Impacts achieved but not expected Impacts expected and achieved

Slides:



Advertisements
Similar presentations
Accra, Ghana October 19-23, Extending Health Insurance: How to Make It Work DESIGN ELEMENT 8: MONITORING AND EVALUATION OF HEALTH INSURANCE SCHEMES.
Advertisements

Poverty Monitoring - Good Practice in Selecting Indicators Presentation by Dirk U. Hahn, Consultant at the Workshop on Prioritization, Operationalization.
Results Based Monitoring (RBM)
Public Health Essential Service #2
The Underlying Theories of Precede-Proceed Model
Logic Models and Evaluation Glen W. White 1 Jamie Simpson 2 1 University of Kansas, Research and Training Center on Independent Living 2 Kansas Department.
2010 Adopted Budget Labor Leadership Briefing February 3, 2010.
RBM in the context of Operations and Programme and Project Management Material of the Technical Assistance Unit (TAU)
WHY BOTHER TO UNIT TEST Suprinder Pujji. OVERVIEW What is Unit testing Emphasis of Unit testing Benefits of Unit Testing Popular Misconceptions Prevailing.
EXPECTED OUTCOMES The study will provide information on the impact of tobacco use on health from epidemiological, social and economic perspectives in relation.
Monitoring and Evaluation: A Review of Terms. Goals To provide better treatment for people with tuberculosis in Country X To achieve a treatment success.
Session 4.1. Defining the scope (entry points, foreseen outcomes) of a EU Support program to DR-LD Introduction Jorge Rodriguez Bilbao “Civil Society &
Guideline 3 Model Recordkeeping Policy Brisbane August 2012.
Value Engineering Value Engineering is the conscious, systematic application of a set of techniques that identify the needed functions, establish values.
The CIHR Perspective on Impact Measurement
Managing for Development Results (MfDR). Managing for Development Results (MfDR) is a development planning and management approach or strategy which emphasizes.
Session 0. Introduction: Why and key concepts Benedetta Magri, Bangkok, 2-5 September 2013.
OpenStand Principles for the modern paradigm for standards development.
Supporting Integrated and Comprehensive Approaches to Climate Change Adaptation in Africa AAP Country Conference “Celebrating our Successes” 12 th - 16.
KEYWORDS REFRESHMENT. Activities: in the context of the Logframe Matrix, these are the actions (tasks) that have to be taken to produce results Analysis.
PRECEDE/PROCEED.
Starting the Planning Process & Assessing Needs HSC 489.
UNPACKING RESULTS BASED MANAGEMENT (RBM) Module 1: Overview: A Whole Systems Approach Mosaic Workshop - Ottawa July 14-18, 2008.
Developing a Framework for Offset Use in RGGI Opportunities and Risks Dale Bryk, NRDC and Brian Jones, MJB&A – Northeast Regional GHG Coalition RGGI Stakeholder.
21/4/2008 Evaluation of control measures 1. 21/4/2008 Evaluation of control measures 2 Family and Community Medicine Department.
Capacity Building in Analytical Tools for Estimating and Comparing Costs and Benefits of Adaptation Projects in Africa.
Chapter 3 Information Systems, Organizations, and Business Processes.
Indicators in Malaria Program Phases By Bayo S Fatunmbi [Technical Officer, Monitoring & Evaluation] ERAR-GMS, WHO Cambodia & Dr. Michael Lynch Epidemiologist.
DMAIC: Control Robert Setaputra. Objective Maintain the changes made in the X’s in order to sustain the improvements in the Y’s.
Module 1 : Part 1 INTRODUCTION & HISTORY OF COMPUTERS INTRODUCTION & HISTORY OF COMPUTERS.
POAD8014: PUBLIC POLICY Assessment 5: Analytical Essay What to do, and how to do it Guidelines 1.
SYSTEM ANALYSIS AND DESIGN LAB NARZU TARANNUM(NAT)
Better Commissioning Better Services Better Outcomes - The Leeds Approach.
Chapter 1 Section 3 Trade Offs and Opportunity Costs.
FIN 324 Final Exam To purchase this material click below link Final-Exam-Guide For more classes visit
10YFP Sustainable Buildings and Construction Programme (SBC)
Annex III to BS/SC/PDF/A(2003)1
Change Communications Plan Template
Good Governance in the Public Sector An international framework
Impact Reporting Framework Use with Impact Report Template
بسم الله الرحمن الرحيم.
Health Strategies Group
Change Communications Plan Template
مديريت كارورزي پزشكي اجتماعي.
Terms of Reference – Go/No Go and Service Acceptance Approval Gateway
شاخصهای عملکردی بیمارستان
برنامه ریزی عملیاتی 1388 دکتر محسن ميرزايي.
Project Name: Country:
The ERA.Net instrument Aims and benefits
THE PRECEDE-PROCEED PLANNING MODEL
THE PRECEDE-PROCEED PLANNING MODEL
Prior authorization and patient cost-sharing are least likely to be seen as effective in reducing unnecessary care. “How effective do you think each of.
مدل زنجیره ای در برنامه های سلامت
فرق بین خوب وعالی فقط اندکی تلاش بیشتر است
Capacities for Successful Implementation
Effect combined IMPACT on achieving outcomes Organizational OUTPUTS
WG ESA meeting 9th of March 2015
Stimulating Economic Growth
Preventable drug side effects
Nox Chitepo, Stanley Ntakumba, Gemma Paine
How could quality standards benefit target populations?
The evaluation process
TELEMEDICINE PROJECT IN MONTENEGRO
Unit 2. Day 16..
Unit 2. Day 17..
What is your impact pathway?
IDENTIFY PROBLEM EVALUATE PLAN ACTION ACT.
Integrating Gender into Rural Development M&E in Projects and Programs
Community Benefit Activities
Outcomes from social prescribing
Presentation transcript:

Impacts achieved but not expected Impacts expected and achieved Impacts expected but not achieved Capacity building Informed decision making Increase of epidemiological studies Simplify the procedure in sleep studies Contribute to the use of an instrument for the diagnosis of sleep apnea Developing a pneumology day hospital Health benefits Broad economic benefits Testing expenses Expense reduction Input Primary output Secundary output Adoption Implementation Final outcome Level of impact Figure 2b. P3 Model phase