Standard Setting Training Course 2016

Slides:



Advertisements
Similar presentations
Preparation of the Self-Study and Documentation
Advertisements

Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
Starting Planning for the 2010 Policy Key Issues Notes for the TAC Executive Committee April 8, 2009 Phil Hattis, AIAA VP for Public Policy.
MODULE TWO Practical Tips for Participation in CPM and IPPC Activities.
MODULE THREE The IPPC Standard Setting Process. What this Module Covers The 4 stages of the IPPC Standard Setting Process:
Flow-chart explaining information exchange and document dissemination under the IPPC IPP Training WS – Handout no. 4a.
THE DESIGN OF ORGANIZING A CONSULTATIVE MEETING ON KOREA – MEKONG COOPERATION.
Draft ISPM: Minimizing pest movement by sea containers ( ) IPPC Member Consultation 1 July to 1 December 2013.
REVIEW OF COSAVE ACTIVITIES 21th TC, Entebbe, Uganda Ing. Agr. Soledad Castro Dorochessi ArgentinaBrasilChileParaguayUruguay COMITE DE SANIDAD VEGETAL.
Organizing successful Meetings by Chapters Dr. Jacob Baal-Schem
Standard Toolkit for Learning Centers Hosting Guide – Managing Logistics of Visits MABS Learning Centers Training-Workshop.
The IPPC and Guidance on International Standards to Protect Forests Gillian Allard FAO Forestry Department in cooperation with the IPPC Secretariat.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES FIRST THINGS FIRST Invitation of a mission Information meeting self-assessment.
FAO/WHO Codex Training Package Module 3.2 FAO/WHO CODEX TRAINING PACKAGE SECTION THREE – BASICS OF NATIONAL CODEX ACTIVITIES 3.2 How to develop national.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AND COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
BU610 Applied Business Research 2015 Section A (Waterloo Part-time MBA) Faculty Advisors: Shelly Jha Detlev Nitsch Jack Schnabel.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AMD COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
FAO/WHO Codex Training Package Module 3.3 FAO/WHO CODEX TRAINING PACKAGE SECTION THREE – BASICS OF NATIONAL CODEX ACTIVITIES 3.3 Considerations for selecting.
The International Plant Protection Convention (IPPC) Technical Panel on Diagnostic Protocols July 2010 Washington DC, USA International Plant Protection.
The International Plant Protection Convention (IPPC)
Stage 3. Consultation and Review Standard Setting Training Course 2016.
Preparation of the Self-Study and Documentation
The 12th Senior Officials’ Meeting (SOM-12) 1-2 November 2016
Pre-planning Planning to plan (and adapt) Implementation starts Here!
Welcome to Scottish Improvement Skills
ORIENTATION SESSION FOR COMMITTEE MEMBERS
Pre-Investigational New Drug (pre-IND) Meeting with FDA
General introduction and welcome to the IPPC Standard Setting Course
Welcome!, but before we begin…
APTUK Annual Professional Conference and Exhibition 2017
The International Plant Protection Convention
Handout 2: Planning and organising meetings
May 21-25th, 2012 Cairns, Australia
Understanding the International Plant Protection Convention (IPPC)
IPPC Standard Setting Process
IPPC first consultation 1 July to 30 September 2018
Stage 4. Adoption and Publication
The International Plant Protection Convention
IPPC first consultation 1 July to 30 September 2018
Online System for Compiling Member Comments
Rick McGee, PhD and Bill Lowe, MD Faculty Affairs and NUCATS
Stage 1. Developing the List of topics for IPPC standards
IPPC Member Consultation 1 July to 1 December 2013
Training of trainers, part 1
Standard Setting Process – Information Flow
Standard Setting Process – Information Flow
IPP Training WS – Handout no. 4a
The International Plant Protection Convention
I want to submit a grant. What do I do?
Recruitment & Selection Process For Talent Acquisition
IPPC Standard Setting Process
IEEE 802 2nd Vice Chair last name at ieee dot org
IPP Training, IICA & IPPC/FAO, Trinidad & Tobago
Training of trainers, part 1
To achieve improvement through: Self assessment Benchmarking
ePhyto DRAFT APPENDIX 1 TO ISPM 12:2011
REFIT Platform 20/02/2019 Diversity Europe Group.
Policies, Procedures, and Best Practices IEEE AESS PANELS 2019 Prepared by the Technical Operations Committee Contents: Applying for Panel Approval Forming.
WATER, WATER EVERYWHERE?
REVIEW OF COSAVE ACTIVITIES
CERN Brief Update – April 2019
Jaeliza Morales CUR/516 Dr. Mary Poe
IPP Training, IAPSC & IPPC/FAO/FAORAF
IPP Training, EPPO & IPPC/FAO, York, U.K.
IPPC Member Consultation 1 July to 1 December 2013
IPP Training, IAPSC & IPPC/FAO/FAORAF
IPPC Consultation Period 1 July to 30 September 2016
Draft revision of ISPM 6: National surveillance systems ( )
The International Plant Protection Convention
IPP Training, IICA & IPPC/FAO, Trinidad & Tobago
Presentation transcript:

