(Alice COsmic Ray Detector) Status Report

Slides:



Advertisements
Similar presentations
1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
Advertisements

CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
Progress on ACORDE (ALICE Cosmic ray detector) Ildefonso León for ACORDE-ALICE group.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 How to power up the TRD David Emschermann Physikalisches Institut Universität Heidelberg updated.
LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 Status of the TRD at CERN as of July 2007 TRD Group Physikalisches Institut Universität.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
1 ALICE Control System ready for LHC operation ICALEPCS 16 Oct 2007 L.Jirdén On behalf of the ALICE Controls Team CERN Geneva.
11 CTP Training A.Jusko, M. Krivda and R.Lietava..
L.Jirden1 Update on Power Supplies DCS WS L.Jirden u Wiener u Caen u Global Support Contracts.
Status of Data Exchange Implementation in ALICE David Evans LEADE 26 th March 2007.
DCS - general Unscheduled power cut Wed. morning ( , human error) –DCS (and HLT) off, due to UPS on bypass –In the middle of DB migration, had.
1 Low Voltage Power Supplies for ALICE ALICE week June 04 L.Jirden u Detector requirements u Target Devices u Procurement u Actions.
V. Altini, T. Anticic, F. Carena, W. Carena, S. Chapeland, V. Chibante Barroso, F. Costa, E. Dénes, R. Divià, U. Fuchs, I. Makhlyueva, F. Roukoutakis,
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
Real data reconstruction A. De Caro (University and INFN of Salerno) CERN Building 29, December 9th, 2009ALICE TOF General meeting.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
1 Status and Plans DCS workshop L.Jirdén u Budget u Status u Planning u Goals for end 2002.
1 Responsibilities & Planning DCS WS L.Jirdén.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 1 Progress on and Status of the Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
15 April th ALICE RRB J. Schukraft 24 th ALICE RRB Collaboration News Project Status  Production (TOF, TRD, PHOS, PMD)  Installation  Commissioning.
TS planning meeting 7 to 11 Nov Technical stop Wk 45: Monday 7 th to Friday 11 th November Ramp down magnets (SL): Mon 8:00 – 8:30 (latest) RP search.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
DCS overview - L.Jirdén1 ALICE ECS/DCS – project overview strategy and status L.Jirden u Organization u DCS system overview u Implementation.
13-Mar-061 ACORDE DCS ACORDE GROUP CINVESTAV, ICN-UNAM, MICHOACAN. PUEBLA México.
1 DCS Status & Plans 22 June 2004 L.Jirdén. 2 URD Status DCS Detectors TOF SPDSDDSSD TPCTRDZDCPMDHMPITS PHO CPVCAL FMDV0T0 TRATRG MU ACCEMC HV LV FEE.
CONFIGURATION OF FERO IN ALICE Peter Chochula 7 th DCS Workshop, June 16, 2003.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
1 Planning DCS WS L.Jirdén. 2 TPC HMPID ACORDE FE PC Console DSS Disk SRV DB-SRV App GW sensors actuators DSS sensors actuators PC room SXL2.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
TC meeting P2 planning wks 3&4 A.Tauro
Sergio Vergara Limon, Guy Fest, September Electronics for High Energy Physics Experiments.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
Monthly video-conference, 18/12/2003 P.Hristov1 Preparation for physics data challenge'04 P.Hristov Alice monthly off-line video-conference December 18,
P. Kuijer1 System run coordinator meeting
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
Calibration: preparation for pa
F. Bellini for the DQM core DQM meeting, 04th October 2012
DCS Status and Amanda News
TS2 preparatory meeting
LKr status R. Fantechi.
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
EMCal Cosmics Run Cosmics Run Goals
Gas system Commissioning procedures and status
ALICE Status Report to LHCC September 2008
Production status – christmas processing
ALICE Commissioning: Getting ready for Physics
ALICE Status 4th CERN-Korea meeting
Dr. Mario Iván Martínez Hernández FCFM – BUAP
IEEE NPSS Real Time Conference 2009
ALICE Trigger Upgrade CTP and LTU PRR
Fiber Installation for RUN 3&4
Experience between AMORE/Offline and sub-systems
ALICE 5 o’clock meeting Wk
Alice TPC DCS.
The LHCb Run Control System
M. Krivda for the ALICE trigger project, University of Birmingham, UK
TPC Detector Control System
Commissioning of the ALICE-PHOS trigger
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

(Alice COsmic Ray Detector) Status Report ACORDE (Alice COsmic Ray Detector) Status Report

ACORDE Unit 2 Scintillators 2 PMTs 1 FEE 2 HV cable 1 LV cable to power FEE card 3 LVDS signal cable

ACORDE array 60 ACORDE modules on top of L3 magnet (HV, LV, Signal cable, HV power supply)

Electronics+DAQ/ECL Electronics Cards FEE. 60 FEE cards. PATCH PANEL. 8 patch panels. BUS 2 BUS cards. MAIN BOARD 2 Main board OR BOX On construction.

