JPSP-CAS co-operation in Superconducting RF of BEPCII

Slides:



Advertisements
Similar presentations
Higgs Factory, HF2014 at IHEP, 2014 Oct. 101Eiji Kako (KEK, Japan) High Power Couplers for Higgs Factory Eiji KAKO (KEK, Japan)
Advertisements

BEPCII RF POWER SYSTEM RF group, IHEP Sep ~ April 1.The 1 st transmitter had finished installing,commissioning and SAT (Site Acceptance Test).
Progress and Plan for Superconducting RF Cavity RF Group.
KAGEYAMA, T. Open Meeting for Proto-Collaboration March 19, 2008.
10 36 ??? 20 Apr K. Oide Super B Workshop.
LEP3 RF System: gradient and power considerations Andy Butterworth BE/RF Thanks to R. Calaga, E. Ciapala.
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
Progress of SC RF Cavity during the RF Group May 10, 2007.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
E. KAKO (KEK) 2009' Sept. 30 Albuquerque Global Design Effort 1 Cavity Test Items in S1-G Cryomodule Eiji Kako (KEK, Japan)
ILC DR RF Cavity – D. Li DR Workshop, KEK, Japan 1 Design for the DR RF cavities and impedance issues Derun Li Center for Beam Physics Lawrence Berkeley.
KEKB Crab Development K. Hosoyama (KEK) Crab Cavity for HER Crab Cavity for LER Crab Cavity for KEKB History of Crab Cavity R&D Characteristics of Crab.
BEPCII Transverse Feedback System Yue Junhui IHEP , Beijing Sep 17 th, 08IMAC.
Status of crab crossing studies Presented by NAKANISHI Kota (KEK) 2008/1/25.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
First Mini-workshop on IHEP 1.3GHZ SRF LLRF and Tuner Sun YI (孙 毅) Accelerator Center, IHEP June 10, 2009.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
RF systems for NSLS-II J. Rose, A. Blednykh, P. Mortazavi and Nathan Towne BROOKHAVEN SCIENCE ASSOCIATES.
Marc Ross Nick Walker Akira Yamamoto ‘Overhead and Margin’ – an attempt to set standard terminology 10 Sept 2010 Overhead and Margin 1.
Low-Level RF of BEPCII Sun YI IMAC’07 May. 11, 2007 IHEP.
4th BEPCII IMAC Meeting April , 2006 Status of BEPCII Storage Rings Ma Li April 26, 2006.
5th BEPCII IMAC Meeting May , 2007 Progress of BEPCII Storage Ring Construction Ma Li May 10, 2007.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
CRAB for HL-LHC KEK activity 2010DEC Yoshiyuki MORITA.
Nov. 28, 2003RF System Overview, K. Akai1 RF System Overview Contents: ◆ High beam current and measures ◆ Construction ◆ Damping ring RF system ◆ Crab.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
BEAMLINE HOM ABSORBER O. Nezhevenko, S. Nagaitsev, N. Solyak, V. Yakovlev Fermi National Laboratory December 11, 2007 Wake Fest 07 - ILC wakefield workshop.
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
IHEP GHz 9-cell Cavity R&D Status and Plan The Third IHEP-KEK 1.3GHz SC Technology Collaboration Meeting Dec. 7-8, 2010, IHEP, Beijing GAO Jie,
Stefan Wilke, DESY MHF-e 1 12th ESLS RF Meeting 1 st October, 2008 at DIAMOND Overview and Status of Assembling and Commissioning the RF-System at PETRA.
CEPC SRF System Heat Load CEPC Top-level Parameters related to SRF System (1) ParameterUnitMain Ring Booster Injection Booster Extraction.
Experiences with KEK-B Crab Cavity KEKB and Crab Cavity History of Crab Cavity Construction and Operation of KEKB Crab Cavities What the KEKB Crab Cavity.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Developments of new treatment techniques for SRF cavities at KEK HORIZONTAL HPR FOR PERFORMANCE RECOVERY Yoshiyuki MORITA Motivation of developing HHPR.
Operation Status of the RF Systems and Taiwan Photon Source
Recent Result for the STF-2 Cryomodule Operation
The LEP Superconducting RF system has reached its maximum configuration of 288 four-cell cavities powered by 36 klystrons in In 2000, this system,
CW couplers; KEK injector couplers Eiji Kako (KEK, Japan)
Degradation and Recovery of Cavity Performance
CEPC APDR Study Zhenchao LIU
Cryogenic System Operation and the Progress of SSRF II
CEPC Cryogenic System Jianqin Zhang, Shaopeng Li
Replacement of coupler and recovery of cavity for BEPCII
Summary on SPPC Accelerators
BEPCII RF POWER SOURCE AND INPUT COUPLER
Superconductivity in the BEPCII Performance
High Q Cavity Operation in the Cornell Horizontal Test Cryomodule
Study on Beam Instability
TTC meeting, Feb. 6-9, 2018, Milan Trouble Shorting of CW Operation of Superconducting Linac for Chinese ADS Yuan He, Yongming Li, Xinmeng Liu, Zheng Gao,
CEPC RF Power Sources System
ADS Accelerator Program in China
Overview of SRF system of Ring and Linac (1)
ERL2015 WG4: RF & superconducting RF for ERL
DA study for CEPC Main Ring
Construction and First Coo-down Test of cERL Injector Cryomodule
CEPC APDR SRF considerations(3)
RF Techniques and Developments at SSRF
CEPC partial double ring scheme and crab-waist parameters
Design Study of the CEPC Booster
CEPC advanced partial double ring scheme
Mini-Workshop on BEPCII Background Study
CEPC Waveguide HOM 5-cell and 2-cell Cavity Study and EP Facility
BEPCII Background Issues: Collimators and Masks
CEPC APDR SRF considerations(4) -LEP Cavity Voltage &BBU
Commissioning Issues of BEPCII
RF introduction Anders Sunesson RF group leader
CEPC APDR and PDR scheme
CEPC SRF Parameters (100 km Main Ring)
JLEIC electron ring with damping wigglers
Presentation transcript:

