ENERGY: STATE - OF - PLAY IN GHANA

Slides:



Advertisements
Similar presentations
ABA CLEAN ENERGY CARBON PROJECT Bruce Johnston
Advertisements

1 Broken Hill Solar Plant Community Consultative Committee July 2014 Date: 14 July 2014.
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
Assumption University Thailand EE4503 Electrical Systems Design Introduction 1.
A Full Service Multi-Disciplinary Engineering, Procurement, and Construction Management firm (An ISO 9001 :2000 Reg. Company) North American base, engaged.
1 Training Session on Energy Equipment Electricity Presentation from the “Energy Efficiency Guide for Industry in Asia” ©
Plant Utility System (TKK-2210)
© ABB SG_Presentation_rev9b.ppt | 1 © ABB SG_Presentation_rev9b.ppt | 1 Smart Grid – The evolution of the future grid Karl Elfstadius,
Africa Geospatial Forum Geospatial Empowering Utilities.
Lunch & Learn Project Presents to you: “The Electric Power Grid” By: Dexter Hypolite Electrical Engineer VIWAPA.
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
INITIATIVES IMPLEMENTED ON NATIONAL AND INTERNATIONAL LEVELS FOR ENERGY EFFICIENCY AND ENERGY- SAVING IMPROVEMENT VI Eurasian Energy Forum 4-6 October.
Section 3 TRANSMISSION & DISTRIBUTION US Bulk Power Transmission System Transmission & Distribution (T&D) Components New T& D Technologies This product.
POWER SECTOR POLICY OVERVIEW ASSOCIATION FOR POWER UTILITIES OF AFRICA (APUA) SCIENTIFIC COMMITTEE CONFERENCE Presentation by Mr. M. Mulasikwanda Department.
Book Reference : Pages To understand how electricity is distributed in the UK via the National Grid 2.To understand how transformers are used.
Electricity and the Grid SPH4C. Power Recall that the power delivered to a circuit or consumed by a load is:
NE 127 – Codes, Standards, and Regulations NDT & QA/QC Standards: ISO, ANSI, ATA, AIA, IEEE, etc. INSTRUCTOR: Chattanooga State CC.
1 ALLOCATIONS for the Integrated National Electrification Programme 2009/10 Presentation to the Select Committee on Finance 25 February 2009.
INTERNATIONAL ENERGY AGENCY AGENCE INTERNATIONALE DE L’ENERGIE Reducing Standby Power to 1 Watt (and less) Alan Meier International Energy Agency
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
1 WHOLESALE ELECTRICITY MARKET AN OVERVIEW By:Ag. Manager, Market Operations.
Electrical Power Grid. Parts of the Grid: Generation (Power Plants) Transmission Lines Substations Distribution Lines Transformers Customers.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All SMART GRID ICT: SECURITY, INTEROPERABILITY & NEXT STEPS John O’Neill, Senior Project Manager CSA.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
Session 11 Grid Tied PV Systems – Part 1 Standards and Codes October 01, 2015.
Distribution Systems-General
GCSE Science A Physics 1 Transmission of Electricity Learning Outcomes Understand the need for an electrical distribution system Describe the national.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
Energy is one of the most important files being dealt with in Jordan that are dealt with at the present time, for the big burden it puts on the national.
SLIDE 1 SRAS REVIEW TASMANIA REGION July 2013 PRESENTED BY PETER BIDDLE.
Electrical Installation II1 Regulations, Standards & Code of Practice (Chapter 1)
Electricity.  Aims – To understand the process of providing Electricity to buildings.  Objectives  To understand how Electricity is Generated.  To.
Assoc. Prof. Dr. Tarkan Erdik
sHPP VRŠUMA Draga, KO Draga, Tutin, SRBIJA -Business Plan-
Introduction to Electric Power System and A. C. Supply
POWERSYSTEMS 1977: Powersystems UK started up to provide services that only the local electricity board could provide at the time. We became the first.
Standards Outreach and the U.S. Government
THE STANDARDS SYSTEMS IN GHANA AND LINKS WITH INTERNATIONAL STANDARDS BODIES Joyce Okoree.
Introduction to the course
SUB-STATIONS.
“Caucasus Power Transmission Network’’ (Armenia-Georgia overhead transmission line/substations) Loan Project.
CLIC Civil Engineering & Infrastructure Working Group Meeting
Presentation of the case in Japan for Technical Committee K - Integrated Operation of Hydropower Stations and Reservoirs- Centers for Civil Engineering.
History of hydro power plant
Domestic cogeneration
Photovoltaic Systems Engineering Session 19
FERO INVEST
Basics of electrical engineering
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Fuel Cell Market size worth $25.5bn by 2024Low Power Wide Area Network.
Power Recall that the power delivered to a circuit or consumed by a load is:
Sahar Rahim MS-Electrical Engineering Supervisor: Dr. Nadeem Javaid
THE REPUBLIC OF MALAWI MALAWI PRESENTATION AT
Design of Electric Power Systems and Utilities
Manager, Environment and Sustainable Development Department, VRA-Ghana
Development of a Solar Water Heater NAMA Concept Belize
نظام إدارة الجودة - المتطلبات
MIGRATING TOWARDS A SMART DISTRIBUTION GRID
Transmission Engineering
DEMOCRATIC REPUBLIQUE OF CONGO
ENCLAVE POWER COMPANY LIMITED
An energy technology powerhouse
Photovoltaic Systems Engineering Session 12
POWER, AUTOMATION AND INDUSTRIALIZATION: THE NIGERIAN EXPERIENCE BY STANLEY OKIY B.Tech (RSUST), M.Eng (UNIBEN), MPA (UNIBEN), & Engr. DR. C.C.
U.S. Standards and Conformity Assessment System
Electric Power Generation
March, 30 – April 3, 2009, Honolulu, Hawaii
Background The electrification programme was started by Eskom during the late 1980’s It was further refined by the National Electrification Forum.
Exploring Wind energy.
FUTURE OF POWER GENERATION IN GHANA At the 2019 GhIE Annual Conference
ELECTROTECHNICAL – REGULATIONS IN SOUTH AFRICA Presented by Thabo Mabena 8/24/2019.
Presentation transcript:

ENERGY: STATE - OF - PLAY IN GHANA THE GHANAIAN ELECTRICAL ENERGY INFRASTRUCTURE AND INTERNATIONALLY RELEVANT STANDARDS.

HISTORY Historically the Ghanaian Electrical Energy Infrastructure was put in place by the British government before attainment of Political Independence by Ghana. The electrical distribution system was developed for the various major cities and towns starting with Cape Coast and Accra. The system was developed according to the existing British Standards at the time. The generation was based on fossil fuel driven diesel generators.

It is interesting to note that the primary distribution Voltages were 33kV and 11kV and the utilisation voltages at residential, commercial and industrial installations was 415V AC 3- phase /240V AC - 1 phase.

VOLTA RIVER HYRO ELECTRIC PROJECT The existence of Hydro, electric energy resources has been in existence during this period. The need to develop renewable hydro - electric power was identified in relation to the development of the Aluminium industry as Ghana has bauxite resources in kibi, Nyinahin etc. Therefore the Volta River Hydro electric project was developed in consonant with the building of an Aluminium Smelter by Kaiser Engineers (Valco).

The total Ghana load at the time of development of the Volta River project (900MW) was just 95 MW. Therefore the only justification for the VRA Akosombo project was the building of 300 - 375 MW Valco Aluminium Smelter project. The source of funding of the project required the employment of the American Consultants, namely, Kaiser Engineers. It is therefore interesting to note that ANSI, IEEE,ASTM, ASCE etc standards were applied mainly for the building and commissioning of the plant and the development of a national grid to connect the various towns and cities in southern Ghana covering among others the gold mining towns.

Subsequently the national grid Voltage was selected as 161kV and the bulk supply station voltages were fixed at 34.5 kV and 11.5kV all American standard voltages, with the primary distribution voltages of 34.5kV and 11.5kV connecting the various existing distribution networks at 33kV and 11kV. It is interesting to note that a primary distribution voltage of 6.6kV was provided for the major gold mining distribution system in Obuasi.

Initially, British technical staff trained the local staff in the operation and maintenance of the distribution supply system installed before the inception of the Volta River project. Technical support for the operation and maintenance of the Volta River project was provided by Ontario hydro under a CIDA grant to Ghana.

In the late 60s , Ghanaian technical staff took over the complete operation and maintenance of the Akosombo generating station and the associated grid.

STANDARDS IN THE ELECTRICITY INDUSTRY International guidelines FIDIC for the supply and installation of electro mechanical equipment for the Akosombo project and the construction of the civil aspects of the project ,

STANDARDS IN THE ELECTRICITY INDUSTRY were employed at all times to guide the procurement, installation and commissioning of subsequent expansion of the Ghana electricity supply, transmission and distribution systems.

STANDARDS IN THE ELECTRICITY INDUSTRY International guidelines FIDIC for the supply and installation of electro mechanical equipment for the Akosombo project and the construction of the civil aspects of the project ,were employed at all times to guide the procurement, installation and commissioning of subsequent expansion of the Ghana electricity supply, transmission and distribution systems.

It is worthy to note that the need for standardization in Ghana led to the establishment of the Ghana standards authority in the early 70s. The GSA is a member of the ISO and the ITU . It works with the IEC through the Ghana National Electro technical Committee (GNEC) established in 2008. Ghana became an Affiliate member of the IEC in the early 2000 with the sole purpose of identifying relevant IEC standards for adoption and subsequent use in the electrical/ electronic industry in

Ghana. Other standards like ANSI, ASTM, ASCE,IEEE ETC have been adopted by the GSA. The need for Ghana to adopt standards by ISO, IEC and ITU was recognised because of the WTO recommendations to members to adopt international standards where national standards do not exist to avoid the erection of technical barriers to international trade.

In the area of efficiency of some electrical/electronic equipment, the Energy Commission (national regulator) has developed Efficiency labelling for window air conditioners ,CFL, Refrigerators and Deep freezers with the

aim of reducing the generation of CO2 a cause of global warming aim of reducing the generation of CO2 a cause of global warming. In the development of efficiency labelling IEC standards were employed, especially those covering the design and testing of the specific equipment.

CONCLUSION To conclude, Ghana through the GSA and GNEC have adopted relevant IEC standards for power transformers , substation automation etc for the generation, transmission and distribution of electrical energy and also various ISO and IEC standards for domestic and commercial appliances.

CONCLUSION The energy commission using IEC standards has also developed wiring regulations for residential and commercial installations and technical regulations for the distribution companies in Ghana. The utilization voltage in Ghana is in accordance with the IEC voltage standards of 400/ 230V AC has also been fixed by the Energy Commission.