Maria’s Restaurant Chapter 1 Section 1

Slides:



Advertisements
Similar presentations
Hoshizaki America has built a legacy of quality design, reliability and customer commitment. In our Commercial Series refrigeration line, youll see solutions.
Advertisements

Exterior Window and Door Frames
eQuest Quick Energy Simulation Tool
Chapter 8: Duct Design and Sealing To be used with the Guide to Building Energy Efficient Homes in Kentucky.
Heating, Ventilating, and Air-Conditioning
Washington State Department of Commerce Tips for Reducing Your Energy Bill 2009.
“Do not take anyone’s advice as to how this building should be assembled.”
Heating, Ventilating, and Air-Conditioning (HVAC)
Kitchen Corps, Inc. Putting the pieces back together!
ATA Melbourne Branch presentation April 2008 Jim Lambert
The House as a System 1. Air Temperature and Water Vapor.
Heating and Air Conditioning I Principles of Heating, Ventilating and Air Conditioning R.H. Howell, H.J. Sauer, and W.J. Coad ASHRAE, 2005 basic textbook/reference.
HVAC523 Heat Gain. Heat First law of thermal dynamics states that HEAT TRAVELS FROM HOT TO COLD. 95 degree outside air will flow through the building.
Windows Do not open or close all windows and doors at the same time. Optimise the ventilation by experimenting with opening different windows instead.
Chapter 5 Catering Equipment.
Brought to you by: Connecticut Energy Code Frederick F. Wajcs Senior Energy Engineer Northeast Utilities February 10, 2011.
AIR QUANTITY REQUIRED TO TRANSFER HEAT IN A FORCED AIR SYSTEM In all four mechanical systems considered, the transfer of heat, either by taking it out.
MAIN ENTRANCE SOUTH EAST VIEW NORTH EAST VIEW.
Planning Back- of-House Support Areas Chapter 4 (c) 2014 by John Wiley & Sons, Inc.
HVACR416 - Design Heat Loss / Heat Gain Part 1. Why? The primary function of Air Conditioning is to maintain conditions that are… o Conductive to human.
Ch th hour Refrigerators and Freezers In most kitchens, the largest appliance Is the refrigerator. The freezer section may be at the top, at the.
Some Pointers for your assignment..  Passive solar heating is defined as using solar energy incident on windows, skylights, greenhouses, clerestories,
Chapter 24 Chimneys and Fireplaces Copyright Goodheart-Willcox Co., Inc. May not be posted to a publicly accessible website. Explain how masonry chimneys.
VENTILATION AND FENESTRATION
Chapter 3 Tools and Equipment.
Kitchens, Laundry Areas and Baths Chapter 22. Objectives 1. Explain basic principles for designing efficient kitchens, laundry areas and bathrooms. 2.
KRJ Planning and Research-- We plan learning environments as comfortable, resource-efficient knowledge incubators. Control over… Air temperature Radiant.
KITCHEN APPLIANCES. LARGE AND SMALL Kitchen appliances are designed to make food preparation easier, faster and sometimes safer. Large appliances –Stoves.
Day 1 Part 1 Technician’s Guide & Workbook for Home Evaluation and Performance Improvement.
ENERGY SYSTEMS LABORATORY ABOVE CODE ENERGY ENHANCEMENT PROJECT for The City of Arlington ENERGY SYSTEMS LABORATORY Texas Engineering Experiment Station.
Part 15 Technician’s Guide & Workbook for Duct Diagnostics and Repair.
26’ Mobile Kitchen. 26’ Catering Kitchen Trailer In stock and ready for delivery. Trailer details/features General Features: Aluminum diamond plate.
Maria’s Restaurant Chapter 2 Section 6
Maria’s Restaurant Chapter 2 Section 9
Maria’s Restaurant Lesson 20 Appendix B Zone 2 Manual N Loads
Maria’s Restaurant Lesson 18 Appendix A Zone 2 Equipment Loads
Part 16 Technician’s Guide & Workbook for Duct Diagnostics and Repair
Maria’s Restaurant Lesson 21 Appendix C Duct Design
Maria’s Restaurant Lesson 17 Appendix A Zone 1 Equipment Loads
Maria’s Restaurant Appendix A Section 16 HVAC Building Loads
Maria’s Restaurant Chapter 1 Section 4
Welcome to the Colorado Restaurant Association Pikes Peak Chapter Energy Efficiency in the Restaurant Industry.
Maria’s Restaurant Chapter 1 Section 3
Maria’s Restaurant Chapter 3 Section 13
Lesson 24 Appendix F Outside Air Calculation
Fully Equipped Restaurant for Lease
Maria’s Restaurant Chapter 1 Section 2
Lesson 23 Appendix C Exhaust Calculation
Maria’s Restaurant Chapter 2 Section 8
Conduction Cooling Loads
Electrical Gas Plumbing Heating & Cooling
High Performance HVAC Installation
Flip The Long House Let’s imagine the Long house example in Manual J has undergone a house flipping/energy savings update. The insulation was increased,
Zoning Load Calculations
Manual D Duct Sizes Room Cooling CFM % Total CFM Heating CFM Kitchen GR Dining Bed Bed 3.
Thermal Impact of Different Interior Finishing Materials on Energy Consumption YOGESH JATAV
Zoning Methods There are an unlimited number of ways to zone a home! Popular ways include: More than one single zone HVAC system. Zone damper systems.
ATA Melbourne Branch presentation April 2008 Jim Lambert
FBE03: Building Construction & Science
EET 323 – Electrical System Design Lecture 1: Introduction to Electrical System Design Radian Belu, PhD.
FARR’S BUILDING APARTMENTS
EET 323 – Electrical System Design Lecture 3: Load Characteristics
Maria’s Restaurant Chapter 1 Section 3
Maria’s Restaurant Chapter 2 Section 9
Maria’s Restaurant Lesson 22 Appendix C Zone 2 Duct Design
Maria’s Restaurant Lesson 20 Appendix B Zone 2 Manual N Loads
Maria’s Restaurant Chapter 2 Section 8
Lesson 24 Appendix F Outside Air Calculation
Maria’s Restaurant Chapter 1 Section 2
Presentation transcript:

Maria’s Restaurant Chapter 1 Section 1

System Design Process

Manual N Commercial Load Calculation

Load Calculation Factors Typically, load calculations are simplified down to “total cooling tonnage per square foot of floor area”. This load calculation approach fails to take into consideration a variety of commercial building factors that greatly affect the choice of equipment and its capabilities, such as:

Load Calculation Factors Ventilation requirements: How much air must be brought in to meet safety and health related code requirements? How much makeup air is needed for exhaust systems for bathrooms and cooking equipment? Commercial Equipment: What is inside generating a heat load? Commercial lighting, computer systems, ovens, dishwashers, refrigeration, laundry, etc.

Load Calculation Factors Windows: How many? What size? What is the frame type? Does the glass have any special qualities like a Low-e rating? Which direction do the windows face? How much internal shading (blinds, drapes, etc.) do they have? How much protection does the external shading from overhangs or porch roofs provide for the windows? Skylights: What size? How many? What is the frame, glass and curb construction? Light shaft adjustment? What is the roof pitch where the skylights set? Which way do the skylights face (their orientation)?

Load Calculation Factors Door Traffic: What type of entrance doors are used and what is the frequency that they are opened and closed? Is there a shipping and receiving entrance that will be open often? Number of People: How many people are in the building? Insulation: Type and quantity in the walls, floors and ceilings (are all buildings really the same?) Duct System: The location and design of the duct system can have a very large impact on the heating and cooling system size and efficiency.

Load Calculation Factors Outside Air: Will the fresh air makeup meet the requirements for the exhausted kitchen air in cooking areas and the outside air required by the size of the building and total occupancy. Construction Materials: Is the building constructed from light-weight “stick built” or steel construction, versus heavy-weight masonry or concrete walls? Construction Practices: How “tight” is the building? Were special products (air/water wrapped) or procedures (caulking, sealing) used to prevent excess energy loss?

