test Modules for the CLIC project Hélène MAINAUD.
CLIC Common RF-girder study
Module roadmap to end of 2017
Components for the Machine-Interface Regions
The path to a new CLIC main-linac module
Far Detector Activities Late 2017 – Early 2018
Installation plan for LAB modules
Ad-hoc Transportation test of «CLIC module»
Experimental program for module array
EILERSEN The Weighing experts.
[Update Medical Records] Worker Register
M. Modena, CLIC Stabilization Day # 10, 14 September 2010
Presentation transcript:

Ad-hoc Transportation test of «CLIC module» 2.0 M. Aicheler 26.10.2016 05.04.2017

Those two girders to be transported into storage area in Building 162 => ad-hoc Transportation-Test Those two girders to be transported into storage area in Building 162 => ad-hoc Transportation-Test Now, we would like to store them in the basement of 169 in the CLIC storage room. No need for real transportation anymore Load on a truck and come back to the same place!

AS simple mockup Plain material, no inner geometry Brazed (for material state compareable to CLIC AS) and very cheap to manufacture Core diametre 80mm Manifolds 40mm x 40mm Roughly same weight and similar mechanical properties Will be reused for tests with new supports!

Now at CERN Core is a machining test piece from VDL Added holes in manifolds for easier attachment of trial supports

1st test: Classic V-support as in CDR MB Girder AS Vibration logger Fiducial Clamping of AS to girder as in CDR/CLEX Aims: Record relevant vibration data Show robustness of system

2nd test: support based on flexures Supports are being designed; shown here are conceptual (Missing: adjustment) Start with easy lateral DOF Aims: Show robustness of system Show adjustability and repeatability Get cost estimates for such kind of supports DB girder

Updated list of steps: Installation, clamping, on site-fiducialisitation, installation of vibration logger in Build 18 Transport by manual crane into transportation box Transport of box with manual lifter Transport of box with truck Final on site (build 18) survey and evaluation of vibration logger Overall time estimation for test (including fiducialisation and final survey): 2 days

Targeted outcome: Open questions: Evaluate the loss in position precision during a transportation test with the CDR design of support and clamping Assess the typical spectrum of vibration/shock exposure of a CLIC girder during various transportation steps for future support design Open questions: Transport in a box? => Yes Clamping details => Similar Clamps available Details on manufacturing of simple AS mockup => done: AS mockup at CERN