1 Mulch Lane Bridgeton Mo

Slides:



Advertisements
Similar presentations
Bond Construction Update Citizens Oversight Committee Long Beach Community College District July 21, 2008 BUILDING TOMORROW TODAY 1.
Advertisements

Medical Gas Rail.
New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
Constellation Heating and Cooling Building Automation Systems.
STI Test Facility: Photos Taken in Test Area and Two Labs: 18 May 2006.
Building Commissioning. What is building commissioning? Building commissioning is a systematic and documented process of ensuring that the owner’s operational.
{. Let one of our dedicated Service Trucks come to help you with your electrical needs.
The ice machines are available at various capacities and can be placed where needed in the site. Capacities range from 3 to 70 tons per day. The ice is.
FACILITIES AND PROPERTY MANAGEMENT – BEMS Plant and Equipment Operating Hours.
© ABB AB/Mining, 3BSE August 13, 2015 | Slide 1 Introducing Underground Mining CoE Underground Mining 2009.
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
Director's Message Suri Auto Pvt Ltd is the name made to be the best, by hard work, dedication and team spirit; the highlights that enhance our ongoing.
Successful Model for Campus-Wide Technology Management CLASSROOM TECHNOLOGY, SUPPORT AND REMOTE SITE CONTROL Successful Model for Campus-Wide Technology.
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
2730 Brighton Road, Unit-B, Oakville, Ontario,Canada L6H 5T4 Off: , Fax : Cell :
Solutions – Design to Delivery
DuPAGE Machine Products
Customer Presentation West River Rd. South Elyria, OH 44035—Phone: Fax:
Chamdor Plant Tungsten Street Plant Cobalt Street Plant Dedicated Welding And QC Facility Machine Shop THREE FOUNDRIES AND SUPPORTING PLANTS.
ESB G86 MAE Visiting Committee April 10, ESB G86 Innovation Build Center Provide Conventional and CNC Machining Capabilities Complement Industrial.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
How is a manufacturing facility planned?
JOHNSON CONTROLS IS A GLOBAL DIVERSIFIED TECHNOLOGY AND INDUSTRIAL LEADER SERVING CUSTOMERS IN MORE THAN 150 COUNTRIES.
Phoenix Convention Center Phoenix, Arizona Evolution of Energy Services Integrated Energy TrackIntegration of the Energy Industry Nicole Bulgarino Ameresco.
PlantMesh Overview. What IS PlantMesh? Self Healing, High Performance, Severe Duty, Plant and Industrial Wireless Networking System Why not use wired.
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
© ABB AB/Mining, 3BSE October 24, 2015 | Slide 1 Introducing Underground Mining CoE Underground Mining 2009 
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 1,
Bond Construction Update Facilities Advisory Committee Long Beach Community College District November 17, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Whitman-Hanson Regional High School Energy Efficient Systems: HVAC All fans and pumps are VFD controlled with fully reactive controls Condensing gas-fired.
Watch University Grow April 2008 Construction continues on University Hospital’s new Cardiovascular Center, a four-story, 199,000-square- foot facility.
Sietz discussion document for Shigeru Kogyo visit v6.pptx 0 CASTING & FORGING MACHINING.
„Tbilisi - Smart City“ LEPL - TECHNOLOGY DEVELOPMENT FUND (TDF) 2015.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
By Christie DeVantier.  The discharge of carbon left to pollute the air  The sum of emissions of green house gases.
PART L Problem or opportunity? Bill Wright Corporate Energy and Environment Manager, John Lewis plc.
RMIS Engineering At RMIS Engineering we specialise in Mechanical Engineering Contracting and Fabrication works to serve a wide range of industries in Carbon/Mild.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District July 26, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Olson Hall Classroom Renovations Rooms 101, 105, 118, 125, 141, 163, 227.
Welcome to Odyssey Industrial Systems. 2 Odyssey Today 18,000 Square feet of leased space in two buildings Outsourcing powder coating today; in-house.
Option 1 New Construction (10,000 Square Feet) – Secure Entrance / Administrative Offices – Lobby / Connection to Greeno Building – Weight Room Renovations.
Chilled Water Plant Overview From Project Concept To Operation July 26, 2007.
Association of Energy Engineers Randy Haines, CEM, CLEP, CMVP Energy Manager, Jefferson April 20, 2016.
Sustainability KSU Utilities Department. KSU Current Sustainability Initiatives: Plant Operations Update Energy Initiatives and Energy Savings Programs:
Welcome To Chamundi Die Cast Pvt. Ltd., MANUFACTURERS OF HIGH QUALITY, ALUMINIUM PRESSURE DIE CAST COMPONENTS. UNIT 2.
Madison Elementary School District
B-K Manufacturing Company, Inc.
Major Die & Engineering Co.
Welcome to.
JOHN A. HOLMES IMMEDIATE FACILITY NEEDS
Building Services Summer 2016 Update
Fun Facts: James M. Bennett High School
Electronics and Controls
CASTING & FORGING MACHINING
CBETA Technical Review
Capital Projects Requests
RECA PLAST SRL Silvia CARNEVALINI
Common Learning Blocks
Daniel Walczyk, PhD, PE Professor and Center Director.
Budget specification EHN1 Extension: Infrastructure (WG2)
B. 163 facility upgrade: work space options in B. 163 and B. 103 F
H-BRAKE Hybrid Serie.
A. Datum Corporation Bid package overview
GM Dealer Equipment Program
A. Datum Corp. Bid package overview.
What is a Zero Energy House?
Facilities Planning and Design Course code:
Company Overview Founded in 1967 by George S. Moxlow
Performance Measurement Review July 2018
Consolidated Shipping Logistics Centre
Presentation transcript:

1 Mulch Lane Bridgeton Mo. 63044 314-736-6560 Quest Specialty Products on the move…

TWO PLANTS CONSOLIDATED TO ONE NEWLY RENOVATED FACILITY…… PLANT # 2 MOVED APRIL 2016 (40,000 square feet) PLANT #1 MOVED JULY 2016 (27,000 square feet)

THE NEW FACILITY UPGRADES…. 60,000 SQUARE FOOT FACILITY WITH ROOM TO EXPAND TO OVER 100,000 SQUARE FEET NEW 3-PHASE HEAVY ELECTRIC (WITH ROOM TO GROW!) FULLY AIR CONDITIONED PLANT NEW ENERGY EFFICIENT LIGHTING NEW PLANT COMPRESSED AIR SYSTEM FULLY INTEGRATED SECURITY SYSTEM WITH CAMERAS 155 FOOT CRANE BAY WITH RAMP AND TWO CRANES FULLY CLIMATE CONTROLLED DEDICATED INSPECTION LAB CLIMATE CONTROLLED WIRE EDM ROOM DEDICATED ASSEMBLY ROOMS AND TEST LABS 10 ADDITIONAL CNC MACHINES …SOME WITH STATE OF THE ART PROBING TECHNOLOGY AND HIGH SPEED SPINDLES

Installation in the new facility of a 20,000 LB overhead crane that will connect to a truck ramp at one end of the building for raw material unloading and processing.

OVER 500 TONS OF CNC AND PRODUCTION EQUIPMENT MOVED…….!!

CNC PRODUCTION EQUIPMENT BEING MOVED INTO THE NEW FACILITY FROM PLANT 2

New facility start-up late spring 2016 New facility start-up late spring 2016. New high speed CNC machines in the foreground……

THE FUTURE…… Our newly renovated facility gives Quest Specialty Products the ability and the resources to grow with our customers and provide them the best possible service and value!