CROSSTOWN LRT Construction Liaison Committee June 14, 2017.

Slides:



Advertisements
Similar presentations
MBTA Groundwater Action Plan Dr. Steve J. Poulos, P.E.
Advertisements

11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Presentation to Maxwell Place Homeowners Association 1.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
City of Little Rock Public Works – Traffic Engineering Division City of Little Rock City of Little Rock Dallas Phasing Implementation Rodney Parham Road.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
Northwest ISD Samuel Beck Elementary School Addition and Renovations, 2012.
Community Reference Group Meeting #3 MITCHELL FREEWAY EXTENSION Burns Beach Road to Hester Avenue Chris Raykos Project Director Infrastructure Delivery.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Project Overview Ward 31 Ravine Meeting November 4, :00 to 9:00 p.m. Presteign-Woodbine United Church.
 The Project Team › Design, Planning & Construction:  Hubbell, Roth & Clark, Inc. (HRC)  Grissim, Metz, Andriese Associates (GMA)  O’Neal Construction.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory.
Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.
Indian Hill Grade Separation City Council Meeting February 23, 2016.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
District VI, Florida Department of Transportation BARRIER DESIGN ALTERNATIVES FOR CRASH MITIGATION SE 2 nd Avenue and Biscayne Blvd Way (SE 4 th Street)
White Pigeon Community Schools
MD 30 (Hanover Pike) at Mt. Gilead Road
I-66 OUTSIDE THE BELTWAY Shrevecrest HOA JUNE 21, Susan Shaw, P. E
Four Winds Condominium Association August 2, 2017
The I-465 West Leg Reconstruction Project
JUAN DE FUCA PEDESTRIAN CROSSING Transportation and Public Infrastructure Committee Colwood, BC 1 October 2012.
June 5, 2017.
Operations and Service Concept
$150K Chicago/ANL seed funding for Braidwood site investigation
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
DICKINSON AVENUE RECONSTRUCTION
The Oakton Condominium Association September 12, 2017
Pilot Project Evaluation
Low Level Road Project – Traffic Management Meeting August 2012
After the NACTO Guide Now I’m going to discuss the options available within the NACTO Urban Bikeway Design Guide.
Clinton Street Bridge over the Maumee River
Graduate Circle Housing Proposal for the Pennsylvania State University
Citrus Park Drive Extension
Transportation Projects
Parkland/Brookdale Interceptor Replacement
Davisville Junior Public School / Spectrum Alternative Senior School
SE 12th Street Roadway Improvements February 8, 2005.
August 28, 2018.
Endorsement of the Recommended Design Concept (Preferred Alternative) for Transforming I-66 Outside the Beltway Board Transportation Committee October.
PROJ. 566(17) LOR PID MAJOR WIDENING
25th Avenue Grade Separation
25th Avenue Grade Separation
ARIZONA WATER COMPANY East Sedona Water Storage Facility
Contract 60X10 Informational Meeting Weber I-55
Meadow Lake Boulevard Street Extension Project
Acton Extension Update
PUBLIC HEARING S.R. 30 (U.S. 98 Business/West Garden Street)
Protected Bicycle Lanes Finally Pedal Their Way to KC…
February 14, 2019.
M14A/D Select Bus Service
Walker Street Reconstruction Project 25% Design Public Hearing
Construction Considerations
Harbour Island Force Main Replacement
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
2019 Capital Program Title of Presentation
The Paterson Redevelopment
Metropolitan District | mndot.gov
Utility Relocation: 11th/Mill
May 9, 2019.
New Hanover Comprehensive Plan
Presentation transcript:

CROSSTOWN LRT Construction Liaison Committee June 14, 2017

Agenda Leaside Station Update Laird Station Update

Leaside Station Concept: Aerial View Main Entrance Accessible Entrance Outdoor bicycle parking Accessible Entrance Secondary Entrance *60% rendering

Leaside Station: 2016 in Review Demolition at 1787 Bayview Ave completed Median Removals & temporary traffic signals installations Utility relocations (hydro & telecommunications), underway or complete Support of excavation (shoring) work started at Main Entrance

Leaside Station: What to Expect in 2017 Year Quarter Construction Activity / Closure 2017 Q1 (Jan-March) Bell, hydro and other telecom utility relocations Support of excavation (shoring) underway at Main Entrance Stage one for support of excavation activities in right of way (work will be completed in 4 stages) Q2 (April-June) Stage one ongoing Drill to move to Secondary Entrance in late June/early July Temporary Site Service Connections (hydro) Dewatering System Installation Q3 (July-Sept) Stage one B Stage two support of excavation activities in right of way Q4 (Oct-Dec) Stage three of support of excavation activities in right of way

How We’re Building Leaside Station: Support of Excavation Shoring is a common step in the process of installing the foundation of a building. In the first stage, an area the size of the station’s footprint (about 100m x 20m) will have steel piles installed around the perimeter. Then a shallow area is excavated and braces and tie-backs are installed around the sides to support the excavation. Decking is then placed over the excavation to allow the crew to work under the roadway safely while traffic flow resumes above. The shoring stage at Leaside Station started in January and will take approximately 15 months to complete.

How We’re Building Leaside Station: Excavation and Mining During the excavation, crews continue to work safely beneath the roadway. At Leaside Station a section of the station box will also be mined during this time. With the mining method, the underground area to be excavated is divided into manageable segments and the segments are excavated in a planned sequence. The excavation creates a shotcrete-lined cavern underneath Eglinton Avenue East. Within the cavern, the station box is constructed accommodating the rail tunnels, associated platform and rail infrastructure.

