STT gas system a possible implementation

Slides:



Advertisements
Similar presentations
FE electronic box Construction of end piece OT module Electronic components Mechanics Cooling.
Advertisements

Thermo Fluid Design Analysis of TBM cooling schemes M. Narula with A. Ying, R. Hunt, S. Park ITER-TBM Meeting UCLA Feb 14-15, 2007.
June19-21, 2000Finalizing the ARIES-AT Blanket and Divertor Designs, ARIES Project Meeting/ARR ARIES-AT Blanket and Divertor Design (The Final Stretch)
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Daya Bay RPC Gas System: Design Report & Budget Estimate Changguo Lu, Kirk McDonald Princeton.
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
Cooling: CEDAR PMT & Electronics Tim Jones Liverpool Group.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
1 Outer Tracker Front-End Layout Distribution of Signals and Bias NIKHEF/HeidelbergOctober 2002.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
JCOV, 25 OCT 2001Thermal screens in ATLAS Inner Detector J.Godlewski EP/ATI  ATLAS Inner Detector layout  Specifications for thermal screens  ANSYS.
Convection: Internal Flow ( )
DCLL ½ port Test Blanket Module thermal-hydraulic analysis Presented by P. Calderoni March 3, 2004 UCLA.
Update on Micro Channel Cooling Collaboration Meeting , G. Nüßle.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
C.BAULT November 9 th  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY  ENVELOPE SERVICES  BARREL SERVICES ROUTING.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
DON LYNCH OCTOBER 28, October 28, 2014 sPHENIX Detector Integration & Assembly Concept.
ITER TBM MEETING March UCLA DCLL Module Design Prepared by M. Dagher UCLA P. Fogarty ORNL.
1 David Santoyo sLHC OXFORD 17/06/2010 EC Structure Review ? ? ? ? ? ? IFIC-Valencia.
FGT Magnet C Assembly metric tons (59 US tons) -100mm thick steel plates -6.6m high x 3.1m wide x 1m deep (outer dimensions) -5m high x 2.25m wide.
Mitglied der Helmholtz-Gemeinschaft Straw Production: Status, Plans, Timelines Peter Wintz (IKP - FZ Jülich) (A. Cebulla, I. Georgadze, V. Kozlov, S. Orfanitski)
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
- PROPOSAL FOR A SOLUTION OF A “STRAW MODULE” INTEGRATION - INFN-LNF - SPAS -STRAW MODULES INTEGRATION- INFN-LNF-SPAS- December D. Orecchini – P.
Rosanna Cocimano Amsterdam, 5-6 July 2010KM3NeT WPF/L General Meeting Rosanna Cocimano INFN LNS Power plan for detector layout Presented in TDR.
Tracking Session, Groningen, August 30th, News from Krakow on the Forward Tracker J. Smyrski Institute of Physics UJ Model of the tracking stations.
Control Rod Nozzle Guide Tubes improved by 4 drilled holes. Model as two coaxial tubes of fluid connected by 4 holes. Two inlets at the bottom from the.
Target Systems and Monolith Design Update Rikard Linander Group Leader Monolith and Handling April 2, 2014.
MVD COOLING STATUS COOLING PLANT UPDATE: -ADDITION of the NEW CIRCUITS FOR GBT AND DC-DC Converter BOARDS IN THE COOLING PLANT -THERMAL STUDY OF GBT AND.
Central Tracker Cabling and Mechanics Paola Gianotti26/4/111.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
FWD Meeting, Torino, June 16th, News from Cracow on the forward tracking J. Smyrski Institute of Physics UJ Tests of CARIOCA and LUMICAL preamplifiers.
STT Detector risk’s assessment. STT detector work packages Straw Tubes modules Straw Tracker mechanics Front-End Electronics Analog electronics Digital.
1)– CENTRAL TRACKER INTEGRATED ITEMS: > Central Tracker, “Assembly & Insertion Auxiliary Structure”. > “CSF”- Central Tracker Support Frame (In collaboration.
- “STRAW TRACKER AND CLASH ITEMS ANALYSIS. - “STRAW TRACKER AND STILL OPENED ITEMS ANALYSIS. - “STRAW TRACKER AND DANGEROUS ITEMS ANALYSIS. INFN-LNF -
Status of HK Water 4th Open Meeting for Hyper-K January
MVD COOLING STATUS MVD COOLING PROJECT: CHOICE of COOLING FLUID,
ATLAS Internal ID Service Integration
Feedback on transfer line sizing and flow calculations for UT
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
“CENTRAL SUPPORT FRAME” -
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
STRAW TRACKER SYSTEM CAD STATUS :
Update of MVD services and requests
- CT INSTALLATION PROCEDURE OVERVIEW -
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
STRAW TRACKER CLASH AND INTEGRATION ANALYSIS- INFN-LNF - SPAS
Cooling pipes and Space for Services
Micro Vertex Detector of PANDA Strip Detector
cooling and supports of the forward endcap EMC
Pixel cooling specifications
ALICE PD group meeting Andrea Francescon.
Integration issues at IHEP
Some proposals on HV circuits realization for segmented straw detector
UT Integration meeting UT CO2 COOLING DISTRIBUTION SYSTEM
update on UT cooling system
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
First of all we will remind some numbers:
CO2 cooling requirements for the IBL
Integration and IR Hall
LST Module Installation
From: Modeling of Particle-Laden Cold Flow in a Cyclone Gasifier
DCLL TBM Design Status, Current and future activities
DET. Integration Inner detector envelope Radial clearances.
Thermal behavior of the LHCb PS VFE Board
Internal Flow: General Considerations
Outer Endcap External Bus tape
as a prototype for Super c-tau factory
PANDA Collaboration Meeting
Presentation transcript:

