ESS Program Plan and Schedule Update

Slides:



Advertisements
Similar presentations
Line Efficiency     Percentage Month Today’s Date
Advertisements

Unit Number Oct 2011 Nov 2011 Dec 2011 Jan 2012 Feb 2012 Mar 2012 Apr 2012 May 2012 Jun 2012 Jul 2012 Aug 2012 Sep (3/4 Unit) 7 8 Units.
Spoke test in vertical cryostat IPNO-UU Meeting on spoke test program, 2 nd -3 st October 2013 IPNO Team.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
1 Upper Basin Snowpack as of 3/26/2014
H-ECCTD - KICK-OFF MEETING 16TH MARCH 2016 GENERAL INTRODUCTION Florence ARDELLIER.
Christine Darve ESS deputy WP leader Pierre BOSLAND, CEA Saclay External WP5 leader With special Acknowledgment to Nuno Elias (ESS) and Gilles Olivier.
Pierre Bosland 4 TH OF FEBRUARY 2016 COORDINATION COMMITTEE FR-SW AGREEMENT STATUS OF THE FRENCH ACTIVITIES UNDER THE RESPONSIBILITY OF CEA.
THE ESS ELLIPTICAL CAVITIES CRYOMODULES STAT US ON THE CEA SACLAY ACTIVITIES P. BOSLAND & F. ARDELLIER TAC13 07 th APRIL 2016.
Accelerator/Elliptical Cavities Cryomodules Pierre BOSLAND, CEA Saclay External WP5 leader Christine Darve, ESS deputy WP leader
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
ESS WP4 Strategy for series production ESS TAC10 – 5th to 6th November Lund Sébastien Bousson WP 4 leader.
H-ECCTD KICK-OFF DEVELOPMENT PLAN AND SCHEDULE 16/03/2016.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
P. Bosland CEA-Saclay Collaboration Board meeting Copenhagen 14/04/ Status of the French activities under the responsibility of CEA Philippe CHOMAZ.
WP High Beta Cavities Delivery
Status of the M-ECCTD F. Peauger - P. Bosland
Jan 2016 Solar Lunar Data.
WP5 Elliptical cavities
SPF MAG Quarterly Report – Feb 2015
MLC Schedule Plan Proven in-house expertise and infrastructure for fabrication, assembly, and testing cryomodules Confident in our technical expertise.
Documentation process in WP 4 & 5 Goal: To collect all documentation needed in a structured way for the ESS Accelerator installation, commissioning, operation.
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
CMS RPC Endcap RE1 Status Report
Average Monthly Temperature and Rainfall
<Location> – <Project Name>, Sponsor: <name>

Sentinel-2 Status Update
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16
PCS Day - Feedback 23th November 2016, Vienna.
MONTH CYCLE BEGINS CYCLE ENDS DUE TO FINANCE JUL /2/2015
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
GANTT CHART can be used for scheduling generic resources as well as project management. They can also be used for scheduling production processes and.
ESS Project Status Roland Garoby – Technical Director August 2018.
Electricity Cost and Use – FY 2016 and FY 2017
Ciprian Plostinar Workshop on Testing and Commissioning
Daresbury ESS In-Kind Contributions
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Overall time schedule of SRF activities
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
NEMSIS V3.5.0 Timeline developed at NEMSIS Annual Meeting 2017
XRN Feb 19 Minor Release - Status Update
LCLS-II Cryoplant Controls Workshop.
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
CNRS contribution to ESS – 01/02/17
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
How Do We Define Acceptance of a Cryomodule? - A Discussion
IKCA CEA Technical ANNEXES Follow up 18th DECEMBER 2015.
Accelerator Installation Schedule
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Globus-M2 will be constructed by the end of 2015
XRN 4954 – MiR Drop 5 - Status Update
XRN 4927 – MiR Drop 4 - Status Update
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
SNS-PPU upgrades the existing accelerator structure
ACCSYS Collaboration Board Triestre, 3rd october 2017
TEL031 ODL Analytics Main Activities
Change Management E2E Roadmap
General Overview of WP 12 ESS Vacuum System
CryoModule Calibration & Measurements Configuration Management Tools (CMCMCMT) aka CM3T because no one came up with a better name Nuno Elias, Paolo.
Presentation transcript:

ESS Program Plan and Schedule Update Christine Darve 4th SRF Collaboration Meeting https://ess-ics.atlassian.net/wiki/display/CRYOM/2016-09-08+%3A+4th+SRF+Collaboration+Meeting+@+CEA CEA- Saclay September 8, 2016

Outline Overall ESS planning for the elliptical Linac Ready of Installation dates Main plan change to launch the High-beta serie production on time Next step with the installation and commissioning preparation … Zoom in ( previous talk on magnets and cavity)

