Introduction Six-Month Follow-Up on Action Items of Feb 2016 CEBAF Field Emitter Workshop Rongli Geng September 12, 2016.

Slides:



Advertisements
Similar presentations
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Advertisements

LINACs Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
Spreaders & Recombiners Beam Transport Michael Bevins May 30, GeV Upgrade - Beam Transport Spreader/Recombiner Dipoles and Layout, & Installation.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
NML/RFCA002 Status ILC Cryomodule meeting 3 July 2012 E. Harms.
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
Warm Girder UHV Components John Heckman Anthony DiPette Vacuum Group 2/29/2016.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
Evolution of Field Emission Characteristics Selected C100 Cryomodules Michael Drury.
Paolo Michelato, July 19-22, 2006 Global Design Effort 1 Vacuum system segmentation Cold vacuum system segmentation reflects the cryogenic structure of.
ELENA installation progress F. Butin / ELENA collaboration.
C100 summary of performance degradation - VTA to Cryomodule Ari Deibert Palczewski SRF Scientist July 5, 2016.
ASTA Latest Update E. Harms April Photoelectrons first produced at ASTA on 20 June 2013 –Molybdenum (uncoated) cathode ‘Routine’ Electron operation.
Field Emitter Workshop Summary Rong-Li Geng 2016 CEBAF StayTreat June 28-30, 2016.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
Recent Result for the STF-2 Cryomodule Operation
SRF Operating Experience at JLab
LCLS-II Technical Requirements
S1G Experiment Schedule Plan
Preliminary Review of LERF as Cryomodule Testing Facility for LCLS-II
2K Cold Box FDR Introduction
Field Emission Minimization for LCLS-II
MuCool Test Area Dedicated facility built at the end of the Linac to address MuCool needs RF power 805MHz, 201MHz)
LCLS-II Cost Details E. Daly / C. Hovater / M. Wiseman with help from Accel Ops and Engineering 03-AUG-2017.
CEBAF Accelerator Status
NL C100 Vacuum Spikes and Valve Trips
DESY Experiences on Use of Gas overlay during Assemblies
S0 Status report from KEK
Definition of work flow for string DESY Example on critical operation
Why are we removing our very good gun?
Spoke CDS PDR Closeout J. G. Weisend II June 10, 2016.
C50 Cavity pair Assembly Changes
SNS Operational History
Operational Experience - Field Emission
WP 3 coordination meeting Saclay May 2008
Regular cryomodule maintenance plans (radiation damage, seals, etc)
UITF beamline installation
Cryomodule (C20, C50, C100) Field Emission Performance to Date
C75 Risk Assessment Geoff Krafft
Greg Marble, Rongli Geng
E. Daly / K. Jordan / C. Hovater / T. Hiatt 03-AUG-2017
Laboratory Directed Research and Development (LDRD) Proposal
TTC Hot Topic Common Questions
Thoughts on Energy Reach
Update on Dark current generation in ILC Main Linac
C75 Commissioning Michael Drury SRF Operations Support
Advanced Research Electron Accelerator Laboratory
Performance Recovery at CEBAF
A. Freyberg Aug 2016 ECT’16 =>
Polarized Source: Recent Activities
Outline: Recent CEBAF performance JLAB-TN-022 Energy Reach Plan
LCLS-II Cryoplant Controls Workshop.
Extraction Michael Bevins May 17, 2007
Tasks, Responsibilities Expectations and Needs
UITF beamline installation
Executive Project Kickoff
Workshop Aim Rongli Geng February 29, 2016
Field Emission and Mitigation in the CEBAF Linacs R Legg, R Geng Jlab SRF Ops Dept. TTC,
Undulator Alignment Plan
JLab Users Organization Annual Meeting June 24, 2019
QCM and C50-12 Status Update
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Residual Gases in CEBAF Warm Beam Line Sources and Evacuation
General Overview of WP 12 ESS Vacuum System
Presentation transcript:

Introduction Six-Month Follow-Up on Action Items of Feb 2016 CEBAF Field Emitter Workshop Rongli Geng September 12, 2016

Workshop Feb 29, 2016 NL12 Meeting May 25, 2016 Today Six-month follow-up Sep 12, 2016 CEBAF StayTreat June 28-30, 2016 Feb Mar Apr May Jun Jul Aug Sep Oct C50-12 commissioning @ NL12 NL12 Girder C50-12 Installation C50-12 CM assembly CMTF testing NL12 Girder Removal C50-12 pairs VTA testing

Workshop Action Items # Actions Owner 1 Determine the source of field emission degradation during the string assembly and tunnel installation SRF 2 Determine the next generation beamline vacuum systems. Try to get a new system in time for the C50-12 installation this summer. SRF/VAC/OPS 3 Halt all ion-pump hi-potting on CEBAF and LERF systems. Develop a path forward, which might include replacing the pumps that need hi-potting. VAC/ENG/OPS 4 Develop a particulate transport model for CEBAF. SRF/CASA/OPS 5 Develop an improved temporary clean room environment for tunnel work. VAC/SRF 6 Determine the particulate generation characteristics of ion pumps, gate vales*. SRF/VAC 7 Develop a beam line venting procedure for low particulate movement.

