FHWA Updates/News Benjamin Beerman, PE Federal Highway Atlanta, GA (404) 562.3930
Overview Publications via FHWA TRB NCHRP AASHTO Deployment Activities AASHTO/SHRP2 R04 FHWA/EDC AZDOT Showcase ABC-UTC ACCELBridge
Old Publications (but still good) www.fhwa.dot.gov/bridge/prefab/pubs.cfm
New Publications 2011 New New 1. 2. 3. 1. https://www.fhwa.dot.gov/bridge/abc/docs/abcmanual.pdf 2. https://www.fhwa.dot.gov/bridge/pubs/hif17020.pdf 3. https://www.fhwa.dot.gov/bridge/pubs/hif17019.pdf
FHWA Tech Notes Old http://www.fhwa.dot.gov/publications/research/infrastructure/structures/14084/index.cfm
FHWA - Tech Notes New www.fhwa.dot.gov/publications/research/infrastructure/structures/bridge/16080/index.cfm New Two Supplementary manuals to the FHWA’s ABC www.fhwa.dot.gov/publications/research/infrastructure/structures/bridge/16081/index.cfm
ABC Subcommittee Reorganization AFF10 General Structures – parent committee AFF10(3) – Subcommittee for ABC AFF00 – Design Section (parent) AFH00 – Construction Section AFF00(2) Joint Subcommittee for ABC www.trbaff103.com Old New
Meeting & Workshop materials is posted www.trbaff103.com 2017 Meeting & Workshop materials is posted
Research Workshop Topics www.trbaff103.com 1.) Estimating Total Cost of Accelerated Bridge Construction 2.) ABC Project and Research Databases 3.) Closure Joint Alternatives for ABC Projects 4.) Integral Abutment Details for ABC Projects 5.) Prefabricated Railing Systems for ABC Projects 6.) Seismic Performance Studies of Precast Bridge Connections to Components to Bridge Systems
www.trbaff103.com 2017 Industry Poll Ongoing!
Industry Poll Topics www.trbaff103.com 1.) Development of guidance for establishing effective and efficient timelines and incentives for ABC 2.) Planning, design, fabrication, and installation strategies for Modular Decked Beam (MDB) elements 3.) Performance comparison of in-service full-depth precast concrete deck panels to cast in place decks 4.) Labor, equipment, and production rates for Accelerated Bridge Construction 5.) Best Practices used for Strategic Public Communications for ABC projects 6.) Updating the "Best Practices in Accelerated Bridge Construction Techniques" report 7.) Rapid Construction of Pre-fabricated Substructure elements for Durable and Sustainable Bridges using Fiber Reinforced Polymers (RFP)
12-98: Guidelines for PBES Tolerances and Dynamic Effects of Bridge Moves 12-102: Development of an ABC Design and Construction Specification 12-105: System Performance of ABC Connection in Moderate-to-High Seismic Regions
Quality Assurance Essentials and Case Studies for ABC DELIVERABLES 5 Case Studies on QA on ABC Projects within State DOTs Quick Reference Guide – Field Reference for Defects Overall Guide Document for QA in ABC Contact Kelley Severns, P.E. 859-433-9623 severnsk@pbworld.com note: Questionnaire
SHRP2 R04 - Training Innovative Bridge Designs for Rapid Renewal Toolkit States to Date Arkansas Florida Illinois Iowa Louisiana Michigan Montana Nebraska New Jersey New Mexico Pennsylvania South Carolina South Dakota Wisconsin Contact Finn Hubbard 608-831-3238 fhubbard@fishassoc.com
https://collaboration. fhwa. dot https://collaboration.fhwa.dot.gov/dot/fhwa/WC/Lists/Seminars/ DispForm.aspx?ID=1269
Monthly ABC Webinars: (75th webinar to date!) Today – Feb. 17 , 2017 1:00 to 2:00 p.m. EST VTrans Programmatic Implementation of ABC
www.abc-utc.fiu.edu 170 Technical Papers 9 four hour workshops: -Geo Tools for ABC -LWC, part 1 & 2 -DB & CMGC procurement -Lateral Slide Overview -LRFD concrete & steel -GRS-IBS www.abc-utc.fiu.edu
www.accelbridge.com/Pages/default.aspx 2 Bridges completed in Nov. 2016 1 of 2 a VECP $15.00 UHPC vs. $ 7.00 PT vs. $ 1.25 ABridge www.accelbridge.com/Pages/default.aspx
Thank You! FHWA Benjamin Beerman, P.E.