STT gas system a possible implementation PANDA Tracking Meeting October the 10th 2013 Jülich STT gas system a possible implementation Guidelines adopeted to flush the PANDA straws Parameters to be controlled The gas flow piping: a possible realization with manifolds Test of gas sealing on prototype manifold Conclusions and open questions V. Lucherini – INFN LNF

Setting the Task To flux a mixture of gases, Argon-C02, 10(20)-90(80), through » 4650 straw tubes, assuring a given number (» 4 ) of gas changes per day in their overal volume (of » 1000 l) . To ensure the required overpressure (» 2 bar), purity grade and sealing of the mixture. To reduce the redundancy of the system to lower the costs, the material budget and the complexity. To ensure a minimal redundancy to guaranty, in case of failure of single components, the operation of at least parts of any sector; Full automated setting and remote control, with the possibility to switch to manual/local operation, of the gas flow parameters as: - ratio of the two components in the gas mixture; - quantifying the Inlet / Outlet gas flow; - setting and controlling the gas over pressure; controlling the temperature; (uninterrupted gas flow).

Layout Control System (M. Bragadireanu talk) Settling the Task Build independent pipe lines, arranged in such a way to ensure an independent gas flux in every sector and in each main subdivision of each sector. - one line per sector for each (inner & outer) axial straw regions: 6×2 = 12 lines; – two lines per sector for each of the stereo straw groups: 6 × 2 = 12 lines. Total: 24 pipe lines ( + 24 return pipes). SST gas flux Layout Control System (M. Bragadireanu talk)

STT (Straw Tubes Tracker ) &“Service Support Frame” -Gas Pipes” lines: n.4 -Gas Pipes” lines: n.4 -Total “Gas Pipes” lines: 12 (For left half-tracker) -Gas Pipes” lines: n.4 Gas Distribution to straws on this side - STRAW TUBE TRACKER - SERVICE SUPPORT FRAME -Gas Pipes” lines: n.4 p -Gas Pipes” lines: n.4 straw-to-straw gas piping on this side -Gas Pipes” lines: n.4 -Total “Gas Pipes” lines: n. 12 (For left half-tracker) 1000 mm

PATHWAYS OF GAS PIPES (and HV cables) -The encumbrance of the connectors has not been considered! 20 HV Cables 4 Gas Pipes (From the Forward Side) HV CABLE DATA - Cross Section 8,1mm^2/each - Total: 8,1x20 = 162mm^2 (Each Pathway) - Weight: 0,0162 Kg/m 13 HV Cables 8 Gas Pipes (From the Forward Side) 13 7 Theoretical needed cross section for each top & bottom pathway: 162+340= 502mm^2 13 HV Cables 6 8 Gas Pipes (From the Forward Side) 13 GAS PIPE DATA 13 HV Cables - Cross Section 28,26mm^2/each - Total: 28,26x12 = 340mm^2 (Each Pathway) - Weight: 0.016 kg/m 4Gas Pipes (From the Forward Side) 12 Gas Pipes 20 HV Cables Backward side

- GAS PIPES - Weight: 0,0162Kg/m Outer diam: 6 mm Inner diam: 4 mm Inox pipes to distribute (recover) the gas flow to individual straws

p GAS MANIFOLD SYSTEM Bleu pipes: gas inlet Yellow pipes: gas outlet - STRAW TRACKER GAS SYSYTEM INTEGRATION. p GAS PIPES GUIDE FLUX TO INDIVIAL STRAWS STRAW MODULES SUPPORT END-PLATE GAS MANIFOLD SYSTEM Bleu pipes: gas inlet Yellow pipes: gas outlet

Manifold for the Inner Layer Bleu pipes: gas inlet Yellow pipes: gas outlet

Manifold for the Skewed Layer Bleu pipes: gas inlet Yellow pipes: gas outlet

Manifod for the Outer Layer Bleu pipes: gas inlet Yellow pipes: gas outlet

Enlarged view of some of the Manifolds Bleu pipes: gas inlet Yellow pipes: gas outlet

Forward side: pictorial view of the manifols for one sector: three for each one Bleu pipes: gas inlet Yellow pipes: gas outlet

Forward side: pictorial view of the manifols for one sector: three for each one Bleu pipes: gas inlet Yellow pipes: gas outlet

Manifold encumbrance p I.P. 1060mm 1142mm

Manifold prototype and test No gas leakeage from the prototype (made in plexiglas) in a fist test lasting four days

Conclusions and open questions A piping system to flux the SST hase been devised trying to follow the the guidelines of the SST TDR. A compact network of pipes, distributed in an appropriate way in the external surface of the SST set-up can allow to bring the inlet and outlet gas flow in a compact way A manifold has been devised as a possible “interface” between the inlet/outlet gas pipes and the distributor of the gas mixture to the individual straws A propotype manifold has been realized and succesfully tested for gas sealing …of course this is just one, between many, of the possibile solutions of the task...