JPSP-CAS co-operation in Superconducting RF of BEPCII Wang Guang-wei, Pan Wei-min, Sun YI ( 孙毅) RF group of IHEP Apr. 8, 2009

overall of SRF system of BEPCII

JSPS-CAS co-operation 500MHZ superconducting cavity Main parameter of SRF of BEPC-II Cavity voltage 1.5MV Beam power / Ring 130kW RF phase stability ±1º RF voltage stability ±1% RF Station phase 0º - 720º 250KW RF amplifier JSPS-CAS co-operation 500MHZ superconducting cavity LLRF interlock emergency quench arc P+ P_ Low level control

Key time of the co-operation in SRF of BEPCII (2004-2009) 2004~May,2005 two superconducting cavities fabrication, processing, vertical test at KEK Jun. 2006 first high power horizontal test of SCC at china mainland in the history Aug. 2006 2×SCC installation into tunnel 2005~2008 LLRF & beam commissioning 2006~2009 IHEP coupler test at KEK

Cavity fabrication, processing, vertical test at KEK Cavity assembly at KEK HOM damper test

SC cavity was transported to tunnel after the final assembled

SCC Vertical test at KEK (Nov.2004~Feb.2005) IHEP: G.Wang, W.Pan, Y.Sun, Z.Li, Q.Ma had taken part in SCC vertical test at KEK ( Nov.2004~Feb. 2005 )

First high power horizontal test in IHEP (Jun.2006) RF voltage >2MV Q0 > 5×108 radiation of E cavity is decreased after high power RF aging Experts from IHEP,KEK,MELCO,SSRF taken part in the high power test

SCC high power test result: (Jun.2006) KEK: T.Furuya , K. Akai, S.Mitsunobu, MELCO: 荒川 雅德 SSRF: Liujf, Guq, Houht, IHEP: Wanggw, Panwm, Suny, Lizq, Maq, Xub, Lisp, Hek, Liuyp, Zhangc, Mal, Xuzx, wangjq, etc. East SCC West SCC Static loss 30W 27W Q0(2MV) 5.4×108 1.02×109 Q0(1.8MV) 9.8×108 1.28×109 Q0 1.7×109(1.5MV) 1.44×109(1.6MV) QL 2×105 1.92×105 RF Pulse aging 50Hz/duty 5% Cut off RF power in a quench SCC under RF pulse aging P- P + RF voltage Reflect power Input power RF waveform to SCC

BEPCII cavities was installed at tunnel (Aug.2006)

Prof. K. Akai at LLRF design meeting ( IHEP Apr. 2004 )

LLRF commissioning at first beam run (2006~2007) Prof. K. Akai help Input RF power Reflect power 1.89 to 2.5GeV SR-ring operation(24 hrs) Vc 1.3MV (East SCC)

High power test of IHEP coupler at KEK (in 2008)

