TRANS-SIBERIAN GOLD PLC Annual General Meeting

Slides:



Advertisements
Similar presentations
TRANS-SIBERIAN GOLD PLC 26 June 2013 Annual General Meeting TRANS-SIBERIAN GOLD.
Advertisements

Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fourth Edition Wild, Shaw, and Chiappetta Fourth Edition McGraw-Hill/Irwin Copyright © 2011.
版权所有: CMC 1 Sonda-Jherrukh Coal Mine& Power Plant Project.
TRANS-SIBERIAN GOLD PLC 30 June 2014 Annual General Meeting TRANS-SIBERIAN GOLD.
World’s largest undeveloped tin deposit in Kazakhstan.
HYCROFT RESOURCES & DEVELOPMENT INC. Allied Nevada Gold Corp.
DEPARTMENT OF MINES AND ENERGY Image positional only placement optional Washout feature in PPP 70/30 Daly River Management Advisory Committee - Katherine.
A Growth Company Producing Rare Precious Metals Palladium & Platinum June 7, 2000.
district development Tanzania – Lake Victoria Greenstone Belt.
OPERATIONAL BUDGETING
Understanding and Valuating Exploration Companies 24 May 2007 Shane Hunter.
Geological Issues at the OK Tedi Mine Keith McGregor Sophie Price.
Key Concepts and Skills
Understanding & Managing Finance
Key Concepts and Skills
TRANS-SIBERIAN GOLD PLC 29 June 2015 Annual General Meeting TRANS-SIBERIAN GOLD.
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Short-Term Finance and Planning Chapter Nineteen.
By: Jose, Marlon and Trevone. Mining is important for many reasons: - Canada is third in the world for mineral production. - Canada doesn’t have a use.
Agnico-Eagle Mines Limited1. 2 Growth Strategy Building Value Through Production and Reserve Growth Produce more gold targeting over 1.2 million ounces.
Chapter 10-1 PLANT ASSETS, NATURAL RESOURCES, AND INTANGIBLE ASSETS Accounting Principles, Eighth Edition CHAPTER 10.
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Short-Term Finance and Planning Chapter Eighteen Prepared by Anne Inglis, Ryerson University.
 El Capitan Precious Metals, Inc. Meeting of Shareholders November 20, 2012Scottsdale, AZ.
The Importance of Feasibility Studies for Project Financing FINEX 2012.
1 Presented By: Neil McMillan President & CEO Q1 Financials May 14, 2012.
Natural Resource Partners L.P. Platts Coal Properties Conference February 2007.
University of Saskatchewan Geological Engineering GEOE Introduction to Mineral Engineering.
Prepared by: C. Douglas Cloud Professor Emeritus of Accounting Pepperdine University © 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned,
INSPIRATION MINING CORP. JASPER PROPERTY. Jasper Property Jasper Property is located on Vancouver Island in British Columbia approx 120 km from Myra Falls.
Connolly - International Financial Accounting and Reporting - 2nd Edition CHAPTER 7 BORROWING COSTS.
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Short-Term Finance and Planning Chapter Eighteen Prepared by Anne Inglis, Ryerson University.
Natural Resource Partners L.P. 17 th Annual Wachovia Equity Conference Nantucket June 26, 2007.
St Barbara Mines Limited Tokyo Presentation Eduard Eshuys Managing Director & CEO 26 September 2004.
1 Presentation to the Parliamentary Portfolio Committee on Water and Environmental Affairs Eastern Basin 28 June 2011.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Short-Term Finance and Planning Chapter 26.
FINANCIAL ACCOUNTING Prepared by L. de Grace C.A. a user perspective Sixth Canadian Edition John Wiley & Sons Canada, Ltd. ©2011 Chapter 5 The Statement.
Mineral Exploration and Development
January 28, A new power station, privately owned, is established in the Gaza Strip The Israel Electric Company receives a concession.
INSPIRATION MINING CORP. JASPER PROPERTY. Jasper Property Jasper Property is located on Vancouver Island in British Columbia approx 120 km from Myra Falls.
CHAPTER 18 SHORT-TERM FINANCE AND PLANNING Copyright © 2016 by McGraw-Hill Global Education LLC. All rights reserved.
TRANS-SIBERIAN GOLD PLC 30 June 2016 Annual General Meeting TRANS-SIBERIAN GOLD.
NRCan Community Roundtable Presentation Meliadine Gold Project Rob Johnstone Deputy Director Sustainable Mining and Materials Policy Division Minerals,
 Long term fundamentals for gold remain strong – recent pull back in price presents a buying opportunity for serious investors  Gold represents a store.
Chapter 6 Cash Budgets.
Property, Plant and Equipment (including natural resources)
St. Lawrence Fluorspar Project St
GREENHILLS PORTUGAL LDA
QKR Namibia Navachab Gold Mine
Successful Efforts Method (SEM) and Full Cost Method (FCM) of Accounting for Oil and Gas Producing Activities.
PFIN 2 5 USING FINANCIAL STATEMENTS AND BUDGETS
Developing a Canadian Gold Deposit
Advanced Financial Accounting
Merchandising Activities
Water System Acquisition
Financial Forecasting
Statement of Cash Flows
© The Young Entrepreneurs Academy, Inc. All Rights Reserved
Drought in Upper Colorado Basin
……. Date. Disclaimer… Randgold reports its mineral resources and mineral reserves in accordance with the JORC 2012 code. As such numbers.
Principal Projects - Mexico
MINING.
Statement of Cash Flows
Analyzing the Firm’s Cash Flow
MUHAMMAD WAJAHAT AMIN (INTERNEE, MINE PLANNING) OPEN PIT MINING TOPICS.
11 Depreciation, Impairment, and Depletion LEARNING OBJECTIVES
The Transformation of A Small Company Into A Golden Legend
The Collapse of Gaza's Electricity System – Well-Planned and
Production Month Sun Hours K Monthly Kwh Tou Peak Value After Kwh
Manaila Polymetallic Mine
Bidjovagge Mine Project
2015 January February March April May June July August September
Presentation transcript:

TRANS-SIBERIAN GOLD PLC Annual General Meeting 29 June 2017 Annual General Meeting TRANS-SIBERIAN GOLD

TSG Company history Established in 2000 Listed on LSE (AIM) in November 2003 UFG acquired 25% in 2006, now 79.69% Veduga and Bogunay sold for $40 million in 2007 Asacha in production since September 2011 Asacha licence extended in 2013 to 1 September 2018, application for further extension in preparation

ASACHA – Underground Mine 2013 2014 2015 2016 Q1 2017 Mine development (metres) 2,672 3,576 3,937 4,926 1,263 Ore extracted (tonnes) 185,573 198,387 177,555 179,258 46,155 TRANS-SIBERIAN GOLD

ASACHA Processing plant 2013 2014 2015 2016 Q1 2017 Ore processed (tonnes) 155,215 156,561 161,242 162,892 44,320 Gold grade (g/t) 6.29 7.68 7.65 7.23 5.35 Silver grade (g/t) 10.45 13.46 12.28 12.71 8.99 Gold recovery (%) 94.43 95.06 95.40 95.18 94.24 Silver recovery (%) 75.44 67.17 76.94 81.69 76.69 Gold in dore (oz) 29,666 36,513 37,798 36,225 7,246 Silver in dore (oz) 39,136 45,086 49,232 54,595 10,148

ASACHA Refining and sales 2013 2014 2015 2016 Q1 2017 Gold refined (oz) 29,670 36,089 37,984 35,366 7,644 Silver refined (oz) 39,026 44,610 49,398 51,428 12,356 Gold sales $mill 43.3 45.4 44.4 9.4 Silver sales $mill 0.9 0.8 0.7 0.2 TRANS-SIBERIAN GOLD

JORC Resource Estimate Resource estimate updated in 2017 by ARANZ Geo Expert Services/QG Australia Pty Ltd (QG) shows the Asacha property contains 693,000 oz. of gold and 1.76 million oz. of silver. The estimate incorporates new data from mining development, 2016 exploration programme and accounts for mining depletion during 2016. TRANS-SIBERIAN GOLD

JORC Resource as at 31 December 2016 ASACHA PROPERTY MEASURED + INDICATED INFERRED MEASURED, INDICATED & CUT-OFF g/t Tonnes (000) 681 370 1,051 Gold Oz (000) 424 269 693 4.0 GRADE 19 23 Silver Oz (000) 1,200 560 1,760 55 47

Russian State Geological Commission for Reserves (GKZ) Resource Estimate In February 2017 a special meeting of GKZ reapproved the Asacha resources. The reapproval is required also for prolongation of the license. The figures (next slide) exclude ore mined up to 31 December 2016, and include the results of exploration 2012.

Mineral Resources - Russian State Commission for Reserves (GKZ) as at 31 December 2016   Au Ag Cut-off g/t C1 & C2 oz Grade g/t Asacha 623,943 19.8 1,476,612 46.8 2

Asacha mine Average monthly output of about 15,000 tonnes of ore in 2016 ensures continuous operation of the plant Processing plant throughput averaged more than 13,500 tonnes per month in 2016 Dilution, which reduces the grade of ore delivered to the plant (excluding rockfalls) reduced in 2016 to 34% (40.4% in 2015 and 56.8% in 2014)

Asacha mine in operation

Main activities at underground mine In 2014 mine development started below 200 metre level In 2015 mining activities started below 200 metre level In 2017 mining activities started below 150 metre level Stoping methods chosen thoroughly for areas of fractured rock Gold grades for Q1 2017 - 5.35 g/t (Q1 2016 - 7.38 g/t )

Decrease of gold grades in ore The main reason for the decrease is the delay in mine development which has led to a shortage of rich stoping ore delivered to the plant (in 1Q 2017 – 40.8% of total ore; in 2016 - 41.2%; in 2015 – 54.5%) . The shortage has been compensated by the use of lower grade ore cut earlier and the poor ore from stockpiles). It occurred because of: lack of mobile underground equipment in operation; extreme water inflow at low levels accompanied by seasonal floods.

Low grade ore - Solutions Purchase of equipment In 2017 four new underground trucks arrived at the site in April and two LHDs are expected in September Control of dilution Stability in dilution which is normal for the mining systems applied (in 2016- 34%, in January-May 2017 - 36.0% ) Control of water inflows Additional pumps purchased and interim pump station designed and constructed Hydro-geologic studies conducted Continuous monitoring of water underground Underground exploration drilling In 2016-2017 about 3,500 metres were drilled, providing more details on ore bodies configuration and grades. We expect a continuous increase in the proportion of rich ore delivered to the plant starting in the second half of 2017. Annual gold production is expected up to 36,000 oz . -

Geologic exploration in 2016 – Advanced exploration mining (underground drilling) - 37 holes, about 3,400 metres Surface exploration drilling totalled 18 holes and about 5,500 metres. Following the results of the drilling geologic exploration comprehensive programme for 2017 has been worked out

Construction activities Mine development in order to reach 100 metre level Additional pumping station at 150 metre level Second compartment of the tailings storage facility Solid wastes landfill

New loan facilities with VTB Bank $15 million and $5 million debt facilities 5-year and 3-year terms respectively 6.2% interest rate  Reduces cost of debt and maintains flexibility for growth and development

Special Dividend Paid On 23 December 2016 a special dividend was paid, 5 US cents (3.97 pence) per ordinary share Special dividend in total US$ 5.5 million