Support of Excavation (shoring): Station Box Mined Area

Support of Excavation (shoring): Stage One A. Wong discussed the safety concerns regarding traffic light lead/lag phasing presented in the previously reviewed TTMP and CTS’ options to address these concerns. A. Wong presented five scenarios (A, B, C, D & E) that detail different feasible (must have separated WBL and EBL turns due to turning path overlap) phasing options. A. Wong noted that Scenario A (protected EBL/restricted WBL) and Scenario B (EBL/WBL split phase) are the most feasible to be safely implemented, and that specifically Scenario A is recommended by CTS due to the operational advantages. The remaining proposed scenarios are Scenario C (leading EBL/lagging WBL), Scenario D (protected EBL/permissive WBL) and Scenario E (protected-permissive EBL/restricted WBL). Questions & Comments: · P. Hillier noted that Scenario E is similar to Scenario A and asked why this option was not included in CTS’ preferred options. · A. Wong responded stating that there was concern with the pedestrian movements and driver-pedestrian sightlines. · P. Hillier asked if the EBL queue can be addressed with just protected. · A. Wong noted that results from the Traffic Study showed that the PM peak presented a 50m 95th percentile queue. · L. Lui asked if the length of the EBL queue can be expanded. · A. Wong noted that he would take a look to see if additional space can be provided. · P. Hillier asked if the COT could review the traffic analysis prepared for the Scenario A, B & E. · A. Wong responded stating that CTS would provide the documents today. · R. Stewart asked what the timing is associated with this decision. · J. Sestito noted that a response from the COT is required immediately as the construction team is waiting to install the temporary lights. · M. Huk expressed concern regarding the typical number of ambulance turning movements to head north onto Bayview and that this needs to be considered in the scenario option decision. · R. Shamess noted complaints from the SW corner condo regarding WheelTrans pick-up/drop-offs and access issues. · P. Hillier is not convinced that the EB protected left is required.

Proposed Stage 1B

Proposed Stage 2

Progress Picture – Main Entrance

Progress Picture – Station Box

Laird Station Concept: Aerial View Main Entrance (accessible entrance) S Laird Drive Secondary Entrance Eglinton Ave E *60% rendering

How We’re Building Laird Station: Support of Excavation Laird Station will be constructed using a mined method known as Sequential Excavation Method or SEM. The first stage is support of excavation. Support of excavation (shoring) is a common step in the process of installing the foundation of a building. In the first stage, crews will install steel piles around the perimeter of the entrance. This has been completed at both entrances. In the second stage, crews excavate the area level by level, installing braces and tie-backs as they progress. This work is underway at the main entrance. Support of Excavation (Shoring) Shoring is a common step in the process of installing the foundation of a building. This will support the surrounding loads until the underground levels of the building are constructed.

How We’re Building Laird Station: Sequential Excavation Mining Method Mining occurs from inside of the excavated entrances after the support of excavation is complete. This work now underway at the secondary entrance. The underground area to be excavated is divided into manageable segments and the segments are excavated in a planned sequence. Within the mined area, the station box is constructed accommodating the rail tunnels, associated platform and rail infrastructure. Laird station has one of the longest station areas with approximately 500m to be mined. This is to accommodate special track to store a LRV between the tracks or for an LRV to change direction in the event of a service disruption.

Laird Station: 2016 in Review Geotechnical Investigation completed Demolition at 250-256 Laird Drive completed Utility relocations (hydro & telecommunications) Piling work completed and excavation work started at both entrances Temporary traffic signals installations

Laird Station: What to Expect in 2017 Year Quarter Construction Activity 2017 Q1 (Jan-March) Site Service Connections - Completed Excavation (shoring) underway at Main (underway) and Secondary entrance (completed) Long-term closure at Main entrance – in place Q2 (April-June) Crane erection secondary entrance – completed Mining operations at Secondary entrance - underway Dewatering System installation - underway Concrete pour into tunnels - underway Utilities protection Gas Main Support - underway Sewer Lining - upcoming Crane erection main entrance – upcoming Excavation ongoing at Main entrance Q3 (July-Sept) Ongoing mining operations at Secondary entrance Start of mining operations at Main entrance Q4 (Oct-Dec) Mining continues at both entrances (mid 2017 to late 2019)

Laird Long Term Closure

Support Works – Utilities Mitigation What to expect: Sewer Lining Sewer lining is a process intended to increase the durability of the sewers. A section of the sewer system is cleaned and vacuumed and a CCTV inspection is completed. Then a liner is inserted into the sewer section from within the maintenance holes The process is designed to be generally non-disruptive and eliminates the need for excavation of the entire sewer section. Maintenance holes that will be accessed are located on Eglinton Avenue East between Sutherland Drive and Brentcliffe Road. Lane closures will be required for this work. Pedestrian access will be maintained. Above ground pipes will be in place between maintenance holes to bypass pump around the sewer lines during the liner installation. Due to the nature of the work, an unpleasant chemical odour may be noticeable in the vicinity of the maintenance holes and, in some circumstances, in the home. It is not harmful, however it can be limited by covering floor drains while the sewers are being lined. A public notice with additional details will be distributed prior to work beginning.

Support Works – Utilities Mitigation Sewer Lining Activity Examples What to expect: Sewer Lining

Progress Picture – Main Entrance

Progress Picture – Secondary Entrance

Local Area Map Station(s) under construction

Community Benefits – Laird Mural Creation of a mural that reflects the Thorncliffe Park neighbourhood Design concept under development Production/painting is scheduled for the first week of July (July 4-7) Feedback welcome!