IHEP coupler test results The power reached is 270kW. (April, 2008) (highest power level in china)

(Got helps from Prof. T. Furuya and Prof. S. Mitsunobu) Praperation works before the high power test of couplers fabricated by IHEP was doing at KEK (Got helps from Prof. T. Furuya and Prof. S. Mitsunobu) High pressure rinsing ( W.Pan, Q. Ma, T.Huang T. Furuya ,S. Mitsunobu )

Future co-operation suggestion Spare cavity of BEPCII ( it is now under the fabrication in china ) High power input coupler Digital Low-level RF

Paper list: W. Pan, Y. Sun, G. Wang, T. Furuya and S. Kurokawa, “Studies on Higher Order Modes  in BEPC II Superconducting Cavity”, High Energy Physics and Nuclear Physics, Vol. 28, No. 3, March, 2004, pp 317-320. (2) Z. Li and C. Zhang, “Study of Heavily Damped SC RF Cavity”, High Energy Physics and Nuclear Physics, Vol. 27, No. 10, pp919-925, 2003. (3) T. Furuya, K. Akai, K. Hara, K. Hosoyama, A. Kabe, G. Katano, Y. Kojima, S. Mitsunobu, Y. Morita, H. Nakai and M. Yamaga, “Achievements of the Superconducting Damped Cavities in KEKB Accelerator”, Proc. of the 11th Workshop on RF-superconductivity, DESY, Germany, 8 – 12 Sept. 2003. (4) K. Akai, et al.,“RF Systems for the KEK B-Factory”, Nuclear Instruments and Methods in Physics Research, A 499, 2003, pp. 45-65. (5) W.M. Pan, G.W. Wang, Y. Sun, Z.Q. Li, H.Y. Lin, B. Xu, Q. Ma, T.M. Huang, P. Sha, “High Power conditioning of the Input Coupler for BEPCII Superconductor Cavity”, Proc of the 13th Workshop on RF Superconductivity, Beijing, China, 15-19 Oct. 2007. (6) Sun Yi , Wang Guangwei, Pan Weimin, Li Zhongquan, Ma Qiang, Lin Haiying, Li Shaopeng, He Kun, Liu Yaping, Huang Hong, Xu Bo, wang Qunyao, Huang Tongming, “Commissioning of BEPCII superconducting RF system”, Proc of the 13th Workshop on RF Superconductivity, Beijing, China, 15-19 Oct. 2007. (7) Yaping Liu, Li Shaopeng, He Kun, Sang Minjing, Ge Rui, Lv Chongwei, Bian Lin, Zhang Zhuo, “Cryogenic System for BEPCII Superconducting Cavity”, Proc of the 13th Workshop on RF Superconductivity, Beijing, China, 15-19 Oct. 2007. (8) Z.Q. Li, G.W. Wang, W.M. Pan, Y. Sun, S.P. Li, Q. Ma (IHEP). T. Furuya, S. Mitsunobu, K. Akai, Y. Yamamoto, Y. Kijima, M. Arakawa, Y. Okada, “Fabrication and Test of the 500MHz SC Modules for the BEPCII”, Proc of the 13th Workshop on RF Superconductivity, Beijing, China, 15-19 Oct. 2007. (9) G.W. Wang , W.M. Pan, Y. Sun, Z.Q. Li, G.Y. Zhao, H.Y. Lin, Y.F. Xu, H. Huang, Q. Ma, B. Xu, Q.Y. Wang, Y.P. Liu, P. Sha, T.M. Huang, R. Liu, R.H. Zeng, T. Furuya, S. Mitsunobu, K. Akai, “BEPCII RF system”, Proc of the 13th Workshop on RF Superconductivity, Beijing, China, 15-19 Oct. 2007.

Thanks to JSPS co-operation! Summary SRF system of BEPCII is one of the co-operation flowers between JSPS-CAS (KEK-IHEP) , just same as the blooming SAKURA at YU YUAN TAN park of BEIJING. 2004~2006, two SC cavities had been fabricated, processed, and tested in Japan; The first high power test had been successfully carried out in 2006 at IHEP. Two SRF systems above 1.5MV voltage have contributed to e+/e- collision beam over 2×500mA, and 2.5GeV/250mA of 100KW beam power in SR mode Since the end of 2006. thank Prof. S.Kurokawa for his great contribution to the superconducting cavity co-operation between IHEP and KEK, thank to Professors: K.Akai, T.Furuya, S.Mitsunobu, K.Hosoyama, for their kind help. Thanks to JSPS co-operation!