Shilshole Bay Marina Customer Service Buildings

Slides:



Advertisements
Similar presentations
Presented by: Rod Meredith Assistant Director Public Works Riley County, KS Matthew Leaper Business Development Manager Johnson Controls, Inc. IMPLEMENTING.
Advertisements

Ft. Lauderdale Region Counties: Broward.
Architecture CAD living sleeping service SPACE PLANNING
MARIETTA MUNICIPAL COURT A presentation for MARIETTA CITY COUNCIL.
Images and text from HKT Architects – Project Architects.
Construction Project Michael J. Bruno Bruno Construction Management.
Leadership in Environmental Stewardship in a Fiscally Prudent Manner WAUKESHA COUNTY SUSTAINABILITY EFFORTS.
BATHS. Function The bath must be planned to be functional, attractive, and easily maintained. May also contain dressing, laundering, exercising, and sunning.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 25, 2012 EDUCATE  ENGAGE  EMPOWER 1.
Santa Rita Jail Going off the Grid Alameda County/RESCO CCAEA Meeting February 5, 2010.
Hope VI Residents Deserve Green Housing Affordable, Healthy Home Design Choices.
Green Building Design Scott Lowe Professor Civil and Environmental Engineering Department Manhattan College.
Expo Rail Operations and Maintenance Facility Expo Line Community Meeting Maintenance Facility Design Workshop January 23, 2012.
SUSTAINABLE RESIDENTIAL DESIGN PROJECT SIKESTON HOUSE Project 12 DS 413 MAY 8 TH, 2012.
EDSGN 100 Section 001 Team 5 Submitted To: Smita Bharti 10/16/2012
Team B.O.A.T. Ben A. - Tyler P. - Brandon R. - Andreina R. March 4 rd, 2011.
Fundamentals of Construction GTT – Unit 7 – Green Architecture
Renewable Technologies Available in Ireland Paul Kane.
EDSGN100 SECTION 006 TEAM 8 SUSTAINABLE LIVING. TABLE OF CONTENTS Title Page………………………………………………………………………………………………...1 Summary………………………………………………………………………………………………....3.
Woodland District 50: Operations and Facilities Report Energy Update 2012 Summer Work Five-Year Facility Plan Service Maintenance Agreement Night Time.
Net-Zero Energy Classroom! Lets Design a….  Active Solar – PV (Photovoltaic) Panels convert sunlight into electricity.  Wind Power – When the wind blows,
Presentation to HOK. 2rw.com NET ZERO ENERGY. SITE < or = renewable energy generated Building produces as much energy as it uses over the course of a.
ENERGY ASSESSMENTS, RETRO-COMMISSIONING AND TECHNICAL SUPPORT Eileen Westervelt | PE | CEM SEDAC, Program Director, Retro-Commissioning.
Renewable Power Generation Wind Energy Systems:  Fastest growing segment of renewable energy business (up 75% in capacity since 1990) Possible limitations.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Torrance Unified School District Bond Measure Y Bond Measure Z Quarterly Construction Update September 30, 2009.
PSU’s Finest Zero Energy Home Andrew Timmons, Josh Temple, Kurtis Myhre, Steven Fischer 1.
A presentation of The New Georgian Heights Alternative Elementary School for Columbus City Schools Board of Education 2 February 2010.
©2009 Strang, Inc. Orchard Ridge United Church of Christ September 20, 2009.
10 Turn off Lights Not in Use Motion Sensors simple ways to go green
Zero Energy Home’s Features and Appliances Interior and Exterior Features: Roofing Insulation Windows Energy Saving Appliances.
HOUSING AUTHORITY Kathleen Millar. Floor Plan- level 1.
The Sunshine Elementary School Redesign Proposal Pennsylvania State University AE Senior Thesis Nicholas Scheib Mechanical Option- IP.
LIVING AREAS. Living area Part of the house that friends and guest see. It is usually a place of show, recreation and entertainment. It roughly consumes.
Planning Team Facility Owner Local CTA/Facility Users Parks and Recreation Facility Manager/Tennis Professionals Facility Maintenance Design Professionals.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
Team 3. …Because the next generation of building is restorative. East Halls.
A SUSTAINABLE RESIDENTIAL DESIGN PROJECT PROJECT 10/DS 413/MAY 9, 2012.
The New Student Housing Building at The Mount St. Mary’s University Emmitsburg, Maryland Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007.
The Dominican Republic What can NSG do for You? 2014 Native Sun Group, Inc Meadowgrass Dr, Suite 101 Colorado Springs, CO Office: (719)
1 Five Year Capital Improvement Schedule Lancaster County School District
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 14, 2011 EDUCATE  ENGAGE  EMPOWER 1.
ZERO ENERGY DREAM HOME LAU’S PALS Matthew Vincenzi, Stephen Sawa, Clinton Wright, Vincent Vendetti March 2, 2011.
Kitchens, Laundry Areas and Baths Chapter 22. Objectives 1. Explain basic principles for designing efficient kitchens, laundry areas and bathrooms. 2.
1 Guinn School Restoration Update Presented by Transportation and Public Works Department February 17, 2009.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
White Pigeon Community Schools
BLAKELY  Welcome.
North Penn School District
THIS IS JEOPARDY.
Home Energy Savings Tips
Fun Facts: James M. Bennett High School
CITIZENS BLUE RIBBON COMMITTEE
Grunenwald Science and Technology Building
Humboldt energy project presentation
4 November 2013 LEHIGHTON AREA SCHOOL DISTRICT.
Electrical Gas Plumbing Heating & Cooling
Shilshole Bay Marina Customer Service Facilities
Kincaid Hall Renovation
Designing the tiny house
Moraga community Foundation
Northwest Hospital Childbirth Center Pre-submittal Meeting
David Salazar, Chief Facilities Executive
Park Encinitas HOA Solar Project Proposal
Facilities Modernization Program
How & When to Get Permits for Work in Your Home
MECHANICSBURG AREA SCHOOL DISTRICT WILDCAT ACTIVITY CENTER
INNOVATION lab MEP MECHANICAL/ELECTRICAL/PLUMBING :
Wayne State University Facilities Planning & Management
Dixon Middle School Project Update
Presentation transcript:

Shilshole Bay Marina Customer Service Buildings 60% Design Update (amended) Presented June 13, 2017

Welcome & Introductions Port Staff: Tracy McKendry – Director, Recreational Boating Mark Longridge – Capital Project Manager Rosie Courtney – Public Affairs Manager Designers: Marcel Bodsky – Project Manager, Tetra Tech Tom Roth – Lead Architect, Tetra Tech Project Team

Agenda Project Overview Design Overview & Details Sustainability Aspects Questions & Answers Topics for Tonight

Project Overview Goal: Update the facilities & improve the customer experience at Shilshole Bay Marina Primary Scope: 2 new larger South/Central Restroom & Laundry buildings (~2,600 sf each) 1 smaller North Restroom (~800 sf) Convert current M2 & M5 restrooms to utility buildings, demolish M4 & M6 What’s the Plan?

Project Overview Site Plan

Balancing All the Goals for the Best Design Project Overview Building/Design Goals Warm Energy Efficient Dry Sustainable Light Higher Capacity Comfortable Shorter wait times Easy Accessibility Better functionality Balancing All the Goals for the Best Design

Where Are We Now & What’s Next? Project Overview Schedule Currently at 60% Design Review Next stop 90% Design & Permit Submittal Final plans and bidding by March 2018 Construction scheduled to start Spring 2018 New facilities scheduled to open Fall 2018 Where Are We Now & What’s Next?

Where Are We Now, & What’s Next? Project Overview Schedule: Remaining Design Permit Approval (DCI) Prepare Final Bid Documents Bidding & Contract Award Construction 2017 2018 J J A S O N D J F M A M J J A S O N D Where Are We Now, & What’s Next?

Central Restroom, Looking Northwest Bike Storage Trash/Recycle Solar Panels Brick/Stone Veneer, Metal Siding Above Central Restroom, Looking Northwest

***Floorplan*** Fixture Count vs existing (all bldgs) (South/Central) Dashed line is building overhang ***Floorplan*** Fixture Count vs existing (all bldgs) Building size: 780 square feet Building size: 2,588 square feet Floorplans

Conceptual View of Womens Restroom Skylight for Natural Lighting Showers Counter Space with Outlets Bathroom stalls Radiant Floor Heating Conceptual View of Womens Restroom

Shower Layout – Private Stalls With Wet & Dry Areas ***Insert shower slide*** Locking Door on Stall FOB Activated Showers Wet Side Dry Side Shower Layout – Private Stalls With Wet & Dry Areas

Increases in Most Facilities, Especially Showers & Laundry Fixture Counts RESTROOMS Existing Proposed Change % Change Lavs 29 31 2 +7% Toilets 28 3 +11% Urinals 15 10 -5 -33% Showers 19 32 13 +68% LAUNDRY Washers 5 +100% Dryers 9 18 Utility Sinks 4 UNISEX PRIVATE FACILITIES 7 +75% Increases in Most Facilities, Especially Showers & Laundry

Site Amenities SECURE BIKE STORAGE BOTTLE FILLER WATER FOUNTAIN ~16 Bikes Per Storage Unit Polycarbon roof Glass sides FOB access SECURE BIKE STORAGE BOTTLE FILLER WATER FOUNTAIN DOG WATER DISH BIKE REPAIR CENTER Site Amenities

Typical Site Amenities Dog wash located outside large buildings with tempered water DOG WASH! Typical Site Amenities

Committed to Sustainable Design Sustainability Sustainable and responsible business practices are integral to the Port's strategic business objectives.  Planning for: Solar Photovoltaics (PV) rooftop arrays Geothermal heat pump HVAC systems Committed to Sustainable Design

Committed to Sustainable Design Sustainability Solar Photovoltaics Arrays on each of the larger buildings (South & Central) Up to 50kW systems per building, producing around 52,000 kWh in an average year (average Seattle homes consume ~12,000kWh/yr) Goal is to cover over 65% of total restroom electrical load, and 100% of the ground source heat pump load Paired with high efficiency design throughout (low flow fixtures, LED lighting etc) Committed to Sustainable Design

Committed to Sustainable Design Sustainability Geothermal Heat Pumps Use much less energy than conventional heating systems, since they draw heat from the ground. Not only does this save energy and money, it reduces air pollution. Like an air source heat pump, but uses the natural consistency of ground temperature to heat the building Committed to Sustainable Design

Committed to Sustainable Design Sustainability Geothermal Heat Pumps Paired with radiant heating in larger buildings offers system with over 500% efficiency rating Committed to Sustainable Design

Committed to Sustainable Design Sustainability Geothermal Heat Pumps The Port’s first Geothermal heat system, but used in many other local projects and jurisdictions. King County Libraries Newcastle Branch Tukwila Branch Duvall Branch Snohomish School District Valley View Middle School Seattle School District Adams Elementary School Madison Middle School Veteran’s Administration American Lake Campus Snohomish PUD Headquarters Lake Washington School District Carl Sandburg Elementary Committed to Sustainable Design

Committed to Sustainable Design Sustainability Many geothermal systems possible. Closed vertical loop system selected for larger buildings at Shilshole. Requires 5-10 wells, each 300’deep Committed to Sustainable Design