EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review

Slides:



Advertisements
Similar presentations
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 7 of 12 EMI/EMC 1 GLAST Large Area Telescope LAT Pre-Shipment Review EMI/EMC Michael.
Advertisements

GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT Instrument GLAST Monthly Mission Review October 29, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 29, 2007 Ken.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.
LAT EQUIPMENT EMI REQUIREMENTS PART TWO CONDUCTED EMISSIONS AND SUSCEPTIBILITY.
GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 1 Monthly Mission Review Project Status Overview July 12, 2007 Neil Johnson.
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 1 Monthly Mission Review TVAC at NRL? Status July 12, 2007 Neil Johnson.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 1 LAT Environmental Test Planning and Design Review 3-4 May 2005 LAT EGSE and.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Current Status Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of 12 1 GLAST Large Area Telescope Pre-Environmental Test Review EMI/EMC.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Diagnostics Framework James Swain Stanford Linear Accelerator.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
LAT Environmental Test PDR1 GLAST LAT Project 3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 EMI/EMC LAT Environmental Test.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectI&T&C Pre PDR Presentation – Oct 2, 2001 B. Grist1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
10-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : EMC Dave Curtis Mars Atmosphere and Volatile EvolutioN.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT Project April 27, 2006: LAT Pre-Ship Review Presentation 10 of 12 Mechanical Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review Mechanical.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Instrument Configuration by File James Swain Stanford.
GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
LAT EMI Test LAT test levels derived from LAT-SS-0778 Use CAL EMI test procedure as template –LAT-PS Test Suite: –CE102 Conducted Emissions, Power.
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Gayle K. Martin November 14, 2016
I&T&C Organization Chart
GLAST Large Area Telescope:
Mechanical Integration
Environmental Test Planning
GLAST Large Area Telescope:
LAT Requirements Verification in TVAC
Integration and Test GLAST Large Area Telescope:
GLAST LAT System Engineering
GLAST Large Area Telescope
GLAST Large Area Telescope:
Electrical Ground Support Equipment Verification Test Support
GLAST Large Area Telescope:
GLAST LAT System Engineering
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope:
GLAST Large Area Telescope
Thermal Vacuum Test: Plans and Procedures
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
Integration and Test Organization Chart
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST LAT System Engineering
Integration and Test Organization Chart
GLAST Large Area Telescope: I&T Test Readiness Review
Introduction and Overview
Integration & Test Instrument Operations Coordination
Design Integration and Analysis
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Presentation transcript:

EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review Gamma-ray Large Area Space Telescope GLAST Large Area Telescope LAT Pre-Shipment Review EMI/EMC Neil Johnson NRL Michael Lovellette Stanford Linear Accelerator Center EMI/EMC

Purpose / Contents Demonstrate readiness to proceed with EMI/EMC testing of the integrated flight instrument, i.e. the LAT: Test requirements are complete LAT has been appropriately tested at lower levels of assembly Passes comprehensive systems test EMI/EMC test plans and procedures complete Facilities readiness and certification verified STE and MGSE complete, fabricated, and ready for use Manpower is sufficient to cover all planned for activities EMI/EMC

Requirements complete All flight system design analyses and unit testing have been successfully completed Mission System Spec  433-SPEC-0005 EMI Environments LAT Environmental Requirements Spec  LAT-SS-00778 LAT Performance Verification Plan  LAT-MD-00408-04c Verification test definition EMI Test Plan  LAT-MD-0027261-01 LAT EMI-specific operating modes have been defined LICOS scripts and supporting displays are in development EMI/EMC

Subsystem EMI/EMC Test Summary

Radiator Subsystem EMI/EMC Issue VCHP heater Radiated Emissions testing S/C power source for LAT VCHP heaters is an unfiltered DC-DC converter. Concern is the conducted noise for this power source will become radiated emission issue for LAT system test. This issue shall be resolved by special subsystem (Radiator) test – RE102 – using simulated S/C power source. The test will be performed just prior to LAT system EMI/EMC test. Preliminary testing of this at SLAC gives reasonable confidence that there is no significant issue here. EMI/EMC

LAT EMI Test LAT test levels derived from LAT-SS-0778 Test Suite: CE102 Conducted Emissions, Power Leads, 10 kHz to 10 MHz, MIL-STD-462, CE03 CECM Conducted Emissions, Time Domain, 150 MHz Bandwidth CS102 Conducted Susceptibility, Power Leads, 10 kHz to 10 MHz, MIL-STD-462, CS02 CSCM Conducted Susceptibility, Common Mode, 30 Hz to 150 MHz, MIL-STD-462, CS02 CS06 Conducted Susceptibility, Spike, Power Leads, MIL-STD-462 RE101 Radiated Emissions, Magnetic Field, 20 Hz to 50 kHz RE102 Radiated Emissions, Electric Field, 10 kHz to 18 GHz, MIL-STD-461E RS101 Radiated Susceptibility, Magnetic Field, 20 Hz to 50 kHz RS103 Radiated Susceptibility, Electric Field, 30 MHz to 18 GHz Verify by Analysis: RS103 Radiated Susceptibility, Electric Field, 18 GHz to 40 GHz Static Magnetic Field EMI/EMC