The Workshop Mini-workshop on beam-line field-emitter particulates in CEBAF SRF linacs February 29, 2016 https://www.jlab.org/indico/event/139/ JLAB-TN-16-008 https://jlabdoc/docushare/dsweb/Get/Document-117729/16-008.pdf

Goal Evaluate field-emission impact to operation of CEBAF SRF linacs. Identify the root cause(s) of particulate field-emitters in operational SRF cavities, with a focus on the particulates originating from the UHV beam-line components. Develop solutions for “particulate-free” beam-line components for future SRF linacs as well as mitigations against accumulated field emitter particulates for operational SRF linacs.

Topics Observations and experiences with beam-line particulates and correlation with field-emission. Sources of particulates in UHV beam-line components. Roles of condensed residual gases. Mechanisms of particulate transportation in UHV beam-lines. UHV beam-line component design for lowest particulate generation. UHV beam-line component cleaning, handling, assembly and operation procedure for lowest particulate generation. Mitigation against field-emitter particulate in operational SRF linacs. Techniques for removal of accumulated field emission particulates. UHV beam line-particulate detection technique. Fast detectors for in operando monitoring of field-emission turn on.

Sources of C100 FE Onset Degradation 90% FE onset degradation originated from field emitters introduced into cavities before they were placed in tunnel

NL12 Meeting - May 25, 2016

NL12 Meeting – May 25, 2016

white board photos attached. 1 NL12 removal and associated warm girders :SRF:OPS: ========================================== <2016-05-25 Wed 09:00> 1.1 Attendees ~~~~~~~~~~~~~ Akers, Suhring, Drury, Reilly, Krafft, Reece, Geng, Dipette, Coopers, Wright, Benesch (briefly)

1.2 Workscope ~~~~~~~~~~~~~ * 1.2.1 Present Workscope + Remove NL12 and install and install C50-12 + Requires warm up on NL11, NL12 and NL13 - NL11 already warm

* 1.2.2 Proposed Additional Workscope + 1.2.2.1 Warm Girders + Remove upstream and downstream warm girders + Take vacuum surface particulate swipes in tunnel as soon as accessible, prior to removal from tunnel. + Move warm girders to SRF workspace + Disassemble warm girder so that vacuum pipes can be processed by SRF - requires quadrupole to be disassembled - Special care with BPM + process (clean) vacuum surfaces of warm girder + assemble warm girder + leak check + move to tunnel + install on beam line + 1.2.2.2 Valve Change out + internal manual valves on NL11 and NL13 to be replaced with new or rebuilt valves. + valves on the warm girders to be replaced with new or rebuilt valves. + 1.2.2.3 Ion Pumps + Preferred option: new particulate free ion pumps to be installed on NL12 and NL13. (so call B pumps) + Next preferred option: new ion pumps to be installed on NL12 and NL13. + This applies to the ion pump on the cryomodule and the ion pump on the warm girder.

1.3 Schedule Highlights ~~~~~~~~~~~~~~~~~~~~~~~ * 1.3.1 Present Schedule + [2016-06-22 Wed] Beam Terminates + [2016-06-27 Mon] NL12 Removal + [2016-06-08 Wed] C50-12 Installation * 1.3.2 Proposed Schedule + Warm up on NL12, NL13 starts when beam terminates [2016-06-22 Wed] + Installation group to work 5th pass separator, 6T YR removal in parallel with module warm up: [2016-06-22 Wed]--[2016-06-27 Mon] + When NL11, NL12, NL13 are warm start the warm girder removal, nominal date of [2016-06-27 Mon]. + plan to have the warm girders returned to the tunnel by last week in July [2016-07-25 Mon]. + Advance the NL12 removal if convenient

1.4 White Board Action Items ~~~~~~~~~~~~~~~~~~~~~~~~~~~~ + Beamline valves, it is ok to use rebuilt beam line valves on the warm girders? + rebuilt manual valves are already used inside the cryomodules. + *ACTION* provide guidance on the use of rebuilt beamline valves in the warm region. Who: Reilly/Drury When: [2016-06-15 Wed] + Ion pump replacement, are the ion pumps sufficiently particulate free? Is there a better choice out there? + Rongli recommends Agilent as a better ion pump than the present CEBAF choice. + *ACTION* compare the present ion-pump choice with comparable models (pump speed) and make a decision on ion-pumps for the cryomodules and warm-regions. If desired, purchase some pumps for testing. Once decision is made, communicate the make/model number of Pam Kjeldsen so that the controls group can start programming the controls interface. Who: Reilly/Geng When: [2016-06-08 Wed] + SRF staff has a detailed assembly procedure for LCLS-II that CEBAF might benefit from. + *ACTION* Reilly and Dipette will coordinate Installation Staff cross training on SRF procedure. Who: Reilly/Dipette When: TBD + Is the present ownership paradigm correct? SRF own the module, Installation/Vac group owns the warm region vacuum. + *ACTION* Reilly/Dipette to discuss possible changes and/or develop a more integrated approach that has the two groups working to the same specification.

The Follow-up It has been about six months since the February 29 mini-workshop on field emitter particulates in CEBAF beamlines. Progresses have been made or are being made in several fronts related to the action items, all aligned with the goal of understanding and reduce field emission in CEBAF. A six-month follow-up is deemed conducive to the final goal of reversing the "lost gradient" in CEBAF. Toward that end, a special PIT meting is to be conducted on September 12, 2016 to allow capturing and measuring the initial results of all efforts related to the action items.