Bellevue Utilities Seismic Work

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

New Mexico Infrastructure Finance Conference, October 28, 200.
Pierce County Emergency Operations Presented by Ken Parrish Pierce County Emergency Management Pierce County Department of Emergency Management *EMAP Accredited*
Cowlitz-Lewis Economic Development District th Avenue North, Adm. Annex, Kelso, WA Ph: ; FAX:
EBMUD: A Decade of Seismic Mitigation Progress – More Work to Do By Bill Cain, S.E. Project Manager Seismic Mitigation Planning Member, ABAG Lifeline Infrastructure.
Tigard_WSP_0410. Existing System Miles of Pipe 2.Twenty One Pressure Reducing Valves (PRV) 3.Seven Pump Stations 4.Two Aquifer Storage and Recovery.
Cornerstone Engineering Group The Foundation for Your Civil Engineering Needs Camanche Reservoir Water Treatment Plant Project Cecilia Zamora Evangelina.
Washington County, Oregon March 19, 2014 Board Meeting Engineering Department Report.
 Groundwater Supply ◦ Quantity ◦ Quality  Infrastructure ◦ Treatment ◦ Transmission ◦ Distribution  Response Plans ◦ Long-term ◦ Short-term ◦ Emergencies.
Water Security: Progress to Date and Future Trends U.S. Conference of Mayors – Urban Water Summit September 30, 2005 Ken Thompson, CH2M HILL Jay West,
1 NCR Water Security Monitoring Network In the NCR Presented by Jim Shell Principal Water Resources Planner Metropolitan Washington Council of Governments.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
2015 Needs Assessment Our Strategy for Success Scott Torpie Washington State Office of Drinking Water.
PNCWA Operators Conference Eastern Oregon Region AWWA/PNCWA Short School Water Project of the Year City of Arlington Mesa Industrial Park Water System.
WSNTG Annual Conference 8 th September 2005 WSNTG 9 th Annual Conference “Water Services Strategic Plans – Fact or Fiction”
1 Recent Accomplishments and Opportunities for 2007 ~WEROC~ Kelly Hubbard WEROC Emergency Manager Municipal Water District of Orange County WACO, January.
Planning for Resiliency. Primary Reference Emergency Management Principles and Practices for Healthcare Systems, The Institute for Crisis, Disaster and.
TACOMA WATER RESILIENCY Providing Clean, Reliable Water Now And In The Future.
US Army Corps of Engineers BUILDING STRONG ® Texoma and Missouri Region JETS Training Symposium Resiliency Planning Through Hazard Vulnerability Analysis.
Risk management and disaster preparedness
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
Prioritizing Booster Pump Station Improvements Tom Peters, P.E. May 2, 2008.
Earthquake Response and Recovery Planning at a Major Canadian Electric Utility Presented by Doug McLeod Disaster Preparedness Coordinator BC Hydro British.
Regional Planning for Sea-Level Rise in Hampton Roads Benjamin McFarlane, AICP Regional Planner NOAA Hydrographic Services Review Panel October 26, 2011.
ITTS Freight in the Southeast Conference Charlotte, North Carolina February 9, 2011.
Sustainable/Resilient Communities in Monmouth County September 10, 2008 Sea Level Rise & Coastal Resiliency Jon K. Miller 1 & Thomas O. Herrington 2 1.
Lessons Learned from a Basic Vulnerability Assessment and Emergency Response Plan Update Project in Greensboro NC AWWA / WEA Annual Conference, Raleigh,
Eastside Reservoir Site Drainage and Leakage Issues Attachment 4A.
1 Caribbean Disaster Mitigation Project Implemented by the Organization of American States Unit for Sustainable Development and Environment for the USAID.
2015 HURRICANE SEASON PREPARATIONS March 18, 2015.
Mutual Aid Program by Drake Rice, OMPA Asset Inventory Working Status Reserve Funds.
2015 Eastern Oregon Region AWWA/PNCWA Operator’s Conference Water Project of the Year City of Stanfield’s Water System Improvements.
Water Advisory Board March 29, Annual rainfall
ORGANIZATIONAL PERSPECTIVE FOCUS AFGHANISTAN FOCUS implements disaster risk mitigation and preparedness programs in vulnerable communities. It also extends.
Library Renovation Projects Capital Improvement Plan 2009 – 2014.
1 Highland Water District CAPITAL IMPROVEMENT PLAN.
Threat of Flooding in the Green River Valley Public Health and Medical Response Briefing Healthcare Coalition Quarterly Meeting August 17, 2010.
World War I Veteran’s Camp in 1934, Lower Matecumbe Key (Islamorada area)
Strength through History & Innovation City of Beaumont Salt Mitigation Feasibility Study Summary of Findings.
1 Emergency Management Overview Scott Ritzer Emergency Response and Security Enbridge Pipelines Inc.
City of Parkland Vacant Land Plan. Outline  Community Input  Demographics Analysis  Levels of Service  Equity Mapping  Recommendations.
Water System Seismic Study and Emergency Response Planning
Drought Hazard Planning Cody Knutson
San Bernardino County OES
Strategic Planning Update
Creating a SUSTAINABLE Utility
DORSET Water System Information Meeting
Caribbean Disaster Mitigation Project Implemented by the Organization of American States Unit for Sustainable Development and Environment for the USAID.
Water Cooperative of Pierce County
The Richmond Regional Planning District Commission
Disaster Resilience: Pre-Event Planning for Recovery
An Introduction to the 2015 Needs Assessment and Survey Paige Igoe Washington State Office of Drinking Water Official name is Drinking Water Infrastructure.
Northern Education Action Plan
MERRICK & COMPANY CHARLOTTE WATER INSTITUTE
Caribbean Disaster Mitigation Project Implemented by the Organization of American States Unit for Sustainable Development and Environment for the USAID.
Pacific Power Seismic Preparedness Update
Focus Group Committee Chairs
VII. Earthquake Mitigation
Presented by [Name] [Date]
PRO Plan Update: Capital Improvement Plan List
State Homeland Security and Emergency Management
Agency Logos. Hazard Mitigation Grant Program Summer 2018 California Wildfires and High Winds DR-4382.
Project Tracking Results
The Foundation of Capability:
NWS 101 John P. Moore, III NWS Jackson, MS.
Effects of Disasters on Wastewater Treatment and Collection Systems
Everett Water Supply Resiliency
Fire Rescue Services 2019 Core Budget.
Community Organizations Active in Disaster (COAD) Overview
Planning Partner Adoption Multi-Jurisdictional Hazard Mitigation Plan
Presentation transcript:

Bellevue Utilities Seismic Work Historical and On-going Seismic Work Various studies (e.g., 1996 Seismic Vulnerability Assessment) Seismic retrofits of water reservoirs Water storage improvements Incorporation of then-current seismic standards into new facilities Mutual aid agreements Future Seismic Related Work Groundwater Master Plan complete in 2018 Seismic Resiliency Study complete in 2019 Update/refine geologic and seismic maps Perform distribution system seismic vulnerability assessment Use results to develop short-term and long-term seismic recommendations Fold recommendations into Capital Improvement Program

City of Kirkland Emergency Response Storage Containers Full of Essentials

City of Redmond Completed Structural Upgrades of Education Hill 2 MG and 3 MG Reservoirs Completed Structural Upgrades of Rose Hill North Tank (shared project with Kirkland) Structural Upgrade of SE Redmond Reservoir Planned in 6 year Capital Improvement Program Increased focus on Emergency Response Planning and Training

Sammamish Plateau Water Seismic Resiliency Initiatives 2014 Seismic Vulnerabity Assessment Study Low hanging fruit Anchored batteries, cabinets, piping Operational modification Bracing above grade piping 2018 Capital projects Reservoir anchorage foundation improvements, design - construction 2017-2020 Pipeline seismic resistance study 2017 Reservoir isolation seismic valves design and construction 2017-2018 Expanded inventory based upon critical assets, piping, couplings etc. 2014 Emergency response plan updated. 2015 Expanded material storage and installed fueling site, emergency food and radio communications. 2017 SCADA upgrade – added redundancy two servers, remote access and stand alone remote facilities. Ongoing monthly emergency planning committee and continuity of operations. Participate in regional exercises. Rate model recognizing funding requirements /It takes stewardship and funding. Community Schools: in-class visits and field trips Organizations: Kiwanis/Rotary, Library, etc. Government Elected officials Water Organizations: CWA, WASWD, American Water Works Assoc. Business and Industry Chamber of Commerce, HOAs

Skyway Water & Sewer District 2003 Water Tank Seismic Upgrades 2004 Vulnerability Assessment 2004 Local Hazard Mitigation Plan 2015 Emergency Operations Plan 2015 Partner - KC Regional Hazard Mitigation Plan 2015 Member - WA WARN Mutual Aid & Assistance 2017 Priority Telecomm Services (GETS, WPS, TSP) Ongoing - emergency food/water/staff supplies

Tukwila Water Utility Seismic Work Historical and On-going Seismic Work Various studies (e.g., 1996 Seismic Vulnerability Assessment) Seismic construction of concrete reinforced North Hill Reservoir with a capacity of 2 million gallons. Water system assessments Participation in the 2016 Cascadia Rising Event Future Seismic Related Work Seismic Resiliency Update as part of the Tukwila Water Supply Plan Update Perform pipeline system seismic vulnerability assessment Add recommendations into Asset Management and the Capital Improvement Program