Standard Setting Training Course 2016 Stage 2. Drafting Standard Setting Training Course 2016

Stage 2

Stage 2

Drafting the Specification A draft specification is submitted with the call for topics submission The SC: Assigns a Lead Steward and Assistant Steward(s) Review the draft specification Approves the specification for 60-day consultation Stage 2

Consultation on draft specifications Whenever IPPC Secretariat deems a good time (typically June and December) Lasts 60 days OCS is used to collect and compile comments Comments solicited from CPs, RPPOs, relevant international organizations and other entities, as decided by the SC NPPOs of non-CPs are not included in the consultation on draft specifications, but they ARE included in consultations on draft ISPMs Stage 2

Why is consultation so important? Member’s opportunity to influence the direction of an ISPM Scope and content of the draft ISPM - should reflect what members want to see in the final standard Opportunity to consult national stakeholders likely to be impacted by the standard All levels of involvement, from the producer to the policy level Collection of experts’ opinions - regulators, industry, other agencies, scientists Hands on experience - real life issues to take into consideration Stage 2

Exercises Where would you go to find out which specifications are under consultation? Where would you go to comment on specifications? Lets consider a specification under consultation that involves industry and regulators, for example seeds. Who would you consult in your country? Stage 2

Standard Setting Training Course 2016 Nominating Experts Standard Setting Training Course 2016 Stage 2

Stage 2

Stage 2

What experts are needed? Members of expert working groups (EWG) Members of technical panels (TP) Authors for diagnostic protocols (DPs) Stage 2

What is required? The expert’s skills and experience should match the specific expertise required: See approved specifications for the TP or EWG for the expertise needed See the call letter Strong working knowledge of English Availability to participate in virtual meetings Stage 2

Process to nominate EWG members Call for Experts IPPC Secretariat NPPOs or RPPOs Nominations from members Nominations SC Approves members SC Report Stage 2

Call for experts for EWGs and TPs: what, when and where? Made by Secretariat to collect nominations Any time of the year Announcement email sent to NPPOs, RPPOs and International Organizations Relevant information posted on IPP under IPPC News (Home Page) and Calls Page Stage 2

How to make nominations? Only received by NPPO and RPPO official IPPC contact points to the Secretariat In exceptional cases (refer to specification), invited experts are allowed. The international organization official contact point submits the nomination to the Secretariat All nominations should include: Nominee’s curriculum vitae (CV) Nominee’s contact details and summary of expertise Signed statement of commitment Stage 2

Exercise There is a rumor going on to the effect that there will be an EWG meeting in 2013 to work on the seed topic. A call for experts should be made. What do you do? Stage 2

Exercise Take the last call for experts made for the TPPT/TPG (July 2012). Note that your SC representative told you that no nomination was made for a French speaking candidate for the TPG. Could you prepare an expert nomination? Stage 2

