ARUC: Water/sewer management

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

Subterranean Success: Geothermal Energy Powering Schools
ANTHC DIVISION OF ENVIRONMENTAL HEALTH & ENGINEERING Wagner ANTHC Rural Energy – Washeterias Briefing for the Arctic Research Commission January 2014 Daniel.
Summer 2014 Internship Projects John Venables Alaska Center for Energy and Power 1.
Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.
Energy efficient technology and equipment implementation in plumbing and heating installations УКРІНТЕРМ 2011.
ARUC Alaska Rural Utility Collaborative CDR John Nichols, PE, ARUC Manager.
Energy Efficiency and Renewable Energy
WOODFUEL FOR THE CONSTUCTION INDUSTRY Architects Point of View + Building Regulations.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
Reducing Energy Consumption The DWP approach Case Study 3.
Alaska Village Electric Cooperative Toksook Bay, Alaska Wind Working Group Brent Petrie Anna Sattler Nome, AK November 2010.
WP Inc. Case STUDY 3.1 Problem Solving Jonathan Stanley & Kari Eddings
Energy Performance Contracting Approach David Birr President Synchronous Energy Solutions.
Renewable Technologies Available in Ireland Paul Kane.
A Bowman Microturbine at the Holiday Inn January 20, 2004 Brian Inglett Presents SIMMAX ENERGY.
Fremont County – Green Spring 2012 Research Team: Jacob Tolman, Justin Andersen, Thresia Mouritsen, Joseph Huckbody, John Beck Feasibility Study.
Rory McIlmoil, Downstream Strategies. Introduction to distributed energy The case for distributed renewable energy Opportunities for developing distributed.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
Server Virtualization: Navy Network Operations Centers
Managing Your Energy Costs Energy Webinar Series This Activity received funding from the Department of Climate Change and Energy Efficiency as part of.
M&V Part 1: D.O. Review. 1-2 Your Instructor Mark Stetz, P.E. Ø Worked with FEMP since Ø Serves as FEMP’s M&V Specialist. Ø Contributed to FEMP.
Green Building Creating sustainable and high performance buildings.
ARUC: Multi-Tribe Utility Management Alaska Rural Utility Collaborative John Nichols, PE, ARUC Manager John Nichols, PE, ARUC Manager.
Alaska Municipal League 59th Annual Local Government Conference The Programs of the Alaska Energy Authority Energy and Empowerment for Your Communities.
ARUC Alaska Rural Utility Collaborative John Spriggs, Utility Program Coordinator John Spriggs, Utility Program Coordinator John Nichols, PE, ARUC Manager.
CHP & DG METERING & MONITORING IN NEW YORK STATE CASE STUDIES AND IMPLEMENTATIONS Presented By: STEPHEN STONE, PE DSM ENGINEERING ASSOCIATES, PC
Micro-hydropower for the home, farm, or ranch: A brief overview
National Department of Public Works Republic of South Africa National Department of Public Works Republic of South Africa 02 APRIL 2002 JAMES MASEKO DIRECTOR-GENERAL.
California Energy Commission Funded Research Project
Carlos Cantú.  Renewable energy  is energy which comes from natural resources such as sunlight, wind, rain, tides, and geothermal heat, which are renewable.
Retro-commissioning: 15% savings 10 The New Low Hanging Fruit: Run what we have efficiently.
LeadingAge Achieving Green Savings and Sustainability Session 171.
Program for installing heating systems using renewable energy, including the replacement or completion of classic heating systems Between July 15, 2010.
Massachusetts Clean Energy Center Budget Overview
Making Health Facility Safe Through Facility Management
McLean County Regional Water Consolidation Project
Tier Certification Explained
Education Efforts that Accompany Rural Water and Sanitation Projects
Frank Dick, PE Aaron Kraft Wastewater Engineer Project Manager
Seminar On Energy Audit Submitted To: Submitted By:
Guaranteed Energy Savings Performance Contracting
Mn Association of County Planning and Zoning Administrators
Energy Savings Projects
Saving Money and The Environment
Case sample of a CT option
Toronto Waterfront Scan and Environmental Improvement Strategy Project - Economic Opportunity in a Sustainable Waterfront Presentation to the Federation.
Dan Reitz, P.E. Rural Energy Program Manager
Industrial Assessment Center Database
Collaboration with other government entities
Annual Water and Sanitation Renovations for the Arctic
Rural Utility Business Advisor & Remote Maintenance Worker State of Alaska Technical Assistance Programs Carrie Bohan, ADEC.
It can be as easy as turning down a thermostat.
Eric Hanssen, P.E., LEED AP, CEM ANTHC Rural Energy Initiative
Instructor: Mark Fennell
Across the entire value chain
Client Name Energy & Water Assessment August 27, 2014
Alaska O&M Challenges John Nichols, MS, PE ARUC Manager, ANTHC.
Critical Review of the Malawi Community Energy Model
Award-Winning Strategies for Cost Savings in Districts
“Smart City: Future Perspectives”
The Engineering and Maintenance Division
ALASKA VILLAGE ELECTRIC COOPERATIVE Energizing Rural Alaska since 1968
RELIABLE, & AFFORDABLE ENERGY SOLUTIONS
Metropolitan Mayors Caucus Illinois Energy Bills
Choosing the Right Project
Basic overview of an EMS
All Africa Housing (PTY) LTD
Building a “FutureFit” Silicon Valley
Procurement Opportunity:
Presentation transcript:

ARUC: Water/sewer management Mike Black,Director Department of Rural Utility Management Services (DRUMS) ANTHC

ARUC Philosophy Building infrastructure is the first step Management of infrastructure is next Protect investment (life of system) Minimize ‘repair by replacement’ Maximize health impact of system Reduce cost to operate Strength in numbers: 26 communities working together, instead of each struggling alone

Ambler Kobuk Kiana Noorvik Selawik Deering Golovin Savoonga St. Michael Kotlik Russian Mission Pitkas Point Holy Cross Chevak Sleetmute Upper Kalskag, Lower Kalskag Tyonek Toksook Bay Quinhagak Newhalen New Stuyahak Goodnews Bay South Naknek Chignik Lake, Chignik Lagoon

YK Delta: Circulating systems, shifting soils Chevak Goodnews Bay Kotlik Holy Cross Lower Kalskag Pitkas Point Quinhagak Russian Mission Sleetmute Toksook Bay Upper Kalskag

Bristol Bay: Buried systems more traditional Chignik Lagoon Chignik Lake New Stuyahok Newhalen South Naknek Tyonek

Maniilaq: Circulating systems, shifting soils, extreme cold Ambler Deering Kiana Kobuk Noorvik Selawik

Nome: circulating, vacuum sewers Golovin Saint Michael Savoonga

Lessons learned Complicated systems require engineering to sustainably operate Energy efficiency! Data is critical Proper maintenance is costly Emergencies destroy budgets.

A tale of 5 cities. Vacuum sewer system labor, 2012 AVERAGE $136,000 Chevak $166,000 Savoonga $142,000 St Michael $89,000 Selawik $212,000 Kotlik $ 94,000 Noorvik $114,000 AVERAGE $136,000

ARUC initiatives Energy Savings Decrease dependence on grants 1. O&M focus, small budget energy projects Chevak, Saint Michael, South Naknek, etc 2. Recovered heat - all ARUC communities possible - Savoonga, Quinhagak, Noorvik apps pending Alternative energy Goodnews Bay windmills Chevak wind boilers Solar: Ambler now, all Maniilaq to follow Kobuk Biomass: wood supply = JOBS Decrease dependence on grants Remote monitoring

ARUC Summary ARUC’s job is sustainability of member rural water systems & DEHE.

Tribal Utility Services (TUS) Community Assistance Review of Project Summary/Scope Documents Plan Review New system start-up Operator training new systems Transition to ownership O&M Manuals and operational aids

TUS Local response to emergencies Construction Skills Training Apprenticeship Program Skills Training Internship Program Certifications Database Tracking Significant Non Compliance (SNC) assistance

TUS Operator Training on-site for new operators Water Plant Operator class instructors System Management Training  Technical Assistance  

What does ARUC and TUS Really Do? Excerpts from ARUC Energy Retrofitting reports:   Deering Waste heat System was installed years ago, but was not properly controlled resulting in back fed heat to the power plant radiators. There was probably a net gain in value, but the system was poorly understood and was shut down. We have installed a new pump and controls, and thus far the boilers only fire when dryers are active. We currently have meters in route that will allow us to begin to quantify the fuel use and interface with remote monitoring. Additionally we have provided much of the neglected operational maintenance and should start to see the resultant savings. More to come. Kotlik Waste heat retro-commission This was a hot project… as the system was installed without appropriate controls. This project demonstrated our ability to roll all aspects of a complex small-scale project into a small team. Design, take-offs, electrical, plumbing, commissioning, etc. This is a great way to show the potential value-added of ARUC operations. Ironically this is also a great example of the disconnect from the operators and the bills. Although the boilers have virtually stopped firing, the operators are much more engaged with the other work, (stuff that makes their lives easier) pump controls, new vacuum valves, new impellers, etc… (these too have value, as operators either log less hours, or get more optimization while on shift).

continued Kobuk Maintenance Eric went out and began evaluating the system, and trying to attack some of the most critical failure potentials. While there he worked with the operator to conduct some very basic system maintenance. The highlight is that by cleaning the boiler, and adjusting a circuit setter we estimate the fuel savings to be 200 to 250 gal/mo. There is much more to be done there, and we are currently working to install more permanent fixes, and get the needed parts on-site. This is a prime example of why we need to develop the capacity to ensure this type of work isn’t neglected.   St. Michael, Boiler/HX rehab, retro-commission of HX add system This report is ironic, mostly because they froze-up shortly after our work out there. I have no doubts that the project was saving fuel, but the freeze negated that savings. One point to make is that while there we identified a potential problem with the automated controls at the lake house… I have the fix, but being tied to project funding hasn’t allowed this to be implemented. This likely had an impact on the freeze up. We would need to discuss all this. Louis is currently implementing phase I of the Vacuum boiler project. I anticipate phase II in about a month.