Manuals Referenced

Rooftop Package Heat Pump

Right Sizing Unfortunately, too many “designers” opt immediately to use the largest rule-of thumb-values in such a scenario, resulting in oversized equipment and botched designs. Using a Pocket Guide to design a system is just plain lazy and inappropriate!

Rules of Thumb

Break The Rules and Pay a Price

Load calculations vs the varying real time actual loads Even when a contractor performs a proper load calculation, the procedure is done based on full occupancy, at design temperatures, when the hottest and coldest temperatures reached for 99% of the hours in a year at the buildings location. But what happens when it is not hot? Or not cold? What happens in the fall or spring when the temperatures are milder? What happens when the building is not fully occupied? All of the “over sizing” issues listed for oversized equipment can still happen.

Gathering Load Calculation Data For a building that is already built, a thorough inspection of the building that includes measuring walls, documenting room size, and building equipment, etc., is needed. For a building in a strip mall like Maria’s, the first thing needed for a load calculation is a drawing that has the floor plan. Ideally, the floor plan should include equipment types and locations, along with conditioned and unconditioned areas.

Maria’s Restaurant Design (Staff: Maria & 7 Employees each shift. Glass Store Front and front door) C1 R1 F1 Woman’s Restroom 1 handicap 1 standard Men’s Restroom 1 handicap 1 urinal S3 Shelv.. R3 DW Bar 12 X 10 Seating 12 Counter C6 Bar S2 B2 Ice R4 Shelving/Storage 25 ft. Shelv. B1 C7 C2 Fry S1 Restaurant 33 X 15 11 X 4 & 11 X 6 Seating 58 CT/O C3 SP SK H1 R2 F2 WH S1 66 ft. B = Beverage Area R = Refrigerator (blue walk in C = Counter S = Sink; S1 Hand; S2 3 Pot; S3 Bar CT = 4 burner plus flat top over ovens SK= Steam Kettle DW = Dishwasher SP = Salad/cold Prep table F = Freezer (blue walk in) H1 = Hot Prep Table with Heat Lamp Shelf

Block Load A block load will often be completed for early, ballpark estimates during the bidding process. The block load only considers the building’s exterior walls, roof, and floors, and minimum code requirements.

Room By Room Load When awarded the job, a professional contactor will then perform a room-by-room heat loss/gain load calculations for each individual area in Maria’s restaurant. The area loads for individual rooms or sections are then totaled to show how much heating and cooling will be required for the entire building.

Exhaust Totals (Work Sheet 1) If you were provided with this table and did not have a code book available how would you determine the amount of airflow required if a piece of cooking equipment was removed and the kitchen exhaust hood size was changed to 10 linear feet?

Design Value 1 In Linear Feet (Work Sheet 1) If you were provided with this table and did not have a code book available how would you determine the amount of airflow required if the dishwasher hood size was changed to 4 linear feet?

Design Value 2 In Linear Feet (Work Sheet 1) If the two previous changes were made and the bathroom exhaust remained at 500 CFM, what would the new total exhaust be?

Charbroiler Exhaust Totals (Work Sheet 1) If an exhaust hood that was 11.5 linear feet long had the requirement of 550 CFM per linear foot due to extra heavy usage from because it covered a mesquite wood charbroiler, what would the exhaust fan total in CFM need to be?

Field Notes A brand new kitchen hood in a Chinese restaurant was not removing enough air resulting in smoke from the fryers and grilles getting into the cooking space. Pulleys and belts were changed to increase the airflow: still not enough airflow out through the exhaust hood.

Field Notes Another Technician finally checked the exhaust fan motor for direction and found out it was running backwards. The wiring was done by an electrician who did not know that a fan turning in the wrong direction moves less air. The motor wiring was changed so that the fan rotation direction was reversed and the “problem” was resolved.