Overall planning

Ready for Installation (in P6 September 2016) Activity ID Activity Name Start A20143980 LEVEL2.2G.ACCSYS.WP04.Ready For Installation (RFI) SPK 1st CM - CNRS 16-Jul-2018* A20143990 LEVEL2.2G.ACCSYS.WP04.Ready For Installation (RFI) SPK 2nd CM - CNRS 21-Jul-18 A20144000 LEVEL2.2G.ACCSYS.WP04.Ready For Installation (RFI) SPK 3rd CM - CNRS 13-Aug-18 A20144010 LEVEL2.2G.ACCSYS.WP04.Ready For Installation (RFI) SPK 4th CM - CNRS 20-Aug-18 A20144250 LEVEL2.2G.ACCSYS.WP05.Ready For Installation (RFI) MBL 1st CM - CEA-Saclay 03-Sep-18 A20144020 LEVEL2.2G.ACCSYS.WP04.Ready For Installation (RFI) SPK 5th CM - CNRS 10-Sep-18 A20144030 LEVEL2.2G.ACCSYS.WP04.Ready For Installation (RFI) SPK 6th CM - CNRS 17-Sep-18 A20144270 LEVEL2.2G.ACCSYS.WP05.Ready For Installation (RFI) MBL 2nd CM - CEA-Saclay 19-Sep-18 A20144040 LEVEL2.2G.ACCSYS.WP04.Ready For Installation (RFI) SPK 7th CM - CNRS 08-Oct-2018 A20144050 LEVEL2.2G.ACCSYS.WP04.Ready For Installation (RFI) SPK 8th CM - CNRS 15-Oct-2018 A20144280 LEVEL2.2G.ACCSYS.WP05.Ready For Installation (RFI) MBL 3rd CM - CEA-Saclay 17-Oct-2018 A20144060 LEVEL2.2G.ACCSYS.WP04.Ready For Installation (RFI) SPK 9th CM - CNRS 05-Nov-18 A20144070 LEVEL2.2G.ACCSYS.WP04.Ready For Installation (RFI) SPK 10th CM - CNRS 12-Nov-18 A20144290 LEVEL2.2G.ACCSYS.WP05.Ready For Installation (RFI) MBL 4th CM - CEA-Saclay 21-Nov-18 A20144080 LEVEL2.2G.ACCSYS.WP04.Ready For Installation (RFI) SPK 11th CM - CNRS 03-Dec-18 A20144090 LEVEL2.2G.ACCSYS.WP04.Ready For Installation (RFI) SPK 12th CM - CNRS 10-Dec-18 A20144300 LEVEL2.2G.ACCSYS.WP05.Ready For Installation (RFI) MBL 5th CM - CEA-Saclay 19-Dec-18 A20144100 LEVEL2.2G.ACCSYS.WP04.Ready For Installation (RFI) SPK 13th CM- CNRS 14-Jan-19 A20144310 LEVEL2.2G.ACCSYS.WP05.Ready For Installation (RFI) MBL 6th CM - CEA-Saclay 06-Feb-19 A20144320 LEVEL2.2G.ACCSYS.WP05.Ready For Installation (RFI) MBL 7th CM - CEA-Saclay 13-Mar-19 A20144330 LEVEL2.2G.ACCSYS.WP05.Ready For Installation (RFI) MBL 8th CM - CEA-Saclay 20-Mar-19 A20144340 LEVEL2.2G.ACCSYS.WP05.Ready For Installation (RFI) MBL 9th CM - CEA-Saclay

2016 Annual review planning – Pierre B. Hold point Release of Hbeta component production LASA to launch the Mb serie cavity production STFC to launch the Hb serie cavity production

LASA /ESS ESS/CEA

STFC/ESS ESS/CEA

TAC13 - CRYOMODULES Time SCHEDULE (baseline) CRYOMODULES ASSEMBLY & TESTS M-ECCTD : CDR-M is now planned in March 2017 If the 4th cavity is delivered in November. Any additionnal delay has a direct impact on the planning. Medium Beta Cavities are on the critical path if the 1rst 4 cavities are delivered in November 2017. Couplers of the series are close to the critical path. P. Bosland TB17 Lund 17th March 2016

CRYOMODULES Time SCHEDULE (baseline) CRYOMODULES ASSEMBLY & TESTS Some data inputs & analysis : Minimum delay expected after the delivery at Saclay of the 4th cavity and the completion of the cryomodule assembly: 2 months for the M-ECCTD and first cryomodules of the series Cavities & couplers are closed on the critical path : - Delivery rate for cavities : 4 items / month 1st batch of 4 Medium-b cavities required : nov 2017 1st batch of 4 High-b cavities required : nov 2018 Risks : No margin for technological and procurement issues The 2nd Mbeta cryomodules is assembled without waiting the tests results of the 1rst one. No time for lessons learned at the beginning of the series production process. M-ECCTD is built and tested with « Saclay prototype cavities »

See the presentations by Pierre and Roger at the TB18 (June 2016)

See the presentations by Pierre and Roger at the TB18 (June 2016) Zoom in ( previous talk on magnets and cavity)

See the presentations by Pierre and Roger at the TB18 (June 2016)

Next step with the installation and commissioning preparation OLD VERSION

Team Work ! Yes we can !