High & Low Voltage CAEN-EASY System A3486 Power supply EASY crate A3009B Module A1676 Branch Controler SY 2527 HV Power Supply 1733N Module HV

Technical Forum Report 04.10.2007 Commissioning W. Riegler Status of DCS Lennart Jirden  Status of Trigger Orlando Villalobos Status of DAQ Pierre VANDE VYVRE  11/11/2017 W. Riegler, CERN

Installation Sequence The ALICE detector installation sequence  Done: HMPID/ 2TOF/ 1TRD/ ZDC/ ACORDE/ Muon Tracking/ Muon Trigger TPC-parking/ ITS barrel/ Beampipe/ V0-C/ T0-C/ FMD3/ SPD/ SSD/ SDD/ FMD2/ TPC-IP To be done: Service Chariot/ Valve/ EMCAL/ PHOS/ Miniframe/ T0-A/ V0-A/ FMD1/ PMD/ Dipole/ Beampipe/ Shielding PHOS/ more TOF & TRD We have accumulated significant delay, because … 11/11/2017 W. Riegler, CERN

Subdetector Status DAQ and Trigger: In excellent shape. Ready to read subdetectors. ACORDE: Installation finished. Connected to CTP. Connected to DAQ. Some HV modules not yet delivered. DCS, ECS work ongoing. EMCAL: EMCAL support is sitting in SXL2 and ready to be installed. FMD: FMD3 Installed, connected to rack and tested. FMD2 installed and tested. Connection to rack on Miniframe t.b.d. FMD1 ready for integration with V0-A beginning of October. HMPID: Up and running. Currently producing a noise map. Muon Tracking: St1: Installed and tested standalone. St2: Installed, currently connected and tested. St3: 50% installed, rest to be installed in October (access). St4: Installed and connected. Commissioning starting. St5: Installed and connected. Commissioning starting. Muon Trigger: Installed, connected and tested (standalone). Connection to DAQ to be done. 11/11/2017 W. Riegler

Subdetector Status T0: C-side installed and checked up to the rack. Electronics still to be installed. A-side to be installed in Jan. V0-C: V0-A: Ready for integration with FMD3. Electronics to be installed. ZDC: Both ZDC elements installed. Progress on sub-detector stand alone commissioning is steady, but not extremely fast. 11/11/2017 W. Riegler

Main Concern Offline tasks Calibration Alignment Reconstruction Man power: Pedro Podesta (responsible) Eleazar Cuautle, Pedro Gonzalez, Mario Rodriguez, Antonio Ortiz

Global Commissioning Runs Magnet Test , Global Commissioning Run Dec. 10th to Dec. 21st ACORDE / FMD1 / HMPID / SSD% / SDD% / 2TOF / TPC% / 1TRD / T0-C / Muon % The goal is to start with ‘the real thing’: Shift crew, run organization etc … 11/11/2017 W. Riegler, CERN

Detector Status September 07 1 H/W & low level S/W done 2 Basic control with PVSS 3 FSM implemented 4 Configured and ready for operation SPD SDD SSD TPC TRD TOF HMP PHO CPV MCH MTR FMD T0 V0 PMD ZDC ACO EMC TRG DCS HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV RCK LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV DSS MON MON MON MON MON MON MON MON MON standard GAS GAS GAS GAS GAS GAS GAS GAS Central effort GAS VME VME VME VME VME VME VME VME VME VME VME VME VME VME COO COO COO COO COO COO COO COO VEN VEN COO COO FEE FEE FEE FEE FEE FEE FEE GMS FEE FEE FEE FEE HAL semi : - Device & FEE configuration - Oracle archival - access control - alarms - User Interface LV LAS VHV HVD MON APD HVD THR FEL LVD MOV LED BOM SFM PIT IAS MIR GPS PCU LIQ LED MTS THR APD TCO VAC CAM GPU PTU CCO LAS specific NMR SYN CPU GTU TOR NIM RAD DVM DVM TRU

Detector Status September 07 1 H/W & low level S/W done 2 Basic control with PVSS 3 FSM implemented 4 Configured and ready for operation SPD SDD SSD TPC TRD TOF HMP PHO CPV MCH MTR FMD T0 V0 PMD ZDC ACO EMC TRG DCS HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV RCK LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV DSS MON MON MON MON MON MON MON MON MON standard GAS GAS GAS GAS GAS GAS GAS GAS Central effort GAS VME VME VME VME VME VME VME VME VME VME VME VME VME VME COO COO COO COO COO COO COO COO VEN VEN COO COO FEE FEE FEE FEE FEE FEE FEE GMS FEE FEE FEE FEE HAL semi : - Device & FEE configuration - Oracle archival - access control - alarms - User Interface LV LAS VHV HVD MON APD HVD THR FEL LVD MOV LED BOM SFM PIT IAS MIR GPS PCU LIQ LED MTS THR APD TCO VAC CAM GPU PTU CCO LAS specific NMR SYN CPU GTU TOR NIM RAD DVM DVM TRU

Status at Point 2 The CTP is now installed at Point 2, as are all the required detector partitions. The detector partitions are available for use by detectors 12 TTC partitions are connected at present. FMD, ACORDE, TPC, DAQ, TOF, MUON_TRK, SDD, SSD, TRD, SPD, HMPID, MUON_TRG Cosmic triggers from ACORDE now available. Fanin-fanout crate operational, used by SSD, DAQ, FMD, HMPID (CPV).

Status in September

Status at Point 2 From P. Vande Vyvre: DAQ Meeting October 2nd 2007 So far, only test of transmission of triggers via CTP was to use ACORDE to trigger DAQ DAG partition.

CTP at Point 2 CTP present All LTC crates present TTCmi present Remote access to LTC partitions available and being used.

Detector commissioning with TRG & DAQ at Point 2 till Sep 07 SPD SSD SDD TPC T RD TOF MUON TK TG HMP I D PHOS C P FMD T 0 V0 ZDC PMD ACORDE EMCAL Data Acquisition with central DAQ Trigger with central Trigger Generation of Trigger signals NA

Colaboración ACORDE – México Benemérita Universidad Autónoma de Puebla. (BUAP). Instituto de Ciencias Nucleares-UNAM) Centro de Investigación y de Estudios Avanzados. (CINVESTAV)