Organizing an expert meeting Standard Setting Training Course 2016 Stage 2

Stage 2

EWG meetings EWG meetings are organized by the IPPC Secretariat often with assistance from a NPPO or a RPPO Meeting costs should be minimal (e.g. administrative, accommodation, travel) Stage 2

What is expected from the local host? Assigns contact point to liaise with the Secretariat Identifies a participant from host country Makes logistical arrangements (hotel, welcoming reception, field trip (if required), meeting room, etc.) Sometimes provides resources (transportation, welcoming reception, etc.) Secretariat provides final approval before arrangements can be made Stage 2

What is expected from the local host? (cont’d) The local host should also: Facilitate hotel bookings (e.g. pre-group booking) and visas Arrange airport transfer between hotel and venue Provide information on transportation, weather, address of the hotel(s) and meeting venue, map, medical information, banking information, etc. Stage 2

What physical resources are needed? A room large enough for the number of people attending Projector and projection screen Computer with internet access Extension cord(s) Printer (connected to one of the meeting computers if possible) Photocopier or an arrangement where to make copies Stage 2

What physical resources are needed? (cont’d) Flip chart and colored markers or whiteboard with erasable markers and eraser English dictionary, copies of ISPMs, CPM reports Laser pointers (2), general office supplies (stapler, paper, pens, pencils, etc.) Coffee/tea making facilities for work breaks if no catering Stage 2

During the EWG Select a Chair and Rapporteur Host country’s representative may fully participate in meeting A contact person from the host country should be available during the meeting to answer any questions, make last minute arrangements and to provide documents or photocopies if required Stage 2

Exercise Brainstorm information points that might be useful to include in an information package being developed to send to EWG participants before they arrive in your country for a meeting. Stage 2

DP consultation of experts Standard Setting Training Course 2016 Stage 2

Stage 2

Goals and nature of DP consultation of experts To improve the quality of early stage draft DPs By trying to attract worldwide experts of the pest Particularly those with a special expertise in relation to the pest, but who were not part of the editorial team Consultations at early stages may be: Informal by the discipline lead or authors (via email, during conferences, etc.) Through the expert consultation via the IPP Stage 2

DP consultation of experts May take place for: Very early drafts (not yet seen by the TPDP) Later drafts when additional expert input is necessary At later stages, NPPOs and RPPOs provide comments during consultation Stage 2

Exercise Which institutes, universities, societies, etc. would you contact in your country to identify diagnostic experts to be consulted in relation to a specific DP, on a specific pest (insect, fungus, bacteria, virus or plant) associated with a specific host range (e.g. citrus, wheat, forest trees, small fruit, pome fruit and stone fruit, vegetables)? Stage 2

Standards Committee (SC) reviews draft ISPMs Standard Setting Training Course 2016 Stage 2

Stage 2

Stage 2

SC reviews the draft ISPM SC reviews the draft ISPM at a meeting, or electronically for DPs or PTs SC decides whether to: approve it for first consultation return it to the Steward, EWG, or TP put in on hold Stage 2

SC reviews the draft ISPM at an SC meeting: responsibilities in detail Prior to SC meeting: Reads the drafts Considers the reports of EWG Prepares comments During SC meeting: Proposes any comments or changes to the draft If an SC member is a member of the EWG, explains the draft ISPM and main points of discussion Approves of the draft for first consultation, returns to the EWG/TP, or puts it on hold Stage 2

Review of draft ISPMs: Steward responsibilities During EWG/TP meeting: At the SC meeting (approval for MC): Prior to EWG meeting: Explains standard setting process Explains requirements of the specification Assists with running the meeting Assists Sect Provides guidance to Sect and SC for selection of experts Liaises with Sect (production of papers for the meeting) Assists during discussions on the draft ISPM Stage 2

Exercise The next SC meeting will be held on November 14-18, 2016. Where can you find the information related to the meeting (e.g. agenda, documents, ISPMs)? Stage 2

Exercise Find the list of current SC members Find the meeting report from the 2016 April SC meeting Stage 2

Questions? Stage 2