LAT Power Interfaces Heater circuit power interfaces are not tested. SC-LAT Power Interfaces SC PRU (P) - LAT PDU SC PRU (R) - LAT PDU SC PRU (P) - LAT SIU (P) SC PRU (R) - LAT SIU (R) SC PRU (P) - LAT VCHP +Y Heaters SC PRU (P) - LAT VCHP –Y Heaters SC PRU (R) - LAT VCHP +Y Heaters SC PRU (R) - LAT VCHP –Y Heaters SC PRU (P) - LAT Makeup Heaters (Survival) SC PRU (R) - LAT Makeup Heaters (Survival) Heater circuit power interfaces are not tested. EMI/EMC

Test Limitations RS103 upper limit of 18GHz (40GHz) 18 – 40 GHz addressed by analysis. Limited area of RS101 test Requires scanning each 10cm x 10cm area, ~16min/scan ~1450 scans for the LAT, another ~1200 for the radiators (~29 days) Scan selected locations around connectors, PMTs, BEA Limited R (redundant) side conducted testing Emissions tests and susceptibility only where noted on Primary side EMI/EMC

EMI Test Configuration Performed in NRL anechoic chamber ESD bags will be removed during active testing. Bags in place for transport and inactive periods. GN2 purge to control humidity Active cooling w/ LAT chiller system Path finder of LAT instrument on the test stand in NRL’s anechoic chamber EMI/EMC

Test Layout LAT Chiller Connection EMI/EMC

Conducted Test Considerations Fully test Primary: SC PRU (P) - LAT PDU (P) SC PRU (P) - LAT SIU (P) Limited test of Redundant: (as a result of Primary findings) SC PRU (R) - LAT PDU (R) SC PRU (R) - LAT SIU (R) No plan to test PRU - LAT Survival Heaters Thermostatic control, open circuit at LAT operating temp Not active with LAT operating in Mission No plan to test PRU - VCHP Heaters EMI/EMC

Test Harnesses Radiated testing will used nominal EGSE cables Harness is fully shielded Includes all connector savers Any test ports are closed out or have shielded harnesses Test harnesses are shielded Accelerometers TCs & thermistors Breakout cables required for conducted emissions testing LAT-DS-06531 LSC to RF shield, SIU power LAT-DS-06530 BPU PNL to LSC, SIU power LAT-DS-06528 BPU PNL to LSC, LSC to DAQ, DAQ power EMI/EMC

Test Software Emissions Testing – Script # LAT-171 LAT configured to collect muons with additional periodic trigger to appropriately populate the T&DF data flow and science data stream to the VSC. Susceptibility Testing – Script # LAT-181: LAT configured to collect muons with CAL triggers (flight level) and ACD vetos enabled. Susceptibility monitoring TKR event occupancy CAL pedestal widths (noise) and trigger rates ACD pedestal widths (noise) and veto rates T&DF commanding and data flow errors Real time monitoring Strip chart of most susceptible TKR tower/tray occupancies Strip chart of CAL / ACD trigger rates Strip chart of LAT trigger rate and deadtime Diagnostic error messages Post processing Global TKR occupancy vs time Global CAL, ACD pedestal widths vs time EMI/EMC

Personnel EMI/EMC Test Director - Michael Lovellette EMI/EMC Facility Operations Mike Obara - Test Conductor Tony Grey - Test Conductor LAT Instrument Operations Brian Grist – Operations Lead Standard LAT I&T Operators and Online analysis support EMI/EMC

EMI/EMC Test Summary Ready to test Facility ready to support test No outstanding issues with subsystem testing except completion of radiator VCHP heater CS / RE verification Supporting analyses for static magnetic field have been accepted by Blanchette for GLAST project Supporting analysis for RS103 18 – 40 GHz performance is in progress. Need closure of ACD contribution to the analysis with Blanchette. EMI/EMC

RE102 - Integrated LAT EMI/EMC

RE101 – All LAT Equipment EMI/EMC

CE102 Spacecraft PRU – LAT DAQ EMI/EMC

CE102 Spacecraft PRU – LAT SIU, VCHP Htrs EMI/EMC

Conducted Emissions Common Mode EMI/EMC

RS103 Perform – LAT EMI/EMC

RS101 Perform – LAT EMI/EMC

CS102 Spacecraft PRU – LAT DAQ EMI/EMC

CS102 Spacecraft PRU – LAT SIU, VCHP Htrs EMI/EMC

Conducted Susceptibility Common Mode EMI/EMC

CS06 Operate – All LAT Equipment EMI/EMC

CS06 Perform – All LAT Equipment EMI/EMC