Urban Runoff Pollution Ordinance 2017 Proposed Update

Slides:



Advertisements
Similar presentations
Internalizing Stormwater Requirements Between TBR and Facilities Construction Projects and Permanent Stormwater Treatment Mgmt. Steve Casey, PE, CPESC.
Advertisements

Stormwater Management Program Training Presented By FAU Environmental Health & Safety Phone: Fax: Web:
1 Overview of Regulations for Water Quality Protection in South Carolina n Federal Clean Water Act/ NPDES Storm Water Program n South Carolina Pollution.
Implementing Committee Meeting May 15 th, 2014 New Braunfels MS4 program and the HCP 1.
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
Evaluation of Private Property I/I Sources for Sanitary Sewer Evaluation Study City of Grand Rapids – E. Leonard Heights Area Presenter: Jay Zawacki, CDM.
RIPDES Storm Water Program: Municipal Separate Storm Sewer Systems (MS4s)
Upper Providence Township Stormwater Management MS4 Program.
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
Austin Peay State University Stormwater Program Kristen Spicer, Ph.D.
Stormwater, Wellhead Protection and Drainage Issues Public Hearing.
Ferguson Township Municipal Separate Storm Sewer System (MS4) Stormwater Management Program (Our MS4 Story) April 6, 2015 Board of Supervisors Meeting.
June 19, 2014 CONTROL OF TRASH ENTERING WATERWAYS IN CALIFORNIA DRAFT WATER RESOURCES CONTROL BOARD POLICY.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
Regulatory Refresher The Municipal Regional Permit Kristin Kerr, P.E., QSD EOA, Inc. Municipal Maintenance Training Workshop May 23, 2013.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
Env 247 Overview of Stormwater Management March 1, 2011.
SLIDE 1 Sustainable Stormwater Management May 6, 2015 Blue Highways: Transportation and Stormwater Management in Virginia Ginny Snead, PE Richmond Office.
MRP Pollutants of Concern Copper Provisions Monday November 20, 2006 Richard Looker - RWQCB.
The purpose of the San Dieguito Union High School District’s stormwater management plan is to comply with applicable stormwater regulations, educate.
California Venue and Event Recycling Legislation Review of AB 2176 Model Ordinance For Waste Reduction at Venues and Events.
Background and Overview Stormwater NPDES Compliance For New Developments.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
Response to Comments Workshop Presented by: Eric Beck, P.E. RIDEM July 24, 2003 Developed by: Laura Stephenson, Greg Goblick, Margarita Chatterton.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork City of Southlake Storm Water Management Plan Christi Upton
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
Introduction to MS4 Stormwater Requirements (2009)
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
Construction & Post-Construction Stormwater Ordinance City of Wenatchee, Public Works Department Jessica Shaw, Environmental Manager.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Workshop on the draft General Permit for Discharges of Storm Water from Small MS4s Fresno August 6, 2002 Redding August 8, 2002 San Luis Obispo August.
Stormwater Treatment and Flow-Control Requirements in Phase I and Phase II Municipal NPDES Permits Dan Cloak, Principal Dan Cloak Environmental Consulting.
State of Connecticut Department of Transportation Stormwater Management Plan CONNECTICUT DEPARTMENT OF TRANSPORTATION Bureau of Policy and Planning Cynthia.
Regulatory Refresher What Construction Site Inspectors Need to Know about the MRP Kristin Kerr, P.E., QSD EOA, Inc. Construction Inspection Workshop April.
Stormwater and C.3 Overview Tom Dalziel, Assistant Manager Contra Costa Clean Water Program.
Phase II National Storm Water Regulations What’s in it for you?
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
 The Illinois Environmental Protection Act is silent with regard to storm water.  Illinois EPA’s authority to deal with storm water derives from delegated.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
County-Wide Act 167 Plan “County-wide Act 167 Stormwater Management Plan for Chester County, PA” was prepared by: Chester County Water Resources Authority.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
Commercial, Industrial, and High-Risk Runoff 6/13/20161 Commercial, Industrial and High Risk Runoff.
Municipal Code Title 16 Update: Liquid and Industrial Waste Disposal Board of Water Commissioners November 10, 2014 Item 5.
1 Staff Public Workshops Fall 2011 Policy for Siting, Design, Operation and Management of Onsite Wastewater Treatment Systems San Luis Obispo: October.
Why the Need for Increased Stormwater Funding? Citizens expect a higher level of protection from flooding Increased development.
Briefing regarding the new State General Stormwater Pollution Control Permit.
Water Efficiency Ordinance ZCA No. 750
Sewer Code Update (Title 13)
MS4 & Construction Storm Water Permits
Municipal Separate Storm Sewer System (MS4) Permit
Stormwater Management and MS4 Compliance
Proposed Water Neutrality Ordinance
Advanced Environmental Management (AEM) Training Phase I
PENNSYLVANIA STORMWATER BEST MANAGEMENT PRACTICES MANUAL
Town of Melbourne Beach
Summit County MS4.
Land Use and Zoning Committee Special Workshop
Sacramento County Stormwater Quality Program
Stormwater Management Program
GREEN INFRASTRUCTURE PLAN FOR (Permittee)
Model Water Efficient Landscape Ordinance
Overview of US EPA & State Manure Management Regulations
MS4 OVERVIEW 2015.
City Council Meeting November 14, 2016
Vehicle & Equipment Maintenance/Cleaning
MS4 = Municipal Separated Storm Sewer System
Sacramento County Stormwater Quality Program
Rule 5/6/13 Conversion to General Permits
Presentation transcript:

Urban Runoff Pollution Ordinance 2017 Proposed Update Dean Kubani Assistant Director of PW/Chief Sustainability Officer Department of Public Works

Background The Urban Runoff Pollution Mitigation Ordinance was established in 1995 by the Santa Monica City Council Purpose control pollution associated with rainwater, stormwater and dry-weather runoff. comply with the standards and regulations of the Clean Water Act Updates adopted in 2000 and 2010 to comply with new Clean Water Act regulations The Urban Runoff Pollution Mitigation Ordinance was established in 1995 by the Santa Monica City Council requiring temporary construction, permanent post-construction, and daily “good housekeeping” Best Management Practices in order to control pollution associated with rainwater, stormwater and dry-weather runoff. The goal is to reduce runoff volume and thereby pollution, and to comply with the standards and regulations of the Clean Water Act, e.g., the National Pollutant Discharge Elimination Systems (NPDES) Permit. The Ordinance was updated in 2000 and 2010 to comply with new Clean Water Act regulations, and to shift the focus to Low Impact Development and Green Infrastructure solutions.

Proposed Changes: Introduction Overview: The 2017 update brings the ordinance into compliance with the 2012 NPDES Permit. Proposed Changes: Update the definitions to reflect the changes in 2012 NPDES Permit. Correct challenges for implementation and customer compliance: Stronger anti-litter, fugitive trash, covered receptacles language. Discharge associated with draining water features and testing fire suppression. Language for the Marine Debris (trash) Total Maximum Daily Load. Annual inspection requirements. Transfer of property procedures. Mandate a new strategy for onsite harvesting and use.

Proposed Changes: Definitions Sample definitions to be updated: Bio-filtration Bio-retention Dechlorinated/Debrominated Swimming Pool Discharge Demolition Green Infrastructure Green Roof Pressure Washing/Sidewalk Rinsing Stormwater Quality Design Volume (SWQDv) Trash

Proposed Changes: New Ordinance Requirements Plastic or rubber pellets: Facilities which handle, store or utilize plastic or rubber pellets shall comply with provisions of the City’s Plastic Pellet Management Plan, in order to meet Federal guidelines. Swimming pools, hot tubs, spas, fountains and water features shall drain to an onsite permeable surface or to the sanitary sewer. Any drainage to the storm drain system must be approved at least 24 hours in advance and the drainage shall not create a safety issue or public nuisance. Help to address challenges that the City has had in the past in complying with the requirements of the National Pollution Discharge Elimination System requirements

Proposed Changes: New Ordinance Requirements Discharges from building fire suppression system maintenance or testing require a minimum 24-hour advance notice to the City’s Water Resources Protection Program. Property owners with Post-construction BMPs shall be responsible for annual inspection and maintenance, as well as for verifying the system’s compliance through submission of the City’s annual compliance form. The transfer of any property with Post-construction BMPs shall include, as a written condition to the transfer, that the transferee (new owner) assumes full responsibility for the onsite BMPs.

Proposed Changes: New Ordinance Requirements The generation of “fugitive” trash (trash escaping from a unsealed container) by runoff, wind or animal activity is prohibited. Property owners who repeatedly violate this provision may be required to berm, wall or curb areas that are generating said trash, in addition to providing sealed containers. The City shall maintain a map designating areas within the City where it has been determined that certain types of Post-Construction BMPs are not appropriate, e.g., Palisades Bluffs, sites with contaminated soils, etc.

Proposed Changes: Mandated Onsite Collection and Use New development on parcel > 15,000 sq.ft. Capture, store and use 100% of the runoff mitigation volume from the development This requirement applies to new building permits, not building permits already in the review queue. This requirement applies to new buildings and major or substantial remodels, e.g., where at least 50% of the building shell and interior are impacted. For any new construction requiring runoff mitigation (minimum is 15,000 square foot parcel), the Runoff Mitigation Plan shall demonstrate that the applicant will store and use 100% of the runoff mitigation volume (SWQDv). This stored water shall be used to replace municipal potable water for non-potable applications and will not be subject to the Runoff Reduction Fee (unless otherwise designated by appropriate City staff). If the mitigated volume is more than the non-potable water demand for the site, then the surplus mitigation volume shall be addressed via another solution, such as infiltration or fee in lieu. This requirement applies to new building permits, not building permits already in the review queue. This requirement applies to new buildings and major or substantial remodels, e.g., where at least 50% of the building shell and interior are impacted.

Recommended Action Introduce for First Reading Ordinance to Update and Clarify Municipal Code Chapter 7.10 - Urban Runoff Pollution Control For any new construction requiring runoff mitigation (minimum is 15,000 square foot parcel), the Runoff Mitigation Plan shall demonstrate that the applicant will store and use 100% of the runoff mitigation volume (SWQDv). This stored water shall be used to replace municipal potable water for non-potable applications and will not be subject to the Runoff Reduction Fee (unless otherwise designated by appropriate City staff). If the mitigated volume is more than the non-potable water demand for the site, then the surplus mitigation volume shall be addressed via another solution, such as infiltration or fee in lieu. This requirement applies to new building permits, not building permits already in the review queue. This requirement applies to new buildings and major or substantial remodels, e.g., where at least 50% of the building